APAnastasiia Popova

Anastasiia Popova

*This is an algorithmically generated author record based on publicly available information.

Anastasiia Popova has a total of 13 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Management of a modern IT сompany: theoretical and technological aspects

    by Maksym Yevlanov, Viktor Levykin, Oleksandr Рetrychenko, Olga Neumyvakina, Borys Moroz, Dmytro Moroz, Ivan Iuriev, Tetiana Borysenko, Konstantin Petrov, Viktor Borysenko, et al.

    The object of the study is the processes of functioning and maintenance, which together determine the stage of operation of a web-based information system for managing an enterprise or organization.During the study, the problem of developing elements of the methodology for lifecycle management of a web-based information system was solved. Modern research in this area is mainly aimed at analyzing and developing individual aspects of managing the operation of complex systems. The main attention is paid to solving individual tasks of managing the operation of systems based on IoT or DevOps. General issues of creating and improving the System Lifecycle Management approach remain little studied.During the study, the main provisions of the effective management concept of the life cycle of a web-based information system were proposed. This concept is based on a multi-level representation of the information system and the possibility of effective management of the system according to its properties. For further formal description of the proposed concept, the main concepts were defined and the ontology of this concept was developed. Based on this ontology, a generalized model of effective management of the operation of a web-based information system and a set of theoretical and categorical models that detail the description of the elements of this model were developed.The resulting generalized model was taken as a basis for developing a formal problem statement of effective life cycle management of an operated information system as an IT service system. A formal description of the objective function and constraints of the problem of classical (permanent) life cycle management of an operated information system was proposed. On its basis, a formal description of the objective function and constraints of the problem of effective life cycle management of an operated web-based information system was proposed. It was determined that the problem of classical (permanent) life cycle management of an operated information system is a special case of the proposed problem of effective management.The practical application of the obtained research results allows improving systems for life cycle management of an operated information system without global reengineering of existing systems and technologies for data storage and processing.IntroductionMaksym Yevlanov Chapter 1. Basics of the effective management methodology of web-based information systemsViktor Levykin, Maksym Yevlanov, Oleksandr Рetrychenko, Olga Neumyvakina Chapter 2. Cost management of an information system it project in the conditions of incomplete information about its elementsMaksym Yevlanov, Viktor Levykin, Borys Moroz, Dmytro Moroz, Ivan IurievChapter 3. Method of automatic assignment of tasks to IT project performersTetiana Borysenko, Maksym Yevlanov, Konstantin Petrov, Viktor BorysenkoChapter 4. Method for assessing the complexity of an IT project for video game localizationMaksym Yevlanov, Nataliya Vasyltsova, Iryna Panforova, Dmytro OsypchukChapter 5. The task of quantitative assessment of changes in the long-term IT project management systemMaksym Yevlanov, Nataliya Vasyltsova, Iryna Panforova, Anastasiia Popova

  • The task of quantitative assessment of changes in the long-term IT project management system

    by Maksym Yevlanov, Nataliia Vasyltsova, Iryna Panforova, Anastasiia Popova

    Management of a modern IT company: theoretical and technological aspectsThe object of the study is the process of change management in an IT project.The study addressed the problem of quantitative assessment of changes that arise during the implementation of a long-term IT project. Existing common methods of change management do not allow for quantitative assessment of the main parameters of changes. Modern research is mainly aimed at solving the problem of quantitative assessment and change management within the entire IT project. The issue of quantitative assessment of changes that arise in the process of work of individual teams of IT project performers remains practically unexplored.In the course of the study, it was proposed to improve the existing method for quantitative assessment of changes, based on the Beckhard and Harris model. To improve this method, it was decided to use a descriptor approach. An improved method was developed, which, unlike the existing one, allows for quantitative assessment of changes based on the values of descriptors. These descriptors are formed in the process of performing sprints of a long-term IT project by its performers.Based on the improved method, elements of information technology for automated solution of the problem of quantitative assessment of changes in the management system of a long-term IT project have been developed. A description of the architecture of information technology has been proposed, its technological stack has been defined, and the results of the development of software elements have been presented.Experimental verification of the obtained research results was carried out within the framework of the long-term IT project "Web Constructor". The verification was carried out on the results of the work of one team of project developers. The calculation was based on data obtained during the team's execution of seven project sprints. The verification results showed that the predicted values of the indicators quite accurately coincide with the values of the time actually spent on implementing changes (0.97 and 0.81 for the sixth and seventh sprints of the IT project, respectively).Overall, the application of the improved method improved the change implementation rates during the IT project implementation and improved the team's attitude to the change management process by 14.5%. This allows to consider the improved method and implemented IT elements as a usable tool for change management of individual teams of IT project performers.