YJYihua Jiang

Yihua Jiang

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Yihua Jiang has a total of 6 co-authors. Here are the top co-authors by number of shared publications:

  • Fang Yang

    College of Engineering, Huazhong Agricultural University, Wuhan 430070, China

    2 shared publications
  • Min Zhou

    College of Engineering, Huazhong Agricultural University, Wuhan 430070, China

    1 shared publication
  • Shanjun Li

    College of Engineering, Huazhong Agricultural University, Wuhan 430070, China; 2. China Agriculture (Citrus) Research System,Wuhan 430070, China; 3. National R&D Center for Citrus Preservation, Wuhan 430070, China; 4. Citrus Mechanization Research Base, Ministry of Agriculture and Rural Affairs, Wuhan 430070, China; 5. Key Laboratory of Agricultural Equipment in Mid-lower Yangtze River, Ministry of Agriculture and Rural Affairs, Wuhan 430070, China

    1 shared publication
  • Zhaoji Xu

    College of Engineering, Huazhong Agricultural University, Wuhan 430070, China

    1 shared publication
  • Zhiqiang He

    College of Engineering, Huazhong Agricultural University, Wuhan 430070, China

    1 shared publication
  • Zihao Zhang

    College of Engineering, Huazhong Agricultural University, Wuhan 430070, China; 2. China Agriculture (Citrus) Research System,Wuhan 430070, China

    1 shared publication

Latest Publications

  • Open Access

    Dynamic Task Scheduling Optimisation Method for Hilly Orchard Rail Transport Systems

    by Yihua Jiang, Min Zhou, Zhiqiang He, Zhaoji Xu, Fang Yang

    Efficient scheduling of automated rail transportation in hilly orchards is critical for maintaining fruit freshness and ensuring timely market delivery. This study develops a dynamic scheduling method for multi-transporter orchard rail systems through mathematical modeling, reinforcement learning algorithms, and field validation. We formulated a comprehensive scheduling model and designed four distinct frameworks to address randomly arriving tasks. In the optimal framework (Framework 3, which was chosen due to its hybrid strategy combining periodic global planning and local task point adjustment), we compared six rule-based heuristic algorithms against three reinforcement learning approaches: centralized SAC, decentralized MARL-DQN, and conventional DQN. Additionally, two emergency response strategies were developed and evaluated. Simulation experiments demonstrated that Framework 3 maintained high load factors while reducing task completion times. The centralized SAC algorithm outperformed other methods, achieving 1533.71 ± 50.09 reward points compared to 863.67 ± 30.54 for rule-based heuristics, a 77.6% improvement. For emergency tasks, Strategy 2 achieved faster response times with minimal disruption to routine operations. Field trials on a 153 m physical track with four autonomous transporters validated the DQN algorithm, confirming good sim-to-real consistency. This research provides a practical solution for dynamic scheduling challenges in hilly orchards, offering measurable efficiency improvements over traditional methods.

  • Open Access

    Development and tests of sliding contact line-powered track transporter

    by Yihua Jiang, Fang Yang, Zihao Zhang, Shanjun Li

    Development and tests of sliding contact line-powered track transporter