Servet Karahan
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Servet Karahan has a total of 9 co-authors. Here are the top co-authors by number of shared publications:
- Candan Gokceoglu
Faculty of Computer and Information Sciences, Cappadocia University, Mustafapasa, Urgup, Türkiye
5 shared publications - Evren Poşluk
TCDD 1. Bölge Müdürlüğü
4 shared publications - Süleyman Dalgıç
Istanbul University, Turkey
2 shared publications - Ebu Bekir Aygar
Fugro Sial Geosciences Consulting Engineering Co., Cankaya, Ankara 06680, Türkiye
1 shared publication - Ebu Bekir Aygar
FUGRO SIAL EARTH SCIENCES CONSULTANCY AND ENGINEERING
1 shared publication - Elif Apaydin Posluk
Department of Geological Engineering, Istanbul University-Cerrahpasa, Istanbul, Turkey
1 shared publication
Latest Publications
- 29 May 2026
- Published by Springer Nature in Journal of Mountain Science
- Vol. 23 (5) , 1884-1906
A century of tunnel-landslide interaction: Anatomy of T7 Tunnel, Nurhak–Gölbaşı (Türkiye)
- 29 May 2026
- Published by Springer Nature in Journal of Mountain Science
- Vol. 23 (5) , 1884-1906
A century of tunnel-landslide interaction: Anatomy of T7 Tunnel, Nurhak–Gölbaşı (Türkiye)
- 13 December 2025
- Published by Springer Nature in Geotechnical and Geological Engineering
- Vol. 44 (1) , 38
Assessment of support system for tunnel excavation in highly squeezing fault zone conditions
- 13 December 2025
- Published by Springer Nature in Geotechnical and Geological Engineering
- Vol. 44 (1) , 38
Assessment of support system for tunnel excavation in highly squeezing fault zone conditions
- Open Access
- 11 June 2025
- Published by Jeoloji Muhendisligi Dergisi in Jeoloji Mühendisliği Dergisi
- Vol. 49 (1) , 105-120
Zayıf ve Sıkışan Kaya Kütlesinde Açılan Bir Tünel için Rijit Destek Sistemi Çözümü (T34-GT2 Tüneli, Ankara-İstanbul YHT Projesi)
Bu çalışmaya konu olan T34-GT2 Tüneli, 4,5 m genişliğinde 5 m yüksekliğinde olup, Ankara-İstanbul Hızlı Tren Projesi kapsamında T34 Tünelinde (km: 229+360-231+578) yolcu güvenliğini sağlamak amacıyla inşaa edilmiştir. Tünel 25 m uzunluğunda ve tamamı Karbonifer-Permiyen yaşlı meta-kırıntılı birimler içindedir. Tünel yaklaşık 650 eğimli normal fay tarafından kesilmektedir. Bu fay boyunca bir zon olarak zayıf ve sıkışan kaya özelliğinde meta-kırıntılılar bulunmaktadır. Bu tür kaya ortamları, tünel destek sistemi tasarımı açısından kritik öneme sahiptir. Benzer kaya koşullarında açılan tünellerde ayna ve tavan stabilite sorunlarının yanında ciddi deformasyonların olduğu bilinmektedir. Bu nedenle bu çalışmada tünelcilik açısından özel problemler içeren T34-GT2 Tünelinde bulunan fay zonuna odaklanılmış en uygun destek sisteminin analizlerle ortaya konulması amaçlanmıştır. Bu amaçla tünelin sıkışma potansiyeli belirlenmiş, hızlı kazı, güçlü destek, düşük deformasyon prensiplerine dayanan rijit destek sistemi tasarlanmıştır. Tasarlanan destek sistemi sayısal analiz yöntemleri kullanarak detaylandırılmış ve elde edilen sonuçlar tünel kazı ve destek aşamalarında dikkate alınmıştır. Ardından analiz sonuçları tünelde gerçekleşen deformasyonlarla kıyaslanmıştır. Sonuç olarak, sayısal analizler ile tünelde gerçekleşen deformasyonların birbirine yakın olduğu ve önerilen rijit destek sisteminin benzer kaya koşullarında uygulanabilir bir yaklaşım olduğu belirlenmiştir.
