Sasitharan Nagapan
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Sasitharan Nagapan has a total of 21 co-authors. Here are the top co-authors by number of shared publications:
Abd. Halid Abdullah
Department of Architecture and Engineering Design, Faculty of Civil & Environmental Engineering, Universiti Tun Hussein Onn Malaysia, 86400 Parit Raja, Batu Pahat, Johor, Malaysia
1 shared publicationAbdul Halid Abdullah
Assistant Professor, Fac. Civil and Environmental Engineering, Universiti Tun Hussein Onn Malaysia, Malaysia
1 shared publication- Adel Al-Gheethi
Global Centre for Environmental Remediation (GCER), University of Newcastle and CRC for Contamination Assessment and Remediation of the Environment (CRC CARE), Newcastle, Australia
1 shared publication Amir Hashim Mohd
Micro-pollutant Research Centre (MPRC), Department of Water and Environmental Engineering, Faculty of Civil and Environmental Engineering, Universiti Tun Hussein Onn Malaysia (UTHM), 86400 Parit Raja, Batu Pahat, Johor, Malaysia
1 shared publicationBala Jeremiah David
Department of Microbiology, School of Life Sciences, Federal University of Technology, P.M.B 65, Minna, Niger State, Nigeria
1 shared publication- Basil David Daniel
Smart Driving Research Center, Faculty of Civil and Environmental Engineering, Universiti Tun Hussein Onn Malaysia, 86400 Batu Pahat, Johor, Malaysia
1 shared publication
Latest Publications
- 6 January 2026
- Published by World Scientific Pub Co Pte Ltd in Journal of Uncertain Systems
- Vol. 19 (03)
Solution of Bipolar Fuzzy Nonlinear Equations by Fuzzy Adomian Decomposition Method and Fuzzy Newton–Raphson Method
Fuzzy nonlinear equations are used to model real-world problems. Due to the nonlinearity, sometimes obtaining a fuzzy solution is challenging. This paper deals with two methods for solving such equations, the first is the fuzzy Newton–Raphson method (FNRM) and the other is the fuzzy Adomian decomposition method (FADM). Both methods are proposed and demonstrated. We observe that the FADM is better than the FNRM. FADM gives a fuzzy solution also, at the core the fuzzy solution matches with the crisp one. The FNRM initially gives a fuzzy solution, but as iterations increase, the solution does not remain fuzzy, and even the fuzzy solution does not match with the crisp one. Last, one numerical illustration is solved by both methods.
- 6 January 2026
- Published by World Scientific Pub Co Pte Ltd in Journal of Uncertain Systems
- Vol. 19 (03)
Solution of Bipolar Fuzzy Nonlinear Equations by Fuzzy Adomian Decomposition Method and Fuzzy Newton–Raphson Method
Fuzzy nonlinear equations are used to model real-world problems. Due to the nonlinearity, sometimes obtaining a fuzzy solution is challenging. This paper deals with two methods for solving such equations, the first is the fuzzy Newton–Raphson method (FNRM) and the other is the fuzzy Adomian decomposition method (FADM). Both methods are proposed and demonstrated. We observe that the FADM is better than the FNRM. FADM gives a fuzzy solution also, at the core the fuzzy solution matches with the crisp one. The FNRM initially gives a fuzzy solution, but as iterations increase, the solution does not remain fuzzy, and even the fuzzy solution does not match with the crisp one. Last, one numerical illustration is solved by both methods.
- Open Access
- 11 March 2020
- Published by Maya Global Education Society in Humanities & Social Sciences Reviews
- Vol. 8 (2) , 405-412
THE MODERATING EFFECT OF PROJECT RISK RESPONSE-RELATED MEASURES ON THE RELATIONSHIP BETWEEN PROJECT-RELATED DELAY FACTORS AND CONSTRUCTION PROJECT PERFORMANCE
Purpose of the study: This conceptual paper is based on a review of delay issues, risk response management and project performance in the Malaysian construction industry. The study also involved the evaluation of latent relationships among project-related delay factors, project risk response-related measures and project performance in terms of time and cost. Methodology: Literature in light of recent studies was reviewed and a thematic review approach was also conducted. The themes summarized delay issues, risk response measures, and project performance. Subsequently, the synthesized literature review aided the development of the conceptual framework for the delay mitigation model. Main Findings: The authors presented a model where project-related delay factors have a negative effect on project performance, project risk response-related measures have a positive effect on project performance and project risk response-related measures positively moderate the relationship between project-related delay factors and project performance. Applications of this study: This study will enable the construction practitioners to understand better ways to mitigate delay issues in the construction industry. Novelty/Originality of this study: This work offers a conceptual perspective on the enhancement of project performance in terms of cost and time by addressing the issues of project delay factors managed using project risk response-related measures.
