Zhenjiang Tan
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Zhenjiang Tan has a total of 4 co-authors. Here are the top co-authors by number of shared publications:
- Ming Sun
School of History and Culture, Jilin Normal University, Siping 136000, China
1 shared publication Wei Zhou
Jilin Normal University
1 shared publicationXueying Ding
Jilin Normal University
1 shared publicationZhiqiang Xie
Harbin University of Science and Technology
1 shared publication
Latest Publications
- Open Access
- 2 May 2024
- Published by Springer Nature in Research Square
Integrated scheduling algorithm with Dynamic Adjustment on Machine Idle Time
During the scheduling of the production of small batch and multi-variety products with treelike structure, many devices are idle due to the process constraints. This increases the makespan of production and reduces the utilization rate of the equipment. Aiming at improving this situation, a resource cooperative scheduling algorithm is proposed to dynamically adjust the idle time of equipment: the integrated scheduling algorithm with dynamic adjustment on machine idle time(ISA_DA). This algorithm adopts the critical path chain and the optimal scheduling strategy. Besides, the adjustment strategy considering the backward movement of the process is put forward to improve the intensity of the close connection of the process and the intensity of parallel processing. Experimental results show that the effect of the proposed algorithm is better than the comparison algorithms: the hierarchical scheduling order algorithm and the process tree cyclic decomposition algorithm. It can increase the equipment utilization rate by 10% and 11.5% respectively, and reduce the makespan by 28.6%.
- 2 May 2024
- Published by Springer Nature in Research Square
Open AccessIntegrated scheduling algorithm with Dynamic Adjustment on Machine Idle Time
During the scheduling of the production of small batch and multi-variety products with treelike structure, many devices are idle due to the process constraints. This increases the makespan of production and reduces the utilization rate of the equipment. Aiming at improving this situation, a resource cooperative scheduling algorithm is proposed to dynamically adjust the idle time of equipment: the integrated scheduling algorithm with dynamic adjustment on machine idle time(ISA_DA). This algorithm adopts the critical path chain and the optimal scheduling strategy. Besides, the adjustment strategy considering the backward movement of the process is put forward to improve the intensity of the close connection of the process and the intensity of parallel processing. Experimental results show that the effect of the proposed algorithm is better than the comparison algorithms: the hierarchical scheduling order algorithm and the process tree cyclic decomposition algorithm. It can increase the equipment utilization rate by 10% and 11.5% respectively, and reduce the makespan by 28.6%.