Youngjun Go
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Youngjun Go has a total of 11 co-authors. Here are the top co-authors by number of shared publications:
- Duehee Lee
Department of Electrical and Electronic Engineering, Konkuk University, Seoul, Republic of Korea
3 shared publications - Hyeonjin Kim
Pacific Northwest National Laboratory, Richland, WA 99354, USA
1 shared publication - Jin-Ho Chung
Department of Electrical, Electronic and Computer Engineering, University of Ulsan, Ulsan 44610, Republic of Korea
1 shared publication - Jung-Hyeop Im
Department of Electrical Engineering, Konkuk University, Seoul, Korea
1 shared publication - Junghyeop Im
Department of Electrical and Electronic Engineering, Konkuk University, Seoul 05029, Republic of Korea
1 shared publication Minkyu Jung
Konkuk University
1 shared publication
Latest Publications
- Open Access
- 1 January 2026
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Access
- Vol. 14, 144547-144561
Trading Strategies for ERCOT Day-Ahead Point-to-Point Obligations With Coordinated Multiple ESS Operation Under CVaR Risk Limits
- 1 January 2026
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Access
- Vol. 14, 144547-144561
Open AccessTrading Strategies for ERCOT Day-Ahead Point-to-Point Obligations With Coordinated Multiple ESS Operation Under CVaR Risk Limits
- Open Access
- 5 December 2025
- Published by MDPI AG in Mathematics
- Vol. 13 (24) , 3898
Fair Transmission Expansion Cost Allocation for Renewable Energy Resource Interconnection Based on Stochastic Cooperative Game Theory
We propose a fair transmission expansion cost allocation (CA) algorithm and a fair process to build alternative transmission expansion plans. We define fairness such that each participant’s payment does not exceed its own benefit and the total payment equals the total TEP cost. In our framework, excessive payments over generator benefits are minimized. Owners of renewable energy resources (RES)s can choose the point of interconnection via the CA algorithm; owners in the same interconnection queue may form an intermediate coalition to persuade owners of expensive bottleneck plans to change at reduced allocation cost. Fairness is implemented using stochastic cooperative game theory (SCGT); the fair CA is obtained by recursively minimizing the largest unfairness, which is the difference between payments and benefits, through coalitions. Benefits consider transmission usage, transmission-induced gains, and the variability of RESs and demand. We design spatially and temporally correlated RESs and demand scenarios using Gibbs sampling specialized for long-term interconnection studies, validate plausibility against a benchmark from the Global Probabilistic Mid-term Load Forecasting Competition 2017, and verify fairness by showing that entities with greater benefits pay larger costs.
- 5 December 2025
- Published by MDPI AG in Mathematics
- Vol. 13 (24) , 3898
Open AccessFair Transmission Expansion Cost Allocation for Renewable Energy Resource Interconnection Based on Stochastic Cooperative Game Theory
We propose a fair transmission expansion cost allocation (CA) algorithm and a fair process to build alternative transmission expansion plans. We define fairness such that each participant’s payment does not exceed its own benefit and the total payment equals the total TEP cost. In our framework, excessive payments over generator benefits are minimized. Owners of renewable energy resources (RES)s can choose the point of interconnection via the CA algorithm; owners in the same interconnection queue may form an intermediate coalition to persuade owners of expensive bottleneck plans to change at reduced allocation cost. Fairness is implemented using stochastic cooperative game theory (SCGT); the fair CA is obtained by recursively minimizing the largest unfairness, which is the difference between payments and benefits, through coalitions. Benefits consider transmission usage, transmission-induced gains, and the variability of RESs and demand. We design spatially and temporally correlated RESs and demand scenarios using Gibbs sampling specialized for long-term interconnection studies, validate plausibility against a benchmark from the Global Probabilistic Mid-term Load Forecasting Competition 2017, and verify fairness by showing that entities with greater benefits pay larger costs.
- 31 March 2025
- Published by Springer Nature in Journal of Electrical Engineering & Technology
- Vol. 20 (5) , 2881-2899
Long-Term Demand Forecasting: Novel Decomposition-Linear Exponential-Smoothing Algorithm with Long Short-Term Memory
- 31 March 2025
- Published by Springer Nature in Journal of Electrical Engineering & Technology
- Vol. 20 (5) , 2881-2899
Long-Term Demand Forecasting: Novel Decomposition-Linear Exponential-Smoothing Algorithm with Long Short-Term Memory