Pavlo Protsenko
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Pavlo Protsenko has a total of 3 co-authors. Here are the top co-authors by number of shared publications:
- Liubomyr Kuprych
Lviv Polytechnic National University
1 shared publication - Orest Shyiko
Lviv Polytechnic National University
1 shared publication - Orest Shyiko1 shared publication
Latest Publications
- 11 May 2026
- Published by Lviv Polytechnic National University in Theory and Building Practice
- Vol. 8 (2) , 112-119
PREFABRICATED-MONOLITHIC FRAME TECHNOLOGY IN MODERN CONSTRUCTION
This article explores the use of prefabricated-monolithic frame structures in modern construction, which include vertical elements (columns, shear walls) made of monolithic reinforced concrete, and horizontal slab elements made of prefabricated prestressed hollow-core concrete panels. These panels are integrated with primary and secondary monolithic reinforced concrete beams, poured after the installation of the panels, forming a rigid diaphragm structure. The construction technology involves placing the hollow-core panels on pre-installed supports and unifying them into a single system using beams poured in place in a flat plane, creating a completely flat slab without drop beams. This structural scheme significantly reduces labor costs and construction time. Furthermore, this method allows for considerable savings in concrete and steel reinforcement, reducing the weight of the floor system and, as a result, the loads transferred to the columns, foundations, and subgrade.
- 11 May 2026
- Published by Lviv Polytechnic National University in Theory and Building Practice
- Vol. 8 (2) , 112-119
PREFABRICATED-MONOLITHIC FRAME TECHNOLOGY IN MODERN CONSTRUCTION
This article explores the use of prefabricated-monolithic frame structures in modern construction, which include vertical elements (columns, shear walls) made of monolithic reinforced concrete, and horizontal slab elements made of prefabricated prestressed hollow-core concrete panels. These panels are integrated with primary and secondary monolithic reinforced concrete beams, poured after the installation of the panels, forming a rigid diaphragm structure. The construction technology involves placing the hollow-core panels on pre-installed supports and unifying them into a single system using beams poured in place in a flat plane, creating a completely flat slab without drop beams. This structural scheme significantly reduces labor costs and construction time. Furthermore, this method allows for considerable savings in concrete and steel reinforcement, reducing the weight of the floor system and, as a result, the loads transferred to the columns, foundations, and subgrade.
- 12 May 2025
- Published by Lviv Polytechnic National University in Theory and Building Practice
- Vol. 2025 (1) , 82-89
ORGANIZATIONAL STRUCTURES OF THE PROJECT MANAGEMENT IN CONSTRUCTION
The article is devoted to the issue of the transition of domestic construction enterprises to project management, which ensures the adaptation of enterprises to the rapidly changing conditions of the external environment in the market economy. The relationship between individual units of the organizational structure of project management is established. Particular attention is paid to the engineering analysis of the object, which includes the analysis of the architectural, planning and structural solutions of the building, basic materials, structures, engineering systems and equipment, as well as the choice of work methods. The possibility of adapting project management structures of foreign construction companies for use in domestic construction organizations in real construction conditions by introducing additional structural divisions and expanding the functional responsibilities of some performers during project implementation is shown.
- 12 May 2025
- Published by Lviv Polytechnic National University in Theory and Building Practice
- Vol. 2025 (1) , 82-89
ORGANIZATIONAL STRUCTURES OF THE PROJECT MANAGEMENT IN CONSTRUCTION
The article is devoted to the issue of the transition of domestic construction enterprises to project management, which ensures the adaptation of enterprises to the rapidly changing conditions of the external environment in the market economy. The relationship between individual units of the organizational structure of project management is established. Particular attention is paid to the engineering analysis of the object, which includes the analysis of the architectural, planning and structural solutions of the building, basic materials, structures, engineering systems and equipment, as well as the choice of work methods. The possibility of adapting project management structures of foreign construction companies for use in domestic construction organizations in real construction conditions by introducing additional structural divisions and expanding the functional responsibilities of some performers during project implementation is shown.