- Published by Geological Institute, Bulgarian Academy of Sciences in Engineering Geology and Hydrogeology
- Vol. 39 (1) , 171-180
Strengthening of a deep excavation with sheet pile walls and dewatering of a deep excavation for a residential building in Lozenets district, Sofia
The paper presents a case study of the construction and of an excavation pit with a depth of 8.65 m, under conditions of a high groundwater table and spatial constraints due to the presence of a major adjacent roadway. The excavation is enclosed by sheet pile walls designed to withstand bending moments of up to 250 kNm. Dewatering is performed by means of three drainage wells evenly distributed within the excavation. The drainage wells are 10 m deep, and pumping begins immediately after the installation of the sheet pile walls. This ensures a drained working area, which facilitates the excavation process. The anchoring system is arranged at a single level, with anchors 15 m in length, determined based on the research on active earth pressure. The adopted system of shoring and drainage proved to be effective, achieving almost zero displacement of the sheet pile walls.
- 14 November 2025
- Published by Geological Institute, Bulgarian Academy of Sciences in Engineering Geology and Hydrogeology
- Vol. 39 (1) , 171-180
Strengthening of a deep excavation with sheet pile walls and dewatering of a deep excavation for a residential building in Lozenets district, Sofia
The paper presents a case study of the construction and of an excavation pit with a depth of 8.65 m, under conditions of a high groundwater table and spatial constraints due to the presence of a major adjacent roadway. The excavation is enclosed by sheet pile walls designed to withstand bending moments of up to 250 kNm. Dewatering is performed by means of three drainage wells evenly distributed within the excavation. The drainage wells are 10 m deep, and pumping begins immediately after the installation of the sheet pile walls. This ensures a drained working area, which facilitates the excavation process. The anchoring system is arranged at a single level, with anchors 15 m in length, determined based on the research on active earth pressure. The adopted system of shoring and drainage proved to be effective, achieving almost zero displacement of the sheet pile walls.