Gina Cynthia R Hasibuan
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Gina Cynthia R Hasibuan has a total of 5 co-authors. Here are the top co-authors by number of shared publications:
- Ahmad Rivin Damanik
Universitas Sumatera Utara, Indonesia
1 shared publication - Baby Purba
Universitas Sumatera Utara, Indonesia
1 shared publication - Roesyanto Roesyanto
Department of Civil Engineering, Universitas Sumatera Utara, Jl. Dr. Mansyur Kampus USU, Sumatera Utara, Medan, Indonesia 20155
1 shared publication - Rudianto Surbakti
Politeknik Negeri Medan
1 shared publication Zaid Perdana Nasution
Universitas Sumatera Utara, Indonesia
1 shared publication
Latest Publications
- Open Access
- 25 December 2022
- Published by Ridwan Institute in Jurnal Syntax Admiration
- Vol. 3 (12) , 1569-1585
Analisis Konsolidasi dengan Metode Preloading dikombinasikan dengan PVD berdasarkan Perhitungan Analitis dan Plaxis 2d
Soft soil has poor soil characteristics. These soils generally have high compressibility, low permeability and low carrying capacity. Soil improvement by preloading and PVD is one of the common soil improvement methods to speed up the process of soil consolidation. The initial loading is carried out with the aim of consolidating the soft soil layer with the same or more loading amount than the load that will be carried by the soil both during and after construction. While vertical drainage can speed up the consolidation process. This analysis aims to determine the magnitude of consolidation settlement using analytical methods and finite element methods with PLAXIS 2D modeling, the effect of modeling using quadratic triangle elements (6 nodal points) and quartic triangle elements (15 nodal points) on the consolidation magnitude and calculation processing time. The method used in this thesis is the analytical method using Terzaghi's theory and the finite element method using PLAXIS 2D. From the results of the analysis it was found that the use of a quadratic triangle element with 6 nodal points and 15 nodal points did not have a significant effect on the reduction results, but had a large effect on the length of the calculation process. After analyzing using 2D modeling using a quadratic triangle element with 6 nodal points and a quartic triangle element with 15 nodal points, a decrease of -6.673 meters for 6 nodal points and -6.669 meters for 15 nodal points is obtained. There was no significant difference between the two methods, which was only 4 mm different. The time needed to calculate with 6 nodes is about 1 hour and 15 nodes is about 4 hours.
- 25 December 2022
- Published by Ridwan Institute in Jurnal Syntax Admiration
- Vol. 3 (12) , 1569-1585
Open AccessAnalisis Konsolidasi dengan Metode Preloading dikombinasikan dengan PVD berdasarkan Perhitungan Analitis dan Plaxis 2d
Soft soil has poor soil characteristics. These soils generally have high compressibility, low permeability and low carrying capacity. Soil improvement by preloading and PVD is one of the common soil improvement methods to speed up the process of soil consolidation. The initial loading is carried out with the aim of consolidating the soft soil layer with the same or more loading amount than the load that will be carried by the soil both during and after construction. While vertical drainage can speed up the consolidation process. This analysis aims to determine the magnitude of consolidation settlement using analytical methods and finite element methods with PLAXIS 2D modeling, the effect of modeling using quadratic triangle elements (6 nodal points) and quartic triangle elements (15 nodal points) on the consolidation magnitude and calculation processing time. The method used in this thesis is the analytical method using Terzaghi's theory and the finite element method using PLAXIS 2D. From the results of the analysis it was found that the use of a quadratic triangle element with 6 nodal points and 15 nodal points did not have a significant effect on the reduction results, but had a large effect on the length of the calculation process. After analyzing using 2D modeling using a quadratic triangle element with 6 nodal points and a quartic triangle element with 15 nodal points, a decrease of -6.673 meters for 6 nodal points and -6.669 meters for 15 nodal points is obtained. There was no significant difference between the two methods, which was only 4 mm different. The time needed to calculate with 6 nodes is about 1 hour and 15 nodes is about 4 hours.
- Open Access
- 22 December 2022
- Published by Ridwan Institute in Jurnal Syntax Admiration
- Vol. 3 (12) , 1544-1558
Evaluasi Penerapan Sistem Manajemen Keselamatan dan Kesehatan Kerja (SMK 3) pada Proyek Preservasi Jalan Simpang Siak Sri Indrapura – Mengkapan/Buton (MYC) di Kabupaten Siak
Occupational safety and health is an instrument that protects workers, companies, the environment, and the surrounding community from hazards due to work accidents. This protection is a human right that must be fulfilled by the company. K3 aims to prevent, reduce, even eliminate the risk of work accidents (zero accident). In the field of construction services, there are many problems regarding the not yet optimal implementation of the Occupational Safety and Health Management System (SMK3), while the implementation has not been optimal due to several factors. One of the activities that influence the success of the job is the capacity and capability of the service provider. Evaluation of service provider performance appraisal is the process of measuring, analyzing, and managing provider performance with the aim of reducing costs, reducing risk and directing continuous improvement in value and operations. This study seeks to evaluate the performance of service providers in implementing SMK3 based on the SMK3 Implementation Criteria using the AHP (Analytical Hierarchy Process) method. The research location is the Siak Sri Indrapura - Meng Kapan / Buton (MYC) Simpang Siak Road Preservation project in Siak Regency, Riau Province which is one of the construction projects that has a high risk of work accidents.
- 22 December 2022
- Published by Ridwan Institute in Jurnal Syntax Admiration
- Vol. 3 (12) , 1544-1558
Open AccessEvaluasi Penerapan Sistem Manajemen Keselamatan dan Kesehatan Kerja (SMK 3) pada Proyek Preservasi Jalan Simpang Siak Sri Indrapura – Mengkapan/Buton (MYC) di Kabupaten Siak
Occupational safety and health is an instrument that protects workers, companies, the environment, and the surrounding community from hazards due to work accidents. This protection is a human right that must be fulfilled by the company. K3 aims to prevent, reduce, even eliminate the risk of work accidents (zero accident). In the field of construction services, there are many problems regarding the not yet optimal implementation of the Occupational Safety and Health Management System (SMK3), while the implementation has not been optimal due to several factors. One of the activities that influence the success of the job is the capacity and capability of the service provider. Evaluation of service provider performance appraisal is the process of measuring, analyzing, and managing provider performance with the aim of reducing costs, reducing risk and directing continuous improvement in value and operations. This study seeks to evaluate the performance of service providers in implementing SMK3 based on the SMK3 Implementation Criteria using the AHP (Analytical Hierarchy Process) method. The research location is the Siak Sri Indrapura - Meng Kapan / Buton (MYC) Simpang Siak Road Preservation project in Siak Regency, Riau Province which is one of the construction projects that has a high risk of work accidents.