Phuong H. D. Nguyen
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Phuong H. D. Nguyen has a total of 10 co-authors. Here are the top co-authors by number of shared publications:
- Amr Ashmawi
Department of Civil and Environmental Engineering, South Dakota State University
3 shared publications - Mohamed Abdelsalam
Housing and Building National Research Center
2 shared publications Daniel Tran
Civil, Environmental and Architectural Engineering, University of Kansas
1 shared publication- Lisa Rebenitsch
South Dakota School of Mines and Technology
1 shared publication - Luke Nichols
Department of Civil and Environmental Engineering, South Dakota State University, 1451 Stadium Rd., Brookings, SD 57007, USA
1 shared publication Minsoo Baek
Department of Construction Management, Kennesaw State University
1 shared publication
Latest Publications
- Open Access
- 26 October 2026
- Published by MDPI AG in Big Data and Cognitive Computing
- Vol. 10 (11) , 361
Severity-Weighted Hazard Coverage Gaps in Wearable Stress Detection for Mining and Construction: A Simulation-Based Quantification Framework
Wearable systems promise real-time detection of workers’ acute physiological stress in underground mining and construction, yet whether existing detectors are trained on the stressors that injure and kill workers has not been examined. This simulation-based methodological study introduces a framework that (1) harmonizes U.S. Mine Safety and Health Administration and Occupational Safety and Health Administration incident narratives into a cross-industry hazard taxonomy and a severity-weighted acute stressor burden, (2) benchmarks five shallow classifiers on heart rate variability and electrodermal features under leave-one-subject-out and leave-one-dataset-out protocols, and (3) composes the two through a severity-weighted Hazard–Stressor Coverage Gap Index built on an explicitly documented assumed coverage matrix. The framework is demonstrated on literature-calibrated simulated inputs that reproduce the documented structure of 13,000 narratives and four public wearable datasets (WESAD, SWELL-KW, Nurse-Stress, and Exam-Stress). In this instantiation, the most lethal hazards were not the most frequent, detector performance degraded from within- to cross-dataset evaluation mainly in threshold-dependent metrics, and existing benchmark paradigms represented roughly one-fifth of the severity-weighted stressor burden (0.17 to 0.35 under ±0.20 perturbation of every coverage entry). Sudden physical threat and near-miss stress accounted for about two-thirds of the uncovered burden and ranked first under every perturbation tested. The reported numbers characterize the pipeline on simulated inputs. The released pipeline runs unchanged on the public files. The contribution is a reproducible, severity-weighted method for prioritizing where new physiological data collection would most improve worker safety monitoring.
- 26 October 2026
- Published by MDPI AG in Big Data and Cognitive Computing
- Vol. 10 (11) , 361
Open AccessSeverity-Weighted Hazard Coverage Gaps in Wearable Stress Detection for Mining and Construction: A Simulation-Based Quantification Framework
Wearable systems promise real-time detection of workers’ acute physiological stress in underground mining and construction, yet whether existing detectors are trained on the stressors that injure and kill workers has not been examined. This simulation-based methodological study introduces a framework that (1) harmonizes U.S. Mine Safety and Health Administration and Occupational Safety and Health Administration incident narratives into a cross-industry hazard taxonomy and a severity-weighted acute stressor burden, (2) benchmarks five shallow classifiers on heart rate variability and electrodermal features under leave-one-subject-out and leave-one-dataset-out protocols, and (3) composes the two through a severity-weighted Hazard–Stressor Coverage Gap Index built on an explicitly documented assumed coverage matrix. The framework is demonstrated on literature-calibrated simulated inputs that reproduce the documented structure of 13,000 narratives and four public wearable datasets (WESAD, SWELL-KW, Nurse-Stress, and Exam-Stress). In this instantiation, the most lethal hazards were not the most frequent, detector performance degraded from within- to cross-dataset evaluation mainly in threshold-dependent metrics, and existing benchmark paradigms represented roughly one-fifth of the severity-weighted stressor burden (0.17 to 0.35 under ±0.20 perturbation of every coverage entry). Sudden physical threat and near-miss stress accounted for about two-thirds of the uncovered burden and ranked first under every perturbation tested. The reported numbers characterize the pipeline on simulated inputs. The released pipeline runs unchanged on the public files. The contribution is a reproducible, severity-weighted method for prioritizing where new physiological data collection would most improve worker safety monitoring.
- Open Access
Benchmarking Large Language Models on Production BIM Workflows Using Agentic Automation
Large language models (LLMs) are increasingly proposed for Building Information Modeling (BIM) work, yet published evaluations test one or two models on a single task using simplified inputs, leaving practitioners without an evidence base for choosing between them. This paper’s contribution is a four-track benchmark of ten current models run inside one commercial Revit add-in suite on the production workloads of a working BIM department: requirement extraction from a live ISO 19650 BIM Execution Plan; rule extraction from an 88-page scanned Arabic building code; multimodal drawing review with live application programming interface (API) access, adjudicated and reconciled by two practitioners; and ten colloquial prompts executed in Revit, each carrying an adversarial probe. Scoring combines itemized rubrics, human verification, cross-model consensus and file forensics with telemetry from 218 logged calls. Three models form a leading group, Claude Opus 5 at 88.7 of 100, GPT 5.6 Sol at 86.2 and Claude Fable 5 at 84.7. Neither re-weighting the composite 20,000 times nor repeating the agentic track displaces that group or moves a composite by more than 1.8 points, but the separation inside it is smaller than that variation, so no ordering inside the group is claimed. On these prompts fuzzy name resolution, not code generation, accounts for 60 percent of agentic points lost, which argues for guardrails enforced in the tool layer rather than assumed from model behavior.
