KWKeke Wei

Keke Wei

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Keke Wei has a total of 7 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • An attention-augmented BiLSTM-LSTM framework with adaptive noise for turbofan engine remaining useful life prediction

    by Keke Wei, Qing Wang, Anda Li, Yang Zhang

    Unplanned failures of aircraft engines pose severe threats to flight safety and result in substantial economic losses, making accurate prognostic maintenance critical for the aviation industry. To address the challenges in degradation modeling and improve reliability, this study proposes a novel deep temporal modeling framework that features architectural decoupling and dynamic regularization for the remaining useful life (RUL) prediction of turbofan engines. Specifically, a bidirectional long short-term memory is employed as a streamlined encoder to strictly capture bidirectional temporal contexts, while a multi-head attention mechanism is dedicated to feature re-weighting, thereby enhancing the representation of critical degradation segments. Subsequently, an LSTM-based predictor is used to model degradation trends and estimate RUL. Furthermore, to bolster the model’s robustness against time-varying industrial noise, an adaptive Gaussian noise perturbation strategy is introduced. Experimental results on the C-MAPSS turbofan engine dataset demonstrate that the proposed method outperforms several representative baselines in terms of prediction accuracy; furthermore, extended validation on the XJTU-SY rolling bearing dataset confirms its superior generalization performance, validating its potential for effective engineering applications.


  • Performance‐Based Maintenance Service Contract With Business Interruption Insurance Considering the Supplier's Heterogeneous Risk Attitudes

    by Yang Zhang, Min Zhang, Keke Wei, Shuguang He, Zhen He, Shaohua Cui

    In modern industrial systems, the outsourcing of the maintenance service of mission‐critical equipment (MCE) is becoming common practice for increasing the system flexibility and decreasing operating costs. For the MCE operator and the service provider, a performance‐based contract (PBC) is critical to the cooperation between these two parties. In the PBC of maintenance service, equipment availability is often used as the performance indicator. Considering the potential loss due to the MCE downtime, business interruption (BI) insurance is often purchased by the practitioners for mitigating the operating risks. This paper designs a PBC by taking the supplier's risk attitudes and BI insurance into account. Specifically, this paper constructs a PBC design model using principal‐agent analysis and explores the role of BI insurance in contract parameters (the fixed payment and the penalty/reward rate). Results show that greater (smaller) fixed payments and penalties in PBCs are more incentive for suppliers as their risk‐averse (risk‐seeking) degree rises. When BI insurance is purchased, the operator would be more suitable to use a contract with smaller penalties (for risk‐averse, risk‐neutral, risk‐seeking suppliers) compared to a PBC without BI insurance. Finally, a numerical example illustrates our proposed PBC model.