    A Study on Rational Pre-Tensioning Schemes for 60 m Prefabricated Railway Box Girders Considering Steel Formwork Constraints

    by Tao Zhang, Weitao Ye, Wei Yang, Zuqing Zhao, Lei Wang, Fei Wang, Yuliang Cai

    Early-age cracking is a common issue in the prefabrication of large-scale box girders, and the application of pre-tensioning techniques to introduce pre-compressive stress is an effective measure to mitigate such cracking. To determine an optimal pre-tensioning scheme for the 60 m large-scale box girder used in the Ningbo–Xiangshan intercity railway, friction coefficient tests and field stress monitoring were conducted. A numerical model simulating the pre-tensioning process of the box girder, accounting for the constraint of the steel formwork, was developed using Abaqus 2021. Based on the validated finite element model, a parametric study was performed to investigate the effects of friction coefficient, internal formwork roof, and prestressing tendon arrangement on the pre-compressive stress. The results indicate that the bond force between cast-in-place concrete and steel formwork is approximately 2.1 times the sliding friction force. As the friction coefficient increases, the pre-compressive stress in the box girder exhibits a notable decreasing trend. For the critical midspan section S40, the inclusion of frictional effects results in a more uniform distribution of pre-compressive stress. Compared to the case without the internal formwork roof, its inclusion leads to a 9.2% to 10.4% reduction in pre-compressive stress at section S40. To mitigate prestress losses transmitted from the ends to the midspan section, it is recommended that the internal formwork be completely removed prior to prestressing tensioning. The pre-compressive stress in the box girder varies considerably with different prestressing combinations. The comparative analysis of different prestressing combinations reveals substantial variations in pre-compressive stress distribution. After evaluating multiple schemes, the optimal pre-tensioning sequence for the 60-m railway box girder is determined as follows: sequentially tensioning tendon groups F1-2, F1-4, F1-5, F1-6, and B2-3, with an anchorage stress controlled at 558 MPa. This scheme ensures that all critical sections of the box girder remain in a pre-compressive state. In particular, the pre-compressive stress at the key midspan section S40 ranges from 1.12 to 1.26 MPa, achieving the desired effect and effectively suppressing early-age cracking in the large-scale box girder concrete.


  • Open Access

    Winter Construction of 60 m Precast Railway Box Girders: An Investigation into Efficient Thermal Insulation Strategies

    by Wei Yang, Tao Zhang, Zuqing Zhao, Xuebin Feng, Lei Wang, Fei Wang, Yuliang Cai

    Large-scale concrete box girders are prone to early-age cracking because of the hydration reaction. To expedite the winter construction of large-scale precast box girders while mitigating the risk of thermal cracking induced by hydration heat, this study performs in situ temperature field monitoring and investigates the strength development of concrete under various curing conditions. The temperature field is numerically simulated using finite element analysis software ABAQUS and the secondary development of the subroutine. A parametric analysis is conducted to evaluate the influence of insulation rooms, insulation temperatures, and concrete placing temperatures. The results indicate that thermal insulation during winter construction effectively accelerates the development of concrete strength and enhances production efficiency. Compared to natural curing conditions, elevated insulation temperatures increase the temperature difference between the web core and inner surface, while reducing the early-stage temperature differences between the web core and outer surface. To minimize excessive temperature differences in large-scale box girders caused by hydration heat and thermal insulation during winter construction, it is recommended to maintain the concrete placing temperature below 19 °C and the insulation temperature within the range of 15–20 °C.


  • Open Access

    Early-Age Hydration Heat in Railway 60-Meter Precast Box Girders: Experimental Study and Experimental Simulation

    by Xu Feng, Yuliang Cai, Fei Wang, Zhongda Lv, Wei Yang, Lei Wang

    Large precast concrete box girders are susceptible to cracking due to excessive temperature differentials induced by early-age hydration heat, compromising structural reliability and durability. Investigating the early-age hydration heat in large precast box girders and proposing corresponding temperature control measures based on influencing factor analysis is therefore essential. The present research employs field testing and numerical simulation of a 60 m precast railway box girder to develop a UMATHT subroutine and establish a refined finite element model incorporating temperature-dependent material properties and hydration degree. Results demonstrate that the early-age temperature field exhibits an initial rise followed by a decline. Pouring temperature exhibits a positive correlation with both peak temperature and maximum temperature differential; a 5 °C increase in pouring temperature elevates the temperature differential by nearly 1.8 °C. Cement content significantly affects peak temperature, with an average increase of approximately 5.4 °C per additional 50 kg/m3 of cement. Ambient wind speed exerts a greater influence on temperature evolution during the cooling phase than the heating phase. Increased ambient wind speed reduces the peak sectional temperature while concurrently increasing the surface temperature gradient on the windward side of the girder.