Adirizal Nizar
Adirizal Nizar has a total of 6 co-authors. Here are the top co-authors by number of shared publications:
- Ahmad Fairuz
School of Business and Management, Bandung Institute of Technology, Indonesia
1 shared publication - Desy Anisya Farmaciawaty
Institut Teknologi Bandung, Indonesia
1 shared publication - Dong Eon Kim
SBM ITB Jakarta1, SBM ITB Bandung2, SBM ITB Jakarta3
1 shared publication - Jil Helga
Institut Teknologi Bandung
1 shared publication - Liane Okdinawati
Institut Teknologi Bandung
1 shared publication - Yuanita Handayati
School of Business and Management, Bandung Institute of Technology, Bandung, Indonesia
1 shared publication
Latest Publications
- Open Access
- 4 July 2025
- Published by Green Publisher in Eduvest - Journal of Universal Studies
- Vol. 5 (7) , 9080-9097
Strategic Safety Stock Level For High Import Dependence Manufacturing Supply Chain For Enhanced Force Majeure Preparedness
This study aims to determine the appropriate safety stock levels to enhance PT. Sukses Pharmapack’s preparedness for force majeure events and ensure operational continuity. By analyzing demand patterns over a five-year period, the research evaluates the effectiveness of safety stock in mitigating supply chain disruptions through scenario-based simulations. A mixed-method approach is applied, combining qualitative insights from key stakeholders with quantitative analysis of demand and lead time data. Statistical techniques such as mean, standard deviation, Z-score, and coefficient of variation are used to assess demand and lead time variability, while the Economic Order Quantity (EOQ) model with probability is employed to calculate optimal order quantities and safety stock levels. The findings indicate that a 30% increase in both demand and lead time results in the highest safety stock levels, improving service levels but raising inventory holding costs. Conversely, lower demand and shorter lead times reduce safety stock requirements but increase the risk of stockouts. The study is limited to a single product and supplier, which may restrict generalizability. Future research should explore multiple products and dynamic market conditions, implementing adaptive inventory policies with real-time demand monitoring.
- 4 July 2025
- Published by Green Publisher in Eduvest - Journal of Universal Studies
- Vol. 5 (7) , 9080-9097
Open AccessStrategic Safety Stock Level For High Import Dependence Manufacturing Supply Chain For Enhanced Force Majeure Preparedness
This study aims to determine the appropriate safety stock levels to enhance PT. Sukses Pharmapack’s preparedness for force majeure events and ensure operational continuity. By analyzing demand patterns over a five-year period, the research evaluates the effectiveness of safety stock in mitigating supply chain disruptions through scenario-based simulations. A mixed-method approach is applied, combining qualitative insights from key stakeholders with quantitative analysis of demand and lead time data. Statistical techniques such as mean, standard deviation, Z-score, and coefficient of variation are used to assess demand and lead time variability, while the Economic Order Quantity (EOQ) model with probability is employed to calculate optimal order quantities and safety stock levels. The findings indicate that a 30% increase in both demand and lead time results in the highest safety stock levels, improving service levels but raising inventory holding costs. Conversely, lower demand and shorter lead times reduce safety stock requirements but increase the risk of stockouts. The study is limited to a single product and supplier, which may restrict generalizability. Future research should explore multiple products and dynamic market conditions, implementing adaptive inventory policies with real-time demand monitoring.
- Open Access
- 1 September 2023
- Published by European Open Science in European Journal of Business and Management Research
- Vol. 8 (5) , 137-145
AHP Application to Select Logistical Location in Upstream Oil and Gas Operation: A Case Study
The objective of this research is to select the best logistics operation location for supporting multi-production field operations in an upstream oil and gas working area in Indonesia (Company XYZ). Company XYZ will have several upcoming production fields in the future, which are in different locations along the working area and far from the existing logistics operation location. Existing storage occupancy also becomes another consideration in preparation for the logistics operation plan to support multi-production fields. Some locations are examined as alternatives for upcoming logistics operation locations. The selection process will go through the Analytical Hierarchy Process (AHP) method as part of the Multi Criteria Decision Making (MCDM) tool. Three decision criteria used in this research refer to company XYZ’s strategic pillars, which are Financial, HSE (Health, Safety, and Environment), and Production. The sub-criteria are selected from previous research that is relevant to the study. Some experts are involved in providing professional judgment for the available options to result in the alternative location with the highest priority as a business solution.
