WZWeijun Zhu

Weijun Zhu

*This is an algorithmically generated author record based on publicly available information.

Weijun Zhu has a total of 2 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Real-Time Risk Control Effects of Digital Compliance Dashboards: An Empirical Study Across Multiple Enterprises Using Process Mining, Anomaly Detection, and Interrupt Time Series

    by Weijun Zhu, Yao Yao, Jingwen Yang

    Based on 34 cross-border project logs (ERP/work orders/approval flows) from 2018 to 2023 at Aiku Communications and multiple multinational corporations, this study employs process mining (Heuristics/α-Miner) + compliance consistency metrics to identify process deviations; Combined LSTM-Autoencoder/Isolation Forest for transaction and process anomaly detection; evaluated immediate and sustained effects of the digital compliance dashboard deployment using Interrupted Time Series (ITS) and Double Difference analysis. Results: Compliance issue detection efficiency +42%, process transparency score +29%, operational risk incident rate −36%; Risk early warning advanced by 5.6 days on average; anomaly detection achieved AUC 0.87 and PR-AUC 0.62, with a net uplift of +12.7 pct within 90 days post-deployment.


  • Open Access

    Optimizing Financial Risk Control for Multinational Projects: A Joint Framework Based on CVaR-Robust Optimization and Panel Quantile Regression

    by Weijun Zhu, Yao Yao, Jingwen Yang

    Based on data from 45 multinational projects in the telecommunications and IT sectors between 2016 and 2022, this study proposes an integrated framework combining Conditional Value-at-Risk (CVaR) robust budget allocation and Panel Quantile Regression (PQR). Uncertainty is modeled using φ-divergence and box-type support sets to ensure distributional robustness. A Financial Risk Exposure Index (FREI) is constructed to capture the transmission of external shocks—such as exchange rate fluctuations and supplier defaults—to project cost deviations. The PQR model identifies the asymmetric impact of FREI across different project quantiles. Empirical findings reveal that a 10% reduction in FREI leads to a 15.8% drop in cost overruns and a 19.4% improvement in on-time delivery. Under a 95% confidence level, CVaR is reduced by 28%, and the budget payback period is shortened by 12.4%. Global sensitivity analysis using Sobol indices further highlights supplier performance volatility and exchange rate variance as the most influential risk drivers. This framework offers a structured, data-driven approach for financial risk mitigation in complex multinational projects and supports more informed resource allocation decisions.