AAAdedapo Jacob Adeyemi

Adedapo Jacob Adeyemi

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Adedapo Jacob Adeyemi has a total of 4 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Evaluation of Geotechnical Properties and Suitability of Selected Laterite Sites in Ondo and Ekiti States for Mine Road Construction

    by Waliu Dayo Arowosaye, Thomas Busuyi Afeni, Johnson Adewumi, Adedapo Jacob Adeyemi

    This research evaluates the geotechnical properties of selected laterite soils from Ijigbo, Ado-Ekiti (Ekiti State) and Aluta Market, The Federal University of Technology Akure (Ondo State) to assess their suitability for mine road construction. The laterite samples from both locations were taken and subjected to a series of laboratory tests, including moisture content, specific gravity, atterberg limits, compaction (Standard Proctor Test), unconfined compressive strength (UCS), and grain size analysis. The results indicated that the FUTA Akure (AKR) sample had a significantly lower moisture content (0.42%) compared to the Ado-Ekiti (ADK) sample (1.35%), making AKR more favorable for road stability under varying moisture conditions. Specific gravity results showed AKR having a higher value (2.63) compared to ADK (2.52), suggesting better load-bearing capacity. The Atterberg Limits revealed lower liquid and plastic limits for AKR (25.30% and 11.1%, respectively) compared to ADK (35.89% and 28.9%), indicating that AKR is less prone to moisture-induced deformation. The linear shrinkage tests showed a shrinkage value of 1.5% for AKR and 8.2% for ADK, suggesting that AKR is less likely to undergo significant volumetric changes during dry conditions, which is crucial for maintaining road stability. The compaction test results showed that AKR had a higher maximum dry density (2.14 g/cm³) than ADK (1.82 g/cm³). UCS results also favored AKR, with a value of 261.7 kN/m², compared to ADK's 177.1 kN/m², indicating AKR has greater resistance to compressive forces, which is essential for mine roads subjected to heavy loads. The grain size analysis revealed that AKR contained 30.6% gravel, 59.66% sand, and 9.74% fines, while ADK contained 25.03% gravel, 65% sand, and 9.97% fines. AKR's higher gravel content and more balanced distribution make it more suitable for load-bearing and stability, while ADK's higher sand content may provide better drainage. Based on the geotechnical test results, the recommended stabilization techniques include lime stabilization to reduce plasticity, cement stabilization to improve compressive strength, and natural fiber reinforcement to enhance tensile strength and durability. Improved drainage systems are also advised to prevent moisture accumulation.

  • Open Access

    Assessment of Mine Plans for Production and Variations at Ibese Limestone Mines

    by Thomas Busuyi Afeni, Adedapo Jacob Adeyemi, Kolawole Tajudeen Mohammed

    This research investigated the mine plans used for the production target and annual production of limestone for the past seven (7) years. The actual amount of limestone produced per year in tons was computed to determine the variations in the mine's production and the life span of the reserve of limestone deposits. A new mine plan was proposed, and a targeted amount of limestone production per year was suggested. The mine plans for the mine's production were generated from 2014 to 2020 using a complete data collection system for Real Time (RTK) GPS and Total Stations with in-field coordinate geometry called SurCE by Carlson Software. The total production target for the seven (7) years was 87,017,146 tons and the actual production was 76,313,056 tons. The total variations for the years under this assessment were -10,704,090 tons except for the year 2018 when the actual production was higher than the production target of 511,179 tons. The volumetric reserve estimation revealed that the total volume of the limestone reserve is 5,052,236,090.186 tons. The expected production per week was computed to be 356,400 tons/week, expected monthly production, (EMP) was estimated to be 1,425,600 tons/month. The expected production year, (EPY) was 17,107,200 tons/year and the life span of the limestone deposit, (LS) was computed to be 295.34 years. It can be suggested that the company should target a production rate of 1,425,200 monthly and 17,104,200 per year. This suggestion can be achieved if there is enough investment in terms of skilled labour, heavy-duty machinery, and equipment which will cost-effectively boost production.