Open AccessBenchmarking Large Language Models on Production BIM Workflows Using Agentic Automation
Large language models (LLMs) are increasingly proposed for Building Information Modeling (BIM) work, yet published evaluations test one or two models on a single task using simplified inputs, leaving practitioners without an evidence base for choosing between them. This paper’s contribution is a four-track benchmark of ten current models run inside one commercial Revit add-in suite on the production workloads of a working BIM department: requirement extraction from a live ISO 19650 BIM Execution Plan; rule extraction from an 88-page scanned Arabic building code; multimodal drawing review with live application programming interface (API) access, adjudicated and reconciled by two practitioners; and ten colloquial prompts executed in Revit, each carrying an adversarial probe. Scoring combines itemized rubrics, human verification, cross-model consensus and file forensics with telemetry from 218 logged calls. Three models form a leading group, Claude Opus 5 at 88.7 of 100, GPT 5.6 Sol at 86.2 and Claude Fable 5 at 84.7. Neither re-weighting the composite 20,000 times nor repeating the agentic track displaces that group or moves a composite by more than 1.8 points, but the separation inside it is smaller than that variation, so no ordering inside the group is claimed. On these prompts fuzzy name resolution, not code generation, accounts for 60 percent of agentic points lost, which argues for guardrails enforced in the tool layer rather than assumed from model behavior.
- 31 July 2026
- Published by Taylor & Francis in International Journal of Construction Management
- p. 1-21
Comparative analysis of quality assurance acceptance methods in highway construction projects
Quality assurance (QA) and quality control (QC) are foundational to the safety, durability, and performance of highway infrastructure (Mostafavi et al. 2013; Philips-Ryder et al. 2013; Aichouni et ...
- 31 July 2026
- Published by Taylor & Francis in International Journal of Construction Management
- p. 1-21
Comparative analysis of quality assurance acceptance methods in highway construction projects
Quality assurance (QA) and quality control (QC) are foundational to the safety, durability, and performance of highway infrastructure (Mostafavi et al. 2013; Philips-Ryder et al. 2013; Aichouni et ...
- 25 February 2026
- Published by Taylor & Francis in Structure and Infrastructure Engineering
- p. 1-20
A systematic review of technologies and methodologies for automated bridge inspection
1. Bridges are critical components of infrastructure, serving as vital links in transportation networks and supporting economic growth (Neves et al., 2017). With over 617,000 bridges in the United ...
- 25 February 2026
- Published by Taylor & Francis in Structure and Infrastructure Engineering
- p. 1-20
A systematic review of technologies and methodologies for automated bridge inspection
1. Bridges are critical components of infrastructure, serving as vital links in transportation networks and supporting economic growth (Neves et al., 2017). With over 617,000 bridges in the United ...
- Top Cited PapersOpen Access
AI-Driven Automation of Construction Cost Estimation: Integrating BIM with Large Language Models
The construction industry faces challenges in estimating costs because the processes are time-consuming and involve a high likelihood of making errors. For instance, quantity take-offs are often inaccurate, and there is not a simple way to integrate data from Building Information Modeling (BIM) platforms and cost databases. This study introduces a framework that utilizes the Model Context Protocol (MCP) to ensure seamless integration between large language models (LLMs) and BIM models through Autodesk Revit in order to enable fully automated cost estimation workflows. The developed system combines an AI-powered MCP server with cost databases that are standard in the industry, such as the 2025 Craftsman National Building Cost Manual and the ZIP code-based location modifiers. This system enables LLMs to automatically obtain quantities from BIM models, match components to cost items, make regional changes, and make professional cost estimates. A case study of estimating the cost of an electrical system shows that the framework can reduce estimation time from 2.5–3.5 h (manual baseline) to 42.3 ± 3.7 s (n = 5 runs, warm start), representing a 98.6% efficiency gain, while being more accurate with respect to industry standards. The system processed 187 BIM elements in three component groups (receptacles, conduits, and panels). It automatically matched them to the right cost database items, used location-specific modifiers for ZIP code 01003, and made a full cost estimate of USD 13,945.81 with detailed breakdowns and a percent difference of %5.1 of the manual estimation. This research enhances automation in construction by developing a methodology for AI-BIM integration using standardized protocols, shows the practical application of AI in construction workflows, and provides empirical evidence of the advantages of automation in cost estimation processes. The results indicate that MCP-based AI integration presents a novel approach for construction automation, delivering improvements while applying professional standards of accuracy and availability.
