Frédéric Le Pimpec
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Frédéric Le Pimpec has a total of 58 co-authors. Here are the top co-authors by number of shared publications:
- Alex Rosset
Canadian Light Source Inc., 44 Innovation Blvd., Saskatoon, SK S7N 2V3, Canada
2 shared publications - Alexander Nikolaichuk
Canadian Light Source Inc., 44 Innovation Blvd., Saskatoon, SK S7N 2V3, Canada
2 shared publications - Andrew McCormick
Canadian Light Source Inc., 44 Innovation Blvd., Saskatoon, SK S7N 2V3, Canada
2 shared publications - Anja Kraemer
Research Instruments GmbH, Friedrich-Ebert-Straße 75, 51429 Bergisch Gladbach, Germany
2 shared publications - Anne Vanselow
Research Instruments GmbH, Friedrich-Ebert-Straße 75, 51429 Bergisch Gladbach, Germany
2 shared publications - Benjamen Smith
Canadian Light Source Inc., 44 Innovation Blvd., Saskatoon, SK S7N 2V3, Canada
2 shared publications
Latest Publications
- Open Access
- 16 March 2026
- Published by MDPI AG in Instruments
- Vol. 10 (1) , 17
Return of Experience in the Commissioning of the New CLS LINAC Injector
After approximately 60 years of service, the 2856 MHz LINAC injector, of the Canadian Light Source (CLS), has been retired to make space for a new 3000.24 MHz LINAC injector, the frequency of which is a multiple of the 500.04 MHz CESR-B-type superconductive radio frequency cavity used in the CLS storage ring. The new CLS LINAC injector has been designed and built by RI Research Instruments GmbH. The design is based on their robust S-band RF traveling-wave accelerating structures technology already serving other laboratories in the USA, Australia, Taiwan, Switzerland, and Sweden. In order to reduce cost and optimize space, the CLS has replaced its six accelerating RF structures, each 3.05 m long, delivering a 250 MeV electron beam with three 5.26 m long accelerating structures that will deliver the same beam energy. In order to do so, one RF structure is powered by one klystron modulator, and the last two RF structures receive their RF power from a second klystron modulator that passes through a SLED system. The SLED system multiplies the peak power by a factor of 5 to 6 and is then equally split to power each structure. We are reporting on the issues encountered during the commissioning of this new injector, on how we have tackled them and where the injector, compared to its technical specification, is standing today.
- 16 March 2026
- Published by MDPI AG in Instruments
- Vol. 10 (1) , 17
Open AccessReturn of Experience in the Commissioning of the New CLS LINAC Injector
After approximately 60 years of service, the 2856 MHz LINAC injector, of the Canadian Light Source (CLS), has been retired to make space for a new 3000.24 MHz LINAC injector, the frequency of which is a multiple of the 500.04 MHz CESR-B-type superconductive radio frequency cavity used in the CLS storage ring. The new CLS LINAC injector has been designed and built by RI Research Instruments GmbH. The design is based on their robust S-band RF traveling-wave accelerating structures technology already serving other laboratories in the USA, Australia, Taiwan, Switzerland, and Sweden. In order to reduce cost and optimize space, the CLS has replaced its six accelerating RF structures, each 3.05 m long, delivering a 250 MeV electron beam with three 5.26 m long accelerating structures that will deliver the same beam energy. In order to do so, one RF structure is powered by one klystron modulator, and the last two RF structures receive their RF power from a second klystron modulator that passes through a SLED system. The SLED system multiplies the peak power by a factor of 5 to 6 and is then equally split to power each structure. We are reporting on the issues encountered during the commissioning of this new injector, on how we have tackled them and where the injector, compared to its technical specification, is standing today.