- 11 March 2020
- Published by Maya Global Education Society in Humanities & Social Sciences Reviews
- Vol. 8 (2) , 405-412
Open AccessTHE MODERATING EFFECT OF PROJECT RISK RESPONSE-RELATED MEASURES ON THE RELATIONSHIP BETWEEN PROJECT-RELATED DELAY FACTORS AND CONSTRUCTION PROJECT PERFORMANCE
Purpose of the study: This conceptual paper is based on a review of delay issues, risk response management and project performance in the Malaysian construction industry. The study also involved the evaluation of latent relationships among project-related delay factors, project risk response-related measures and project performance in terms of time and cost. Methodology: Literature in light of recent studies was reviewed and a thematic review approach was also conducted. The themes summarized delay issues, risk response measures, and project performance. Subsequently, the synthesized literature review aided the development of the conceptual framework for the delay mitigation model. Main Findings: The authors presented a model where project-related delay factors have a negative effect on project performance, project risk response-related measures have a positive effect on project performance and project risk response-related measures positively moderate the relationship between project-related delay factors and project performance. Applications of this study: This study will enable the construction practitioners to understand better ways to mitigate delay issues in the construction industry. Novelty/Originality of this study: This work offers a conceptual perspective on the enhancement of project performance in terms of cost and time by addressing the issues of project delay factors managed using project risk response-related measures.
- Open Access
- 1 January 2020
- Published by IOP Publishing in IOP Conference Series: Materials Science and Engineering
- Vol. 713 (1) , 012049
Traffic Noise Assessment among Residential Environment in Batu Pahat, Johore, Malaysia
Noise pollution arises as a severe problem to the community and ground transportation has highly impacted noise environment of the neighbourhood. In the present study, six stations were selected from three different locations in order to assess the traffic noise impact among residential area along Jalan Kluang, Batu Pahat. The objectives of this study focused on two main stages: (1) determination of noise indices; and (2) assessment of traffic noise impact. The noise indices such as equivalent continuous noise level (LAeq), noise level exceeded 10% (L10), 90% (L90) and the maximum noise level (LAFmax) of peak hours measurement time were determined using sound level meter (SLM) at all six stations. Besides, traffic noise index (TNI) and noise pollution level (LNP) were calculated based on the measured noise indices to expose the traffic noise impact. Overall, the result of the present study showed that residential area faces traffic noise disturbance partially whereby 50% of the stations exceeded the DOE standard which was 55dBA. Nevertheless, the residents living nearby Jalan Kluang are commonly facing traffic noise nuisance, but stations located further inside residential areas tend to have more residential background noises apart from traffic influence.
- 1 January 2020
- Published by IOP Publishing in IOP Conference Series: Materials Science and Engineering
- Vol. 713 (1) , 012049
Open AccessTraffic Noise Assessment among Residential Environment in Batu Pahat, Johore, Malaysia
Noise pollution arises as a severe problem to the community and ground transportation has highly impacted noise environment of the neighbourhood. In the present study, six stations were selected from three different locations in order to assess the traffic noise impact among residential area along Jalan Kluang, Batu Pahat. The objectives of this study focused on two main stages: (1) determination of noise indices; and (2) assessment of traffic noise impact. The noise indices such as equivalent continuous noise level (LAeq), noise level exceeded 10% (L10), 90% (L90) and the maximum noise level (LAFmax) of peak hours measurement time were determined using sound level meter (SLM) at all six stations. Besides, traffic noise index (TNI) and noise pollution level (LNP) were calculated based on the measured noise indices to expose the traffic noise impact. Overall, the result of the present study showed that residential area faces traffic noise disturbance partially whereby 50% of the stations exceeded the DOE standard which was 55dBA. Nevertheless, the residents living nearby Jalan Kluang are commonly facing traffic noise nuisance, but stations located further inside residential areas tend to have more residential background noises apart from traffic influence.
- Open Access
- 6 July 2018
- Published by IWA Publishing in Journal of Water and Health
- Vol. 16 (5) , 667-680
A review of potential factors contributing to epidemic cholera in Yemen
The menace of cholera epidemic occurrence in Yemen was reported in early 2017. Recent reports revealed that an estimated 500,000 people are infected with cholera whereas 2,000 deaths have been reported in Yemen. Cholera is transmitted through contaminated water and food. Yemen is the least developed country among the Middle East countries in wastewater and solid waste management. The population of Yemen is about 24.5 million and they generate about 70–100 million m3 of sewage. An estimated 7% of the PE has sewerage systems. It has been revealed that 31.2 million m3 of untreated sewage is used for irrigation purposes especially for vegetables and Khat trees. In addition, more than 70% of the population in Yemen has no potable water. They depend on water wells as a water source which are located close to sewage disposal sites. The present review focuses on the current status of water, wastewater as well as solid waste management in Yemen and their roles in the outbreak of cholera. Future prospects for waste management have been proposed.
- 6 July 2018
- Published by IWA Publishing in Journal of Water and Health
- Vol. 16 (5) , 667-680
Open AccessA review of potential factors contributing to epidemic cholera in Yemen
The menace of cholera epidemic occurrence in Yemen was reported in early 2017. Recent reports revealed that an estimated 500,000 people are infected with cholera whereas 2,000 deaths have been reported in Yemen. Cholera is transmitted through contaminated water and food. Yemen is the least developed country among the Middle East countries in wastewater and solid waste management. The population of Yemen is about 24.5 million and they generate about 70–100 million m3 of sewage. An estimated 7% of the PE has sewerage systems. It has been revealed that 31.2 million m3 of untreated sewage is used for irrigation purposes especially for vegetables and Khat trees. In addition, more than 70% of the population in Yemen has no potable water. They depend on water wells as a water source which are located close to sewage disposal sites. The present review focuses on the current status of water, wastewater as well as solid waste management in Yemen and their roles in the outbreak of cholera. Future prospects for waste management have been proposed.