Top Cited PapersOpen AccessAI-Driven Automation of Construction Cost Estimation: Integrating BIM with Large Language Models
The construction industry faces challenges in estimating costs because the processes are time-consuming and involve a high likelihood of making errors. For instance, quantity take-offs are often inaccurate, and there is not a simple way to integrate data from Building Information Modeling (BIM) platforms and cost databases. This study introduces a framework that utilizes the Model Context Protocol (MCP) to ensure seamless integration between large language models (LLMs) and BIM models through Autodesk Revit in order to enable fully automated cost estimation workflows. The developed system combines an AI-powered MCP server with cost databases that are standard in the industry, such as the 2025 Craftsman National Building Cost Manual and the ZIP code-based location modifiers. This system enables LLMs to automatically obtain quantities from BIM models, match components to cost items, make regional changes, and make professional cost estimates. A case study of estimating the cost of an electrical system shows that the framework can reduce estimation time from 2.5–3.5 h (manual baseline) to 42.3 ± 3.7 s (n = 5 runs, warm start), representing a 98.6% efficiency gain, while being more accurate with respect to industry standards. The system processed 187 BIM elements in three component groups (receptacles, conduits, and panels). It automatically matched them to the right cost database items, used location-specific modifiers for ZIP code 01003, and made a full cost estimate of USD 13,945.81 with detailed breakdowns and a percent difference of %5.1 of the manual estimation. This research enhances automation in construction by developing a methodology for AI-BIM integration using standardized protocols, shows the practical application of AI in construction workflows, and provides empirical evidence of the advantages of automation in cost estimation processes. The results indicate that MCP-based AI integration presents a novel approach for construction automation, delivering improvements while applying professional standards of accuracy and availability.
- Open Access
- 1 December 2025
- Published by Engineering, Project, and Production Management (EPPM) in Journal of Engineering, Project, and Production Management
- Vol. 15 (5) , 1
Advancing Construction Safety and Health Practices: Integrative Approaches from Cognitive and Technological Perspectives
- 1 December 2025
- Published by Engineering, Project, and Production Management (EPPM) in Journal of Engineering, Project, and Production Management
- Vol. 15 (5) , 1
Open AccessAdvancing Construction Safety and Health Practices: Integrative Approaches from Cognitive and Technological Perspectives
- Open Access
- 11 October 2025
- Published by MDPI AG in Applied Sciences
- Vol. 15 (20) , 10927
Digitalizing Bridge Inspection Processes Using Building Information Modeling (BIM) and Business Intelligence (BI)
State Departments of Transportation (DOTs) face challenges with traditional bridge inspections that are time-consuming, inconsistent, and paper-based. This study focused on an existing research gap regarding automated methods that streamline the bridge inspection process, prioritize maintenance effectively, and allocate resources efficiently. Thus, this paper introduces a digitalized bridge inspection framework by integrating Building Information Modeling (BIM) and Business Intelligence (BI) to enable near-real-time monitoring and digital documentation. This study adopts a Design Science Research (DSR) methodology, a recognized paradigm for developing and evaluating the innovative SmartBridge to address pressing bridge inspection problems. The method involved designing an Autodesk Revit-based plugin for data synchronization, element-specific comments, and interactive dashboards, demonstrated through an illustrative 3D bridge model. An illustrative example of the digitalized bridge inspection with the proposed framework is provided. The results show that SmartBridge streamlines data collection, reduces manual documentation, and enhances decision-making compared to conventional methods. This paper contributes to this body of knowledge by combining BIM and BI for digital visualization and predictive analytics in bridge inspections. The proposed framework has high potential for hybridizing digital technologies into bridge infrastructure engineering and management to assist transportation agencies in establishing a safer and efficient bridge inspection approach.
- 11 October 2025
- Published by MDPI AG in Applied Sciences
- Vol. 15 (20) , 10927
Open AccessDigitalizing Bridge Inspection Processes Using Building Information Modeling (BIM) and Business Intelligence (BI)
State Departments of Transportation (DOTs) face challenges with traditional bridge inspections that are time-consuming, inconsistent, and paper-based. This study focused on an existing research gap regarding automated methods that streamline the bridge inspection process, prioritize maintenance effectively, and allocate resources efficiently. Thus, this paper introduces a digitalized bridge inspection framework by integrating Building Information Modeling (BIM) and Business Intelligence (BI) to enable near-real-time monitoring and digital documentation. This study adopts a Design Science Research (DSR) methodology, a recognized paradigm for developing and evaluating the innovative SmartBridge to address pressing bridge inspection problems. The method involved designing an Autodesk Revit-based plugin for data synchronization, element-specific comments, and interactive dashboards, demonstrated through an illustrative 3D bridge model. An illustrative example of the digitalized bridge inspection with the proposed framework is provided. The results show that SmartBridge streamlines data collection, reduces manual documentation, and enhances decision-making compared to conventional methods. This paper contributes to this body of knowledge by combining BIM and BI for digital visualization and predictive analytics in bridge inspections. The proposed framework has high potential for hybridizing digital technologies into bridge infrastructure engineering and management to assist transportation agencies in establishing a safer and efficient bridge inspection approach.