- 11 June 2025
- Published by Jeoloji Muhendisligi Dergisi in Jeoloji Mühendisliği Dergisi
- Vol. 49 (1) , 105-120
Open AccessZayıf ve Sıkışan Kaya Kütlesinde Açılan Bir Tünel için Rijit Destek Sistemi Çözümü (T34-GT2 Tüneli, Ankara-İstanbul YHT Projesi)
Bu çalışmaya konu olan T34-GT2 Tüneli, 4,5 m genişliğinde 5 m yüksekliğinde olup, Ankara-İstanbul Hızlı Tren Projesi kapsamında T34 Tünelinde (km: 229+360-231+578) yolcu güvenliğini sağlamak amacıyla inşaa edilmiştir. Tünel 25 m uzunluğunda ve tamamı Karbonifer-Permiyen yaşlı meta-kırıntılı birimler içindedir. Tünel yaklaşık 650 eğimli normal fay tarafından kesilmektedir. Bu fay boyunca bir zon olarak zayıf ve sıkışan kaya özelliğinde meta-kırıntılılar bulunmaktadır. Bu tür kaya ortamları, tünel destek sistemi tasarımı açısından kritik öneme sahiptir. Benzer kaya koşullarında açılan tünellerde ayna ve tavan stabilite sorunlarının yanında ciddi deformasyonların olduğu bilinmektedir. Bu nedenle bu çalışmada tünelcilik açısından özel problemler içeren T34-GT2 Tünelinde bulunan fay zonuna odaklanılmış en uygun destek sisteminin analizlerle ortaya konulması amaçlanmıştır. Bu amaçla tünelin sıkışma potansiyeli belirlenmiş, hızlı kazı, güçlü destek, düşük deformasyon prensiplerine dayanan rijit destek sistemi tasarlanmıştır. Tasarlanan destek sistemi sayısal analiz yöntemleri kullanarak detaylandırılmış ve elde edilen sonuçlar tünel kazı ve destek aşamalarında dikkate alınmıştır. Ardından analiz sonuçları tünelde gerçekleşen deformasyonlarla kıyaslanmıştır. Sonuç olarak, sayısal analizler ile tünelde gerçekleşen deformasyonların birbirine yakın olduğu ve önerilen rijit destek sisteminin benzer kaya koşullarında uygulanabilir bir yaklaşım olduğu belirlenmiştir.
- Open Access
- 1 January 2025
- Published by Wiley in Advances in Civil Engineering
- Vol. 2025 (1)
An Empirical Equation for Tunnel Squeezing Prediction in Weak Rock Masses
Squeezing in tunnels is a major problem in tunnel engineering that involves cost and occupational safety risks as well as changes in tunnel shape. Accurate estimation of squeezing is important in the early stages of tunnel design and in terms of solving problems during construction. Previous studies on tunnel estimation evaluated tunnels under high overburden thickness. This study focused on tunnels excavated in schists with high tectonic effects, less than 300 m overburden, and weak rock masses. Within the scope of the study, an empirical expression is proposed, which provides fast and simple calculation opportunities. In the correlation, rock mass quality Q , maximum in‐situ stress ( σ max ) calculated with k value, and support stiffness ( K max ) were used as main parameters. The equation was obtained employing 342 different cases in four different tunnels constructed in schists subjected to high tectonic effects. While obtaining the empirical equation, calculations were performed with regression coefficients ranging from 0.01 to 0.99 in the “polynomial regression curvefit method,” one of the machine learning methods. As a result, it was determined that the empirical equation obtained with a regression coefficient of 0.21 predicted the tunnel squeezing condition with over 80% accuracy. In addition, it was determined that the proposed empirical equation also provides a usable approach for strain estimation. The empirical equation proposed in the study offers a new approach in predicting squeezing in tunnels where the overburden thickness and rock quality are low and tectonic effects are high, and it is recommended to expand its scope for different tunnel conditions.
