CYChunli Ying

Chunli Ying

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Chunli Ying has a total of 14 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    An Auditable Gridded Wind–DEM-to-FE Workflow with Source Time, Spatial Contract, Texture Axis, and Solver Balance Gates: A Transmission Tower Case Study

    by Jun Chen, Chunli Ying, Yulong Chen, Hao Zhu, Daguang Han

    When gridded meteorological data drive finite element (FE) models, the interfaces carrying product identity, coordinates, axis order, time, and units are rarely checked. We built an auditable workflow linking an archived ECMWF gridded wind product, DEM metadata, Unity sampling, node exports, and ANSYS 2025 R2 comparisons, treating each interface as a gate that can fail. Three gates failed. The archived GRIB holds 48 monthly averages by hour of day (stream = mnth), not a continuous 48-h event; the runtime decoded magnitude from a constantly zero channel; and although the inline WGS84-to-UTM formula matches PROJ to 2.41 × 10−5 m, the wider mapping never closed, with none of the 234 towers inside the hard-coded wind subset and two Texture3D axes transposed. We then repaired what we could. Re-cropping the source to the line corridor and declaring the axis and vertical contracts moved tower containment from 0/234 to 234/234 and reproduced the source field to 0.0103 m/s against a 0.0307 m/s quantization step. Repeating the A–D solves with everything else fixed raised group A load from 292.050 to 355.034 N, displacement by 20.9%, and stress by 19.7%. The source time gate still fails, so results remain representative slot computations, not event responses. A synthetic control passes all six gates.

  • Open Access

    Integrated Multi-Mode Image-Based Corrosion Assessment and Probabilistic Reliability Framework for Steel Tower Structures Under Uncertainty

    by Hao Zhu, Chunli Ying, Yulong Chen, Jun Chen, Daguang Han

    Corrosion-driven section loss in steel tower structures erodes load-carrying capacity, yet field assessment still relies on subjective visual grading. This paper presents a closed-loop framework coupling quantitative image-based corrosion measurement with stochastic degradation modeling, Monte Carlo reliability simulation, and Sobol’ variance-based global sensitivity decomposition. Two complementary segmentation paths—hue–saturation–value (HSV) color-space thresholding for fleet-scale screening and DeepLabV3+ deep learning for detailed evaluation—convert imagery into calibrated section-loss estimates via nonlinear regression. Three analysis modes (single-image, multi-angle weighted-median fusion, and Oriented FAST and Rotated BRIEF (ORB) feature-matched temporal differencing) feed a Bayesian-updated power-law corrosion growth model whose outputs propagate through a time-dependent limit-state function via 106-sample Monte Carlo simulation. Sobol’ indices rank each uncertain input’s contribution to the reliability-index variance. A field demonstration on a 40-year-old galvanized lattice tower in an ISO 9223 C4 coastal environment shows that the corrosion rate constant and zinc coating thickness together govern 65% of the total reliability variance and that a risk-ranked selective maintenance strategy reduces expected life-cycle cost by 71% relative to blanket intervention.


  • Research on BIM and virtual pre-assembly technology in construction management

    by D. Han, C.N. Rolfsen, B.D. Engeland, H. Hosamo, H. Hjelmbrekke, K. Hu, T. Guo, C. Ying

    In the field of architecture, the virtual pre-assembly of prefabricated components (steel structure, some of concrete structure) need to obtain data through 3D laser scanning or other instruments, and then realize by computer virtual imitation. In recent years, the combination of BIM and virtual pre-assembly is more and more used in some large and complex steel structures, especially in the application of technology, and the effect is good. However, for the combination of BIM and virtual pre-assembly, there is little research on management. In this paper, the combination of BIM and virtual pre-assembly in the management of the application of a more in-depth study. Compared with the traditional construction management, the combination of BIM and virtual pre-assembly optimizes the key construction steps such as construction preparation, quality inspection, schedule management, resource coordination, etc., which can serve the whole life cycle of the project. We have applied the combination of BIM and virtual pre-assembly to the construction management of a large complex steel structure. The results show that the integration of BIM and virtual pre-assembly technology has many advantages over the traditional construction management. It can find some problems that traditional management can't find in advance, and allocate resources reasonably.