Jose Conto
Research Subjects
Jose Conto has a total of 14 co-authors. Here are the top co-authors by number of shared publications:
Bg Vyakaranam
Pacific Northwest National Laboratory, Richland, WA, 99352, USA
1 shared publicationFk Tuffner
Pacific Northwest National Laboratory, Richland, WA, 99352, USA
1 shared publicationJe Dagle
Pacific Northwest National Laboratory, Richland, WA, 99352, USA
1 shared publication- John Schmall
Electric Reliability Council of Texas, Taylor, TX, USA
1 shared publication - Jonathan Rose
Electric Reliability Council of Texas, Taylor, TX, USA
1 shared publication LE Miller
Pacific Northwest National Laboratory, Richland, WA, 99352, USA
1 shared publication
Latest Publications
- 20 August 2025
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Power and Energy Magazine
- Vol. 23 (5) , 56-67
Texas Loads Ride Toward Grid Stability: Voltage Ride Through of Large Power Electronic Loads
ERCOT, the independent system operator (ISO) for the Texas region, USA, continuously assesses the reliability of its grid. With the increase of large loads interconnecting to the electric grid, including large data centers and crypto mining centers, maintaining grid reliability can become more challenging depending on the size of the load, its geographical location, its ramping controls, and network conditions. Further, a load’s lack of voltage ride-through (VRT) capability or frequency ride-through (FRT) capability could degrade system reliability. Additionally, these loads could introduce new vulnerabilities to sub-synchronous oscillations (SSO) or sub-synchronous control interactions (SSCI). This article will review realistic critical scenarios that require planning or operation level studies to assess reliability. These assessments will consider VRT and FRT tests with updated models, evaluations of large load on regions with known stability constraints, system impact of co-located load with generation, SSO/SSCI vulnerabilities and other similar reliability challenges.
- 20 August 2025
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Power and Energy Magazine
- Vol. 23 (5) , 56-67
Texas Loads Ride Toward Grid Stability: Voltage Ride Through of Large Power Electronic Loads
ERCOT, the independent system operator (ISO) for the Texas region, USA, continuously assesses the reliability of its grid. With the increase of large loads interconnecting to the electric grid, including large data centers and crypto mining centers, maintaining grid reliability can become more challenging depending on the size of the load, its geographical location, its ramping controls, and network conditions. Further, a load’s lack of voltage ride-through (VRT) capability or frequency ride-through (FRT) capability could degrade system reliability. Additionally, these loads could introduce new vulnerabilities to sub-synchronous oscillations (SSO) or sub-synchronous control interactions (SSCI). This article will review realistic critical scenarios that require planning or operation level studies to assess reliability. These assessments will consider VRT and FRT tests with updated models, evaluations of large load on regions with known stability constraints, system impact of co-located load with generation, SSO/SSCI vulnerabilities and other similar reliability challenges.
- 14 November 2016
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-5
Modeling of protection in dynamic simulation using generic relay models and settings
This paper shows how generic protection relay models available in planning tools can be augmented with settings that are based on NERC standards or best engineering practice. Selected generic relay models in Siemens PSS®E have been used in dynamic simulations in the proposed approach. Undervoltage, overvoltage, underfrequency, and overfrequency relays have been modeled for each generating unit. Distance-relay protection was modeled for transmission system protection. Two types of load-shedding schemes were modeled: underfrequency (frequency-responsive non-firm load shedding) and underfrequency and undervoltage firm load shedding. Several case studies are given to show the impact of protection devices on dynamic simulations. This is useful for simulating cascading outages.
- 14 November 2016
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-5
Modeling of protection in dynamic simulation using generic relay models and settings
This paper shows how generic protection relay models available in planning tools can be augmented with settings that are based on NERC standards or best engineering practice. Selected generic relay models in Siemens PSS®E have been used in dynamic simulations in the proposed approach. Undervoltage, overvoltage, underfrequency, and overfrequency relays have been modeled for each generating unit. Distance-relay protection was modeled for transmission system protection. Two types of load-shedding schemes were modeled: underfrequency (frequency-responsive non-firm load shedding) and underfrequency and undervoltage firm load shedding. Several case studies are given to show the impact of protection devices on dynamic simulations. This is useful for simulating cascading outages.