RIRachmad Irwanto

Rachmad Irwanto

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Rachmad Irwanto has a total of 9 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    RELEVANSI PENGGUNAAN BILANGAN FROUDE TERHADAP BILANGAN REYNOLDS DALAM SIMULASI LAMBUNG KAPAL

    by Rachmad Irwanto, Nidya Jullanar Salman

    Tulisan ini menjelaskan peran krusial bilangan Froude dalam simulasi lambung kapal, khususnya dalam memprediksi hambatan akibat pembentukan gelombang, yang mendominasi pada kapal displacement dalam kecepatan operasional. Dengan menggunakan kerangka teoretis serta simulasi iteratif menggunakan Matlab yang mencakup panjang kapal dari 50 m hingga 150 m dan bilangan Froude dari 0.1 hingga 0.4, telah ditunjukkan bahwa penskalaan berbasis bilangan Froude memastikan prediksi hambatan gelombang yang akurat dalam uji model. Sebaliknya, penskalaan berbasis bilangan Reynolds, yang menuntut kesetaraan bilangan Reynolds, menghasilkan kecepatan model yang tidak realistis serta pola gelombang yang terdistorsi, sehingga memunculkan estimasi hambatan yang keliru. Hasil simulasi dalam tulisan ini didukung oleh literatur terbaru, yang menegaskan peran esensial bilangan Froude dalam arsitektur kapal modern. Studi ini bertujuan untuk memberikan kejelasan mengenai penerapan angka tak berdimensi dalam desain kapal, sehingga meningkatkan akurasi dan efisiensi prediksi performa kapal bagi para arsitek kapal dan mahasiswa yang mempelajari bidang ini.

  • Open Access

    NUMERICAL STUDY ON BEHAVIOUR OF COLD-FORMED STEEL UNLIPPED CHANNEL SUBJECT TO AXIAL COMPRESSION

    by Hidayat Mughnie, Budiman Budiman, Rachmad Irwanto, Muhammad Taufiq Al Hafidz

    Innovation in obtaining construction materials that are efficient and applicable to various conditions is a challenge for researchers. Cold-formed steel is a material breakthrough in construction that has advantages over hot-rolled steel. Many studies have been carried out on Cold-formedsteel subjected to various loadings to examine the behavior and capacities of the sections. This study aims to investigate the behavior and section capacity of cold-formed steel unlipped channels due to axial compression loads. This research begins with conducting a literature study, then carrying out numerical analysis using the finite element method in ABAQUS, numerical test, and calculation of section capacity based on existing research in the literature. The calculation of section capacity is carried out based on SNI 7971-2013 or AS/NZS 4600:2005. The results of the numerical analysis can be seen from the behavior and capacities of the sections of the unlipped channel, the section capacity from the numerical test will be compared with the section capacity obtained from the calculation based on SNI 7971-2013 or AS/NZS 4600.


  • Open Access

    RISK MANAGEMENT IN THE JABODEBEK LRT (LIGHT RAIL TRANSIT) DEVEL-OPMENT PROJECT, IN JAKARTA AND ITS NEIGHBOURING CITIES

    by Trijeti Trijeti, Andi Madeppungeng, Rachmat Said Rasul, Rachmad Irwanto

    LRT (Light Rail Transit) is one solution for an environmentally friendly transportation system to overcome congestion problems that occur in Jakarta. This mass transportation is considered effective because there is less land in the capital for road construction. The project is a complex project that includes design, material procurement and construction. The development that is currently underway is cross-service 1 (Cawang-Cibubur), cross-service 2 (Cawang-Dukuh Atas) and cross-service 3 (Cawang-Bekasi East). This study aims to determine the risks that often arise and find out the right way to handle the risks that arise in the construction of the JABODEBEK LRT project. Data was collected using a questionnaire on 45 respondents who were involved in the construction of the JABODEBEK LRT project. The variables studied in this study are aspects of scheduling planning, aspects of scope and work documents (contracts), aspects of organizational systems, coordination and communication, aspects of resource readiness/preparation, aspects of inspection systems, work control and evaluation and other aspects (force majeure /beyond the ability of the owner and contractor). Data processing in this study used the SPSS version 25 program. This study discusses seven variables classified as high risk (H) in the project.


  • Open Access

    WHAT ACTUALLY DRIVE CONSTRUCTION PROJECT PERFORMANCE FROM OPERATIONS MANAGEMENT PERSPECTIVE

    by Rachmad Irwanto

    Construction industry is always an interesting discussion topic. Some have it approached from its planning and scheduling view accommodating risk analysis. Other interesting topics related to construction industry are its business model, organization and operations. The author argues that construction is a function of them all. An emphasized study on a specific topic above would be less relevant given the fact that construction industry is highly fragmented. From literature review, factors such project integration, communications, knowledge and understanding, human resources, safety, financial, and cost management drive more significant impact on project scheduling performance

  • Open Access

    EFFECTIVENESS OF GOVERNMENT’S ELECTRONIC PROCUREMENT OF GOODS AND SERVICES IN ITS ROLE WITHIN THE GOVERNMENT’S PROJECTS

    by Yan Ari Wibowo, Trijeti Trijeti, Rachmad Irwanto

    The government’s goods and services procurement are the major part in the state budget realization for its impact on performance of government’s departments. Considering the growing number of goods and services procurements, the government rules to set the procurement of goods and services electronically. This helps the government to run the state budget realization that is good in timekeeping, efficiency and accountability during procurement process. The effectiveness of electronic procurement of goods and services (e-procurement) of the government is strongly related to the government’s projects. This is presented in this study using a descriptive quantitative method on processed data output from SPSS v.23. The data was sourced from recorded government’s project in LKPP in 2019. The result shows good effectiveness level at 65,9% with supporting strong correlation value at 0,812 following consummated budget at 95,71%. Based on those statistics, this paper suggests that the run of government’s projects automatically would induce a consummated budget in which targets would be achieved and provide more benefits. Therefore, a good run of government’s projects needs better effectiveness of the government’s e-procurement of goods and services.

  • Open Access

    Analysis of Redundant Building Construction Material: A Case Study for A Hospital Building Project in Bogor

    by Aditya Gilang Rakasiwi, Trijeti Trijeti, Rachmad Irwanto

    Construction materials are very significant spending in a construction project. They may create losses to Implementation Budget Plan (IBP) whenever the number is excessive. This paper is intended to find causes of redundant materials for guidelines to next projects to avoid excessive number of redundant materials. This paper details driving factors to material redundancy, total value of redundant materials and percentage ratio of redundant materials total value over IBP value. To obtain those factors causing redundant materials, this research run a set of questionnaires referenced from journals and refined by expert professionals. The questionnaires set was then handed to managerial peers and other non-managerial respondents to acquire their responses. The questionnaire outcome provides clues on major driving factors. They are lack of control at site, lack of supervision and lack of allocated facility for redundant materials. Further studies in this paper using price details in IBP and unit conversion on redundant materials have come to a material redundant value of Rp. 383.940.000 from an IBP value of Rp. 31.125.169.000. The highest percentage ratio of redundant materials is from ceramics fitting works at 34.18% while total value percentage ratio of redundant materials over IBP is 1.23%.