JNJanter Napitupulu

Janter Napitupulu

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Janter Napitupulu has a total of 9 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Evaluation and Modeling of Green Energy Consumption in North Sumatra, Indonesia

    by Janter Napitupulu, Suwarno Suwarno, Catra Indra Cahyadi, Sukarwoto Sukarwoto

    This paper discusses the level of green energy consumption in North Sumatra from 2020 to 2022 using the entropy method, the breakpoint method, and the integrated method. These three methods are applied to determine the feasibility of using new renewable energy. The three methods will be compared to each other to determine accuracy and options for analyzing models in the future. The level of green energy users from 2020 to 2022 generally shows a relatively stable and sustainable upward trend. During the 3 years there were fluctuations caused by the large growth rate of total energy consumption in North Sumatra, which increased by 6.35% from the previous year, and the level of urban green energy consumption grew steadily, which provided a more stable increase in user levels green energy with a sharp increase in the previous year. However, there are significant gaps in green energy consumption levels between cities. The contribution of this research is to select a model that will be applied in North Sumatra and provide input for policymakers regarding future energy and can have a positive impact on technological innovation, industry, and financial support in particular.


  • Open Access

    STUDY PERHITUNGAN PENERIMAAN SINYAL DENGAN MODEL PROPAGASI OKUMURA

    by Dewi Sholeha, Janter Napitupulu, Muchsin Harahap, Sri Ulina

    Cakupan pelayanan dalam system komunikasi bergerak adalah berupa lingkungan yang memiliki permukaan tidak teratur. Oleh karena itu menghitung redaman lintasan propagasi radionya membutuhkan perhitungan yang kompleks. Dalam beberapa dekade terakhir telah dikembangkan beberapa model propagasi secara empiris oleh para ahli untuk perencanaan jaringan komunikasi bergerak. Adapun diantaranya adalah model okumura, model hatta, dan diperoleh hasil analisa perhitungan rugi-rugi propagasi dan penerimaan daya pada sisi receiver dengan menggunakan metode okumura yang diimplementasikan dengan Lokumura = 139,1 dB dengan penerimaan daya pada sisi receiver sebesar Pr = -971 dBm Kata kunci : Sinyal, Propogasi, Permodelan, Model Okumura Abstract—Service coverage in a mobile communication system is in the form of an environment that has an irregular surface. Therefore calculating the attenuation of the radio propagation path requires complex calculations. In the last decades several propagation models have been developed empirically by experts for planning mobile communication networks. Among them are the Okumura model, the Hatta model, and the results obtained from the analysis of propagation losses and power reception on the receiver side using the Okumura method which is implemented with Lokumura = 139.1 dB with power reception on the receiver side is Pr = -971 dBm Keywords : Signals, Propagation, Modeling, Okumura Models

  • Open Access

    STUDY PERENCANAAN PLTS SISTEM OFF GRID SKALA KECIL RUMAH TANGGA

    by Janter Napitupulu, Dewi Sholeha, Joslen Sinaga, Rasmi Sitohang, Reinhard Napitupulu

    Energy listrik sangat penting peranannya dengan perkembangan teknologi modern disemua sector. Tujuan dari penelitian ini adalah merancang system kelistrikan PLTS dalam memenuhi kebutuan listrik rumah tangga dalam kurun waktu 1 hari. Dalam penelitian dihitung panel surya yang digunakan adalah 20 lembar panel surya Monocrystalline 200 Wp, 8 unit baterai Solana SOF 12-200. 200 Ah dengan 2 rangkaian seri dan 4 paralel, SCC MPPT PowMr dengan kapasitas arus 60 A, Inverter PSW tegangan 24 V dengan daya 2000W. Apabila setiap komponen terpasang telah memenuhi spesifikasi, maka system PLTS ini akan mampu melayani 1 rumah dengan daya beban 21.12 Kw selama 1 hari atau 10,56 Kw selama 2 hari