Andi Hida
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Andi Hida has a total of 18 co-authors. Here are the top co-authors by number of shared publications:
Rajmonda Bualoti
Polytechnic University of Tirana,Department of Electric Power Systems,Tirana,Albania
7 shared publicationsMarialis Çelo
5 shared publicationsDonard Shaliu
4 shared publicationsDiamant Gashi
2 shared publicationsKlajdi Kamberi
2 shared publicationsOlsi Karapici
2 shared publications
Latest Publications
- Open Access
- 1 February 2026
- Published by Institute of Advanced Engineering and Science in Bulletin of Electrical Engineering and Informatics
- Vol. 15 (1) , 39-47
Using LabVIEW software for remote voltage, current, and THD measuring and improving in the electrical grid
The increasing penetration of photovoltaic (PV) systems has raised concerns about power quality due to the harmonic distortion injected during DC–AC conversion by inverters. These harmonics can interfere with nearby electrical devices and compromise grid stability. This paper presents a LabVIEW-based virtual instrument designed specifically for real-time monitoring, analysis, and mitigation of voltage and current harmonics in grid-connected PV systems. The core contribution of this work lies in the development of an interactive, software-based platform that not only measures total harmonic distortion (THD) in real time but also allows users to design and simulate harmonic filters dynamically. The system achieved a reduction of current THD by 52% and voltage THD by 73% under tested conditions, demonstrating its effectiveness in improving power quality. Unlike conventional hardware-dependent solutions, the proposed tool offers a low-cost, easily customizable, