Chuanyong Wei
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Chuanyong Wei has a total of 9 co-authors. Here are the top co-authors by number of shared publications:
- Shichong Yuan
School of Urban Geology and Engineering, Hebei GEO University, Shijiazhuang 052161, China
2 shared publications - Dajin Liu
Technology Innovation Center for Groundwater Disaster Prevention and Control Engineering for Metal Mines, Ministry of Natural Resources, North China Engineering Investigation Institute Co., Ltd., Shijiazhuang 050021, China
1 shared publication - Dengkui Zhang
School of Resources and Geosciences, China University of Mining and Technology, Xuzhou 221116, China
1 shared publication - Guilei Han
Technology Innovation Center for Groundwater Disaster Prevention and Control Engineering for Metal Mines, Ministry of Natural Resources, North China Engineering Investigation Institute Co., Ltd., Shijiazhuang 050021, China
1 shared publication - Jinwei Li
Geological Exploration Research Institute of Guizhou Coalfield Geological Bureau, Guiyang 550081, China
1 shared publication - Xiaofeng Xue
Technology Innovation Center for Groundwater Disaster Prevention and Control Engineering for Metal Mines, Ministry of Natural Resources, North China Engineering Investigation Institute Co., Ltd., Shijiazhuang 050021, China
1 shared publication
Latest Publications
- Open Access
Numerical Simulation of Grout Diffusion and Overlap Characteristics in Horizontal Curtain Grouting for Underground Mines Within 3D Discrete Fracture Networks
Deep metal mines face increasing risks of water and sand inrush under complex fracture network conditions, where the unclear mechanism of slurry diffusion limits the reliability of horizontal curtain grouting. Taking the Cuihongshan iron–polymetallic mine as a case study, this paper establishes a stochastic three-dimensional discrete fracture network model and adopts an orthogonal experimental design to systematically investigate the effects of key engineering parameters on grout diffusion behavior. The results reveal that grouting pressure acts as the dominant controlling factor, significantly expanding the diffusion range and promoting the formation of continuous high-fill zones within the fracture network. Conversely, slurry viscosity exhibits a negative correlation with diffusion performance, leading to reduced inter-borehole connectivity as viscosity increases. Compared with conventional macro-indicators, the inter-borehole overlap rate provides a more precise quantitative measure of curtain continuity. The study demonstrates that achieving a sufficiently high overlap rate is critical for transitioning from discontinuous filling to a reliable impermeable curtain. These findings offer a theoretical basis for optimizing grouting parameters and evaluating sealing effectiveness in deep mine construction.
Open AccessNumerical Simulation of Grout Diffusion and Overlap Characteristics in Horizontal Curtain Grouting for Underground Mines Within 3D Discrete Fracture Networks
Deep metal mines face increasing risks of water and sand inrush under complex fracture network conditions, where the unclear mechanism of slurry diffusion limits the reliability of horizontal curtain grouting. Taking the Cuihongshan iron–polymetallic mine as a case study, this paper establishes a stochastic three-dimensional discrete fracture network model and adopts an orthogonal experimental design to systematically investigate the effects of key engineering parameters on grout diffusion behavior. The results reveal that grouting pressure acts as the dominant controlling factor, significantly expanding the diffusion range and promoting the formation of continuous high-fill zones within the fracture network. Conversely, slurry viscosity exhibits a negative correlation with diffusion performance, leading to reduced inter-borehole connectivity as viscosity increases. Compared with conventional macro-indicators, the inter-borehole overlap rate provides a more precise quantitative measure of curtain continuity. The study demonstrates that achieving a sufficiently high overlap rate is critical for transitioning from discontinuous filling to a reliable impermeable curtain. These findings offer a theoretical basis for optimizing grouting parameters and evaluating sealing effectiveness in deep mine construction.
- Open Access
- 20 November 2025
- Published by MDPI AG in Applied Sciences
- Vol. 15 (22) , 12318
Numerical Simulation of Clay Layer Permeability Failure Under Loose Strata: Effects of Mining-Induced Fracture Width
Based on the problem of water and sand inrush caused by the infiltration and failure of the clay layer at the bottom of the loose layer in shallow coal seam mining in eastern China, this study adopts the Particle Flow Code numerical simulation method to conduct multi-physics field coupling analysis. Based on the geological conditions of Taiping Coal Mine in Shandong Province, a two-dimensional water sand clay coupling model was constructed to systematically simulate the entire process of permeability failure of clay layers under different mining crack widths (5–20 mm). The permeability failure mechanism was revealed through porosity distribution, particle contact number, and contact force evolution laws. The numerical simulation results show that with the increase in crack width, the speed of contact reduction is faster, the speed of water and inrush is faster, and the time is shorter. The process of infiltration failure can be divided into two stages: the first stage is the clay infiltration deformation stage, and the second stage is the water inrush and sand collapse stage. In addition, the larger the width of the crack, the greater the contact force, and the shorter the time of infiltration failure and water and sand bursting experienced. The quantitative relationship between the width of mining induced cracks and permeability failure was revealed, and a critical discrimination index for permeability failure in clay layers was established, providing theoretical support for optimizing safe mining parameters and preventing water and sand inrush disasters in porous aquifers.
- 20 November 2025
- Published by MDPI AG in Applied Sciences
- Vol. 15 (22) , 12318
Open AccessNumerical Simulation of Clay Layer Permeability Failure Under Loose Strata: Effects of Mining-Induced Fracture Width
Based on the problem of water and sand inrush caused by the infiltration and failure of the clay layer at the bottom of the loose layer in shallow coal seam mining in eastern China, this study adopts the Particle Flow Code numerical simulation method to conduct multi-physics field coupling analysis. Based on the geological conditions of Taiping Coal Mine in Shandong Province, a two-dimensional water sand clay coupling model was constructed to systematically simulate the entire process of permeability failure of clay layers under different mining crack widths (5–20 mm). The permeability failure mechanism was revealed through porosity distribution, particle contact number, and contact force evolution laws. The numerical simulation results show that with the increase in crack width, the speed of contact reduction is faster, the speed of water and inrush is faster, and the time is shorter. The process of infiltration failure can be divided into two stages: the first stage is the clay infiltration deformation stage, and the second stage is the water inrush and sand collapse stage. In addition, the larger the width of the crack, the greater the contact force, and the shorter the time of infiltration failure and water and sand bursting experienced. The quantitative relationship between the width of mining induced cracks and permeability failure was revealed, and a critical discrimination index for permeability failure in clay layers was established, providing theoretical support for optimizing safe mining parameters and preventing water and sand inrush disasters in porous aquifers.