RMRoger Myers

Roger Myers

*This is an algorithmically generated author record based on publicly available information.

Roger Myers has a total of 6 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Development and application of a Hall thruster plume-spacecraft interactions modeling package for Astranis MicroGEO satellites

    by Colin Hegarty, Roger Myers

    Astranis designs, manufactures, and operates MicroGEO satellites to provide internet access from geostationary orbit. Electric propulsion plays an enabling role by providing capability for orbit raise, stationkeeping, and slot relocation in a miniaturized bus. The unconventional electric thruster placement on MicroGEO spacecraft, in addition to their compact form factor, necessitates careful analysis of interactions between thruster plumes and spacecraft surfaces and design to mitigate resulting risks. If not properly accounted for, plumes may cause sputtering erosion of coatings, degradation of surface optical properties via deposition of eroded material, undesired torques and thermal loads, parasitic current collection by solar arrays, and attenuation of electromagnetic waves. Astranis has developed an in-house toolset to model interactions between plumes and spacecraft surfaces and uses this toolset to help drive spacecraft design. A ground test supported validation of the erosion-deposition-optical modeling chain. This paper provides an overview of plume interactions characterization at Astranis, where rapid development makes analytical models essential in addressing plume-induced risks. MicroGEO Block 2 hardware and operations design decisions were guided by an analysis of power and thermal system impacts of erosion and subsequent redeposition from a deployable reflector onto solar array and radiator surfaces. The success of the bus design in avoiding problematic plume impacts has been demonstrated by completion of full electric orbit raise on multiple spacecraft.


  • Open Access

    Hall Thruster Plume Interactions Analysis and Mitigation for Astranis MicroGEO Satellites

    by Colin Hegarty, Roger Myers

    Astranis designs, manufactures, and operates MicroGEO satellites to provide internet access from geostationary orbit. Electric propulsion plays an enabling role by providing capability for orbit raise, stationkeeping, and slot relocation in a miniaturized bus.The unconventional electric thruster placement on MicroGEO spacecraft, in addition to their compact form factor, necessitates careful analysis of interactions between thruster plumes and spacecraft surfaces and design to mitigate resulting risks. If not properly accounted for, plumes may cause sputtering erosion of coatings, degradation of surface optical properties via deposition of eroded material, undesired torques and thermal loads, parasitic current collection by solar arrays, and attenuation of electromagnetic waves.Astranis has developed an in-house toolset to model interactions between plumes and spacecraft surfaces and uses this toolset to help drive spacecraft design.To validate analysis tools and characterize materials important to erosion and deposition, a ground test campaign is ongoing in which samples are exposed to the plume of a Hall thruster and permitted to deposit ultrathin films onto various substrates.This paper provides an overview of plume interactions characterization at Astranis, where rapid development makes analytical models and uncertainty management essential in addressing plume-induced risks. An analysis of the power and thermal system impacts of erosion and subsequent redeposition from a deployable reflector onto solar array and radiator surfaces on the MicroGEO Block 2 spacecraft guided hardware and operations design. The success of the bus design in avoiding problematic plume impacts has been demonstrated by completion of full electric orbit raise on multiple spacecraft.


  • Open Access

    Nuclear electric propulsion for Saturn and Enceladus science missions

    by Matthew E. Duchek, Adam Boylston, Devin Langford, Sean J. Greenhalge, Kurt Polzin, Roger Myers

    Nuclear electric propulsion (NEP) combines the high specific impulse of electric thrusters with a constant power source that can operate anywhere in the solar system. Current investments in fission surface power offer a starting point for development of an NEP capability for deep space science missions, with a mission to the Saturn system illustrating the potential of such a system. Minimum time of flight transits, maximum payload delivery, and a sample return from Enceladus are considered. The NEP system can deliver payloads to the Saturn system with similar transit times to the Cassini spacecraft without requiring the planetary flyby maneuvers, and when coupled with a heavy-lift launch vehicle an NEP-powered spacecraft can complete a Saturn transit significantly faster than Cassini. High payload masses can be delivered on a longer trajectory at the expense of transit time. An NEP system launched on a Falcon Heavy-Expendable is found to deliver a maximum payload mass to Enceladus of over 1000 kg when the NEP system is sized to operate at a propulsion power level of 10 kWe. For an NEP system launched by a Space Launch System (SLS) vehicle, a propulsion power level of 20 kWe yields the maximum delivered mass of over 8000 kg. Replacing a portion of the payload with propellant allows for a high degree of maneuverability upon reaching the Saturn system. A 25 – 40 kWe system provides the shortest interplanetary transit time, under 6.5 years launching with a Falcon Heavy-Expendable or under four years using SLS. The optimal power for shortest transit time falls within this range, varying as a function of payload mass and launch vehicle. A conceptual assessment of an Enceladus sample return mission indicates that such a mission may be feasible, where the NEP system is used for the Saturn departure and Earth insertion maneuvers, but it does require the electric propulsion system impart a high ΔV of approximately 30 km/s and that the spacecraft operate for a mission duration of 23 years.