- Open Access
- 7 January 2026
- Published by MDPI AG in Preprints.org
Return of Experience in the Commissioning of the New CLS LINAC Injector
After approximately 60 years of service the 2856 MHz LINAC injector, of the Canadian Light Source (CLS), has been retired to make space for a new 3000.24 MHz LINAC injector, the frequency of which is a multiple of the 500.04 MHz CESR-B type superconductive radio frequency cavity used in the CLS storage ring. The new CLS LINAC injector has been designed and built by RI Research Instruments GmbH. The design is based on their robust S-band RF traveling wave accelerating structures technology, already serving other laboratories in the USA, Australia, Taiwan, Switzerland, and Sweden. In order to reduce cost and optimize space, the CLS has replaced its six accelerating RF structures, each 3.05 meters long, delivering 250 MeV electron beam with three 5.26 m long accelerating structures that will deliver the same beam energy. In order to do so, one RF structure is powered by one modulator-klystron and the last two RF structures receive their RF power from a second modulator-klystron that passes through a SLED system. The SLED system multiplies the peak power by a factor 5 to 6 and is then equally split to power each structure. We are reporting on the issues encountered during the commissioning of this new injector, on how we have tackled them and where the injector, compared to its technical specification, is standing today.
- 7 January 2026
- Published by MDPI AG in Preprints.org
Open AccessReturn of Experience in the Commissioning of the New CLS LINAC Injector
After approximately 60 years of service the 2856 MHz LINAC injector, of the Canadian Light Source (CLS), has been retired to make space for a new 3000.24 MHz LINAC injector, the frequency of which is a multiple of the 500.04 MHz CESR-B type superconductive radio frequency cavity used in the CLS storage ring. The new CLS LINAC injector has been designed and built by RI Research Instruments GmbH. The design is based on their robust S-band RF traveling wave accelerating structures technology, already serving other laboratories in the USA, Australia, Taiwan, Switzerland, and Sweden. In order to reduce cost and optimize space, the CLS has replaced its six accelerating RF structures, each 3.05 meters long, delivering 250 MeV electron beam with three 5.26 m long accelerating structures that will deliver the same beam energy. In order to do so, one RF structure is powered by one modulator-klystron and the last two RF structures receive their RF power from a second modulator-klystron that passes through a SLED system. The SLED system multiplies the peak power by a factor 5 to 6 and is then equally split to power each structure. We are reporting on the issues encountered during the commissioning of this new injector, on how we have tackled them and where the injector, compared to its technical specification, is standing today.
- Open Access
A reflexion on the potential evolution of the CLS machine complex : A "Gedanken" experiment
In the next 5 to 10 years, new fourth generation light sources will be coming online either from upgrades or as brand new facilities. The question regarding the competitiveness and the usability of a third generation light source is certainly in the mind of the scientific personnel, which includes both the beamline and the accelerator staff of any third Gen Research Infrastructures. At the Canadian Light Source (CLS), Accelerator Operation and Development (AOD) staff are responsible for the daily operation of the machines, their upgrades which extend to long term development and shall also raise awareness on their possibilities. The boundaries of this mind experiment are 1) we must use CLS infrastructure, 2) identify the existence of the knowledge to realize an idea, 3) the realization, with whom, how, with which funds and under which administrative supervision is out of bounds.
Open AccessA reflexion on the potential evolution of the CLS machine complex : A "Gedanken" experiment
In the next 5 to 10 years, new fourth generation light sources will be coming online either from upgrades or as brand new facilities. The question regarding the competitiveness and the usability of a third generation light source is certainly in the mind of the scientific personnel, which includes both the beamline and the accelerator staff of any third Gen Research Infrastructures. At the Canadian Light Source (CLS), Accelerator Operation and Development (AOD) staff are responsible for the daily operation of the machines, their upgrades which extend to long term development and shall also raise awareness on their possibilities. The boundaries of this mind experiment are 1) we must use CLS infrastructure, 2) identify the existence of the knowledge to realize an idea, 3) the realization, with whom, how, with which funds and under which administrative supervision is out of bounds.