XSXiaotong Sun

Xiaotong Sun

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Xiaotong Sun has a total of 7 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Research on Multi-Field Coupling Response and Alignment Control of Super-Long-Span Steel Box Girder Synchronous Lifting

    by Hongyu Xu, Xiaotong Sun, Xiaofeng Liu, Wenjie Li

    To investigate the posture control of super-long-span heavy steel box girders during synchronous lifting, this study takes the integral lifting project of the 82 m-span steel box girder of Xiaotun Bridge on the Fuyi Expressway as a case study. A fluid–solid–thermal three-field coupled numerical model was established using Midas NFX 2024 R1 (a general-purpose finite element analysis software for multi-physics and fluid–structure interaction simulations) to explore the alignment and end-displacement characteristics of the steel box girder throughout the lifting process. The results show that under combined thermal and wind loads, girder deflection presents a daily cyclic pattern: temperature rise induces upward arching, while wind-induced vibration generates a mid-span instantaneous amplitude of ±25.0 mm, with a maximum coupled deflection of 31.78 mm. Girder end-displacement increases significantly at lifting heights of 5–25 m and peaks at 25 m. With further height increase and shortened sling length, sway frequency rises while maximum displacement gradually declines. When the plane tilt ratio exceeds 0.17% or the overall unbalanced displacement at lifting points exceeds 12 mm, local stress exceeds 95% of the allowable value, implying potential instability risks. For construction safety, a synchronous intelligent hydraulic lifting system based on the “displacement synchronization and load balancing” strategy was applied. Supported by real-time sensor feedback and adjustment, the system achieves millimeter-level lifting precision and welding positioning accuracy. This study provides a reference for similar synchronous lifting practices of large-span steel box girders.

  • Open Access

    Analysis of Wind-Induced Response During the Lifting Construction of Super-Large-Span Heavy Steel Box Girders

    by Shuhong Zhu, Xiaotong Sun, Xiaofeng Liu, Wenjie Li, Bin Liang

    Wind-induced response poses a significant challenge to the stability of extra-large-span heavy steel box girders during synchronous lifting operations. This study adopted a method combining numerical simulation with on-site monitoring to investigate the aerodynamic characteristics the beam during the overall hoisting process of the Xiaotun Bridge. A high-fidelity finite element model was established using Midas NFX 2024 R1, and fluid–structure interaction (FSI) analysis was conducted, utilizing the RANS k-ε turbulence model to simulate stochastic wind fields. The results show that during the lifting stage from 3 m to 25 m, the maximum horizontal displacement of the steel box girder rapidly increases at wind angles of 90° and 60°, and the peak displacement is reached at 25 m. Under a strong breeze at a 90° wind angle and 25 m lifting height, the maximum lateral displacement was 42.88 mm based on FSI analysis, which is approximately 50% higher than the 28.58 mm obtained from linear static analysis. Subsequently, during the 25 m to 45 m lifting stage, the displacement gradually decreases and exhibits a linear correlation with lifting height. Concurrently, the maximum stress of the lifting lug of the steel box girder increases rapidly in the 3–25 m lifting stage, reaches the maximum at 25 m, and gradually stabilizes in the 25–45 m lifting stage. The lug stress under the same critical condition reached 190.80 MPa in FSI analysis, compared with 123.83 MPa in static analysis, highlighting a significant dynamic amplification. Furthermore, the detrimental coupling effect between mechanical vibrations from the lifting platform and wind loads was quantified; the anti-overturning stability coefficient was reduced by 10.48% under longitudinal vibration compared with lateral vibration, and a further reduction of up to 39.33% was caused by their synergy with wind excitation. Field monitoring validated the numerical model, with stress discrepancies below 9.7%. Based on these findings, a critical on-site wind speed threshold of 9.38 m/s was proposed, and integrated control methods were implemented to ensure construction safety. During on-site lifting, lifting lug stresses were monitored in real time, and if the predefined threshold was exceeded, contingency measures were immediately activated to ensure a controlled termination.