Guo Yanru
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Research Interests
Guo Yanru has a total of 10 co-authors. Here are the top co-authors by number of shared publications:
Chen Xiaokun
College of Safety Science and Engineering, Xi’an University of Science and Technology, Xi’an, China
1 shared publication- Chenxing Wei
College of Petroleum Engineering, Guangdong University of Petrochemical Technology, Maoming 525000, China
1 shared publication Li Min
Chendu Textile College, Chengdu, China
1 shared publicationLin Tiejun
State Key Laboratory of Oil and Gas Reservoir Geology and Exploitation, Southwest Petroleum University, Chengdu, China
1 shared publication- Lin Tiejun
State Key Laboratory of Oil and Gas Reservoir Geology and Exploitation, Southwest Petroleum University, Chengdu 610500, China
1 shared publication - Qiuhong Wang
College of Safety Science and Engineering, Xi’an University of Science and Technology, Xi’an 710054, China
1 shared publication
Latest Publications
- 1 January 2026
- Published by Springer Nature in Chemistry and Technology of Fuels and Oils
- Vol. 61 (6) , 1721-1730
Analysis of the Mixing Performance of a Novel Gas Mixer
- 1 January 2026
- Published by Springer Nature in Chemistry and Technology of Fuels and Oils
- Vol. 61 (6) , 1721-1730
Analysis of the Mixing Performance of a Novel Gas Mixer
- Open Access
Erosion Wear Characteristics of V-Shaped Elbow in Blooey Line
In gas drilling operations, the blooey line is highly susceptible to erosion-induced leakage. This study focuses on the use of field-welded V-shaped elbows in blooey lines, establishing a numerical method for erosion prediction and validating its accuracy through experimental data. The numerical results reveal that, due to the inclined configuration of the V-shaped elbow, particles from the central inlet flow directly impact the outer wall of the outlet pipe opposite the inlet, and then rebound and strike the inner wall. Meanwhile, solid particles near the pipeline wall on both sides of the inclined plane collide with the outer wall and exit in a helical flow pattern along the outlet pipe. The maximum erosion rate (3.6 × 10−4 kg/(m2·s)) occurs at the intersection of these spiral particle flows. Based on erosion predictions under various operating conditions, an empirical formula was established to correlate the erosion rate with the gas injection rate at a rate of penetration (ROP) of 1 m/h, along with corresponding conversion relationships for different ROPs. The predicted residual thickness of the V-shaped elbow showed a 6.8% relative error compared to field measurements. The proposed method can be programmed to enable real-time monitoring of the residual wall thickness and the remaining service life of the blooey line before leakage occurs, assisting field operators in determining optimal pipeline replacement schedules to ensure operational safety.
Open AccessErosion Wear Characteristics of V-Shaped Elbow in Blooey Line
In gas drilling operations, the blooey line is highly susceptible to erosion-induced leakage. This study focuses on the use of field-welded V-shaped elbows in blooey lines, establishing a numerical method for erosion prediction and validating its accuracy through experimental data. The numerical results reveal that, due to the inclined configuration of the V-shaped elbow, particles from the central inlet flow directly impact the outer wall of the outlet pipe opposite the inlet, and then rebound and strike the inner wall. Meanwhile, solid particles near the pipeline wall on both sides of the inclined plane collide with the outer wall and exit in a helical flow pattern along the outlet pipe. The maximum erosion rate (3.6 × 10−4 kg/(m2·s)) occurs at the intersection of these spiral particle flows. Based on erosion predictions under various operating conditions, an empirical formula was established to correlate the erosion rate with the gas injection rate at a rate of penetration (ROP) of 1 m/h, along with corresponding conversion relationships for different ROPs. The predicted residual thickness of the V-shaped elbow showed a 6.8% relative error compared to field measurements. The proposed method can be programmed to enable real-time monitoring of the residual wall thickness and the remaining service life of the blooey line before leakage occurs, assisting field operators in determining optimal pipeline replacement schedules to ensure operational safety.