- 1 September 2023
- Published by European Open Science in European Journal of Business and Management Research
- Vol. 8 (5) , 137-145
Open AccessAHP Application to Select Logistical Location in Upstream Oil and Gas Operation: A Case Study
The objective of this research is to select the best logistics operation location for supporting multi-production field operations in an upstream oil and gas working area in Indonesia (Company XYZ). Company XYZ will have several upcoming production fields in the future, which are in different locations along the working area and far from the existing logistics operation location. Existing storage occupancy also becomes another consideration in preparation for the logistics operation plan to support multi-production fields. Some locations are examined as alternatives for upcoming logistics operation locations. The selection process will go through the Analytical Hierarchy Process (AHP) method as part of the Multi Criteria Decision Making (MCDM) tool. Three decision criteria used in this research refer to company XYZ’s strategic pillars, which are Financial, HSE (Health, Safety, and Environment), and Production. The sub-criteria are selected from previous research that is relevant to the study. Some experts are involved in providing professional judgment for the available options to result in the alternative location with the highest priority as a business solution.
- Open Access
- 13 June 2023
- Published by Universitas Islam Lamongan in JPIM (Jurnal Penelitian Ilmu Manajemen)
- Vol. 8 (2) , 266-282
STRATEGY TO REDUCE COAL HAULING CYCLE TIME TO INCREASE THE PRODUCTIVITY IN PT ADARO INDONESIA
PT Adaro Indonesia (AI) is one of the largest thermal coal producers in Indonesia with production of around 40-50 million tons per year. AI’s mine business processes are managing mining production operations and selling to customers. To transport coal from production sites to sales points, AI travels by land and river. This paper will focus on transportation by land. Land coal transportation is carried out from the Stockpile/ROM (run-of-mine) to the Barito River Port in Kelanis Dedicated Coal Terminal using a coal trailer with capacity of 140-ton through dedicated hauling road along 86 km. one coal hauling cycle takes approximately five hours. It includes loading time in the stockpile, hauling time, weighing time on the weighing bridge and dumping time at Kelanis, then back to the Stockpile. In the period of January – April 2022, the average hauling cycle time is 5 hours 14 minutes which means exceeding the agreed time at the beginning of the year which was 5 hours. This has an impact on the non-achievement of sales target in the period that ultimately has an impact on not achieving the company’s revenue target. The focus on this research is to analyze the root cause of the non-achievement of cycle time targets on the dedicated hauling road and will identify the solutions to improve the conditions. The methods used are quantitative and qualitative to obtain data and information from various company stakeholders. The root cause of the problem is identified based on the data then validated based on the results of interviews and literature studies. The problems concluded from this study are transportation time and weighing time. The hauling time is affected by the average travel speed of the trailer, while the weighing time is affected by the change shift of trailer operator. Therefore, we recommended solution to increase the average travel speed of the trailers based on the root cause analysis is to increase road maintenance, while to reduce weighing time is to reschedule the number trailer operator shifts.
- 13 June 2023
- Published by Universitas Islam Lamongan in JPIM (Jurnal Penelitian Ilmu Manajemen)
- Vol. 8 (2) , 266-282
Open AccessSTRATEGY TO REDUCE COAL HAULING CYCLE TIME TO INCREASE THE PRODUCTIVITY IN PT ADARO INDONESIA
PT Adaro Indonesia (AI) is one of the largest thermal coal producers in Indonesia with production of around 40-50 million tons per year. AI’s mine business processes are managing mining production operations and selling to customers. To transport coal from production sites to sales points, AI travels by land and river. This paper will focus on transportation by land. Land coal transportation is carried out from the Stockpile/ROM (run-of-mine) to the Barito River Port in Kelanis Dedicated Coal Terminal using a coal trailer with capacity of 140-ton through dedicated hauling road along 86 km. one coal hauling cycle takes approximately five hours. It includes loading time in the stockpile, hauling time, weighing time on the weighing bridge and dumping time at Kelanis, then back to the Stockpile. In the period of January – April 2022, the average hauling cycle time is 5 hours 14 minutes which means exceeding the agreed time at the beginning of the year which was 5 hours. This has an impact on the non-achievement of sales target in the period that ultimately has an impact on not achieving the company’s revenue target. The focus on this research is to analyze the root cause of the non-achievement of cycle time targets on the dedicated hauling road and will identify the solutions to improve the conditions. The methods used are quantitative and qualitative to obtain data and information from various company stakeholders. The root cause of the problem is identified based on the data then validated based on the results of interviews and literature studies. The problems concluded from this study are transportation time and weighing time. The hauling time is affected by the average travel speed of the trailer, while the weighing time is affected by the change shift of trailer operator. Therefore, we recommended solution to increase the average travel speed of the trailers based on the root cause analysis is to increase road maintenance, while to reduce weighing time is to reschedule the number trailer operator shifts.