- 1 January 2025
- Published by Wiley in Advances in Civil Engineering
- Vol. 2025 (1)
Open AccessAn Empirical Equation for Tunnel Squeezing Prediction in Weak Rock Masses
Squeezing in tunnels is a major problem in tunnel engineering that involves cost and occupational safety risks as well as changes in tunnel shape. Accurate estimation of squeezing is important in the early stages of tunnel design and in terms of solving problems during construction. Previous studies on tunnel estimation evaluated tunnels under high overburden thickness. This study focused on tunnels excavated in schists with high tectonic effects, less than 300 m overburden, and weak rock masses. Within the scope of the study, an empirical expression is proposed, which provides fast and simple calculation opportunities. In the correlation, rock mass quality Q , maximum in‐situ stress ( σ max ) calculated with k value, and support stiffness ( K max ) were used as main parameters. The equation was obtained employing 342 different cases in four different tunnels constructed in schists subjected to high tectonic effects. While obtaining the empirical equation, calculations were performed with regression coefficients ranging from 0.01 to 0.99 in the “polynomial regression curvefit method,” one of the machine learning methods. As a result, it was determined that the empirical equation obtained with a regression coefficient of 0.21 predicted the tunnel squeezing condition with over 80% accuracy. In addition, it was determined that the proposed empirical equation also provides a usable approach for strain estimation. The empirical equation proposed in the study offers a new approach in predicting squeezing in tunnels where the overburden thickness and rock quality are low and tectonic effects are high, and it is recommended to expand its scope for different tunnel conditions.
- Open Access
- 14 November 2022
- Published by MDPI AG in Infrastructures
- Vol. 7 (11) , 155
A Geotechnical Perspective on a Complex Geological Environment in a High-Speed Railway Tunnel Excavation (A Case Study from Türkiye)
The T26 tunnel was designed within the scope of the Ankara-Istanbul high-speed railway in accordance with the speed of 250 km/h. Some serious problems and excessive deformations were encountered during the excavation works. The deformations in the tunnel caused subsidence on the surface and the Tunnel Boring Machine (TBM) became stuck; therefore, tunnel excavation works were suspended. Design works for re-excavation in the T26 tunnel and extracting of the TBM were carried out and the tunnel was re-designed by the New Austrian Tunneling Method (NATM) system. The main purposes of the present study are to describe the problems encountered during the T26 tunnel and to discuss the sources of the problems. The advantages and disadvantages of TBM and NATM methods for the tunnel having difficult ground conditions were discussed. Critical points needing to be considered for the tunnels excavated with TBM through weak ground conditions and the effect of the TBM selection process were discussed. Considering the complex geological and geotechnical structure of the tunnel route, it is possible to say that the T26 case is an interesting case for tunnel engineering. Along the tunnel route, landslides, high seismic activity, groundwater conditions, and extremely weak rock mass features coexist. Therefore, the tunnel route is a very complex environment. However, due to the geometric limitations of the high-speed railways, relocation of the route is not possible. The experiences gained from tunnel excavations under difficult conditions are capable of bringing new horizons to future tunneling studies.
- 14 November 2022
- Published by MDPI AG in Infrastructures
- Vol. 7 (11) , 155
Open AccessA Geotechnical Perspective on a Complex Geological Environment in a High-Speed Railway Tunnel Excavation (A Case Study from Türkiye)
The T26 tunnel was designed within the scope of the Ankara-Istanbul high-speed railway in accordance with the speed of 250 km/h. Some serious problems and excessive deformations were encountered during the excavation works. The deformations in the tunnel caused subsidence on the surface and the Tunnel Boring Machine (TBM) became stuck; therefore, tunnel excavation works were suspended. Design works for re-excavation in the T26 tunnel and extracting of the TBM were carried out and the tunnel was re-designed by the New Austrian Tunneling Method (NATM) system. The main purposes of the present study are to describe the problems encountered during the T26 tunnel and to discuss the sources of the problems. The advantages and disadvantages of TBM and NATM methods for the tunnel having difficult ground conditions were discussed. Critical points needing to be considered for the tunnels excavated with TBM through weak ground conditions and the effect of the TBM selection process were discussed. Considering the complex geological and geotechnical structure of the tunnel route, it is possible to say that the T26 case is an interesting case for tunnel engineering. Along the tunnel route, landslides, high seismic activity, groundwater conditions, and extremely weak rock mass features coexist. Therefore, the tunnel route is a very complex environment. However, due to the geometric limitations of the high-speed railways, relocation of the route is not possible. The experiences gained from tunnel excavations under difficult conditions are capable of bringing new horizons to future tunneling studies.