MOMofiyinfoluwa Tobi Olowe

Mofiyinfoluwa Tobi Olowe

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Mofiyinfoluwa Tobi Olowe has a total of 1 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Resource-Significant Activity Costing in Offshore Structure Construction Projects Using Artificial Neural Network

    by Mofiyinfoluwa Tobi Olowe, Michael Ayomoh

    Fixed-bottom or floating offshore structures are the foundations, platforms, and associated infrastructure that allow for oil and gas production systems, offshore wind turbines, and cabling. The remote nature of these structures and the harsh environment with high variability in wind, waves, currents, and weather make construction activity very difficult and unpredictable; the cost of variation in the schedule can lead to high construction vessel and personnel costs. The adoption of artificial intelligence using trends observed in historical data can help achieve more accurate construction costs and schedule predictions, reducing the capital expenditure cost of installation. A resource-significant activity, sometimes called a resource-critical activity or high-resource-demand activity, is an activity on a construction or project schedule that consumes a disproportionately large share of one or more resources compared with others. Plant Design Modelling (PDM) is a digital process that creates and manages a detailed 3D model of a building’s physical and functional characteristics and semantic information, such as cost and schedule. PDM serves as a single source of truth for multidisciplinary activities and, therefore, serves as a rich data source for various construction applications, including project scheduling and cost estimation. Neural networks (NNs), a subset of machine learning algorithms inspired by the human brain, excel at identifying patterns in complex datasets and making predictions, such as forecasting costs based on non-linear relationships and historical trends. Data from an offshore structure modification project were extracted from Aveva’s Everything PDM, focusing on installation activities to create a dataset for machine learning model training. The structured data extracted exhibit non-linear patterns; therefore, linear, regularised linear, robust linear, and the ensemble (tree-based) models and supervised neural network models with varied architecture and hyperparameter values were evaluated and compared. The best performance was obtained using the deep-optimised ANN model. The result obtained is consistent with previous studies. The neural network models show a superior ability to predict the non-linear nature of offshore construction activities’ time.

  • Open Access

    Development of Integrated Framework for Automated Construction Progress Sensing, Monitoring and Evaluation

    by Mofiyinfoluwa Tobi Olowe, Michael Ayomoh

    The construction industry is increasingly adopting digital technologies to enhance productivity and efficiency, in alignment with the principles of Construction 4.0 (C4). The progress and advances recorded thus far are largely due to advancements in cyber-physical systems (CPS), computational processing power, deep learning solutions, robotics, and other related technologies. However, a major challenge in this research space is the lack of an integrated solution for both the interior and exterior construction environments, which has led to fragmented data, hindering efficiency. Several researchers have proposed frameworks in recent years that focused on either indoor or outdoor construction environments; this approach has resulted in the creation of siloed information, to the detriment of the C4 ideals and principles. In this study, a comprehensive system architecture for raw data captured using sensors and other inputs to provide useful insight for the construction team and stakeholders was mapped out. This study presents an integrated framework of various technologies for both indoor and outdoor construction environments. The solution provided for localisation algorithms and technologies such as Simultaneous Localisation and Mapping (SLAM), odometry, and inertial measurement unit (IMU) devices. The unified 5-level Cyber-Physical Systems (CPS) architecture was used as the primary architecture, and it was compared with the IoT Architecture layers in terms of data analytics and management perspectives. The Digital Twin (DT), which sits at the cyber level of the architecture, warehouses and tracks in real-time the dynamic complexities of the construction site throughout the project life cycle, serving as the single source of truth for the project. This system architecture and framework presented in this research contributed towards advancing the field of construction automation by offering a scalable solution for efficient construction in project management.