    Power System Operating and Managing Under Rapidly Changing Amounts of Grid-Inverter-Connected RES

    by Dimitrina Koeva, Ivaylo Ivanov, Dimitar Slavov, Georgi Bankov, Metodi Dimitrov

    The energy sector is considered one of the most critical sectors because disruptions to the power supply, problems with systems for monitoring operational parameters, and issues with power management processes have a direct impact on the economy, public order, and national security. On the one hand, the technological maturity of energy facilities is changing, and the share of grid-inverter-connected renewable energy sources (GICRES) is expanding. In this article, the authors discuss the basic concepts and classifications of stability-related subsystems. The new trends and challenges facing the resilience of the electrical energy system (EES) in the context of dynamic processes arising from the deployment of renewable energy sources (RES) are analyzed. This paper aims to present a more comprehensive concept of the static and dynamic stability of the EES, considering the impact of grid-inverter-connected renewable energy sources (GICRES).

  • Open Access

    Progress on Developing a Sustainable BESS Technical–Economic Model by Mapping the Latest Grid-Connected Installations in Bulgaria

    by Dimitrina Koeva, Metodi Dimitrov, Vladimir Zinoviev

    The rapid construction and commissioning of battery energy storage system (BESS) installations, both standalone and combined with photovoltaic power plants (PVPPs), is rapidly reshaping the energy market. Mapping these latest iterations in the energy infrastructure allows for a detailed analysis of the effects they have on the grid, in correlation with the already abundant operational PPV. This paper will provide a list of all BESS installations commissioned between 1 January and 30 September 2025. Taking into consideration their grid-connection power, and respective battery capacity, along with their geographical location and co-located (or lack thereof) PVPPs, the following-up analysis aims to answer several key questions: how do these installations compare to one another in terms of power, capacity and distribution across Bulgaria; how do they affect the availability of electric power from PVPP, co-located or not, to the end consumers; and how does that shift in availability affect the profits, both for the BESS and PVPP owners, based on the shifting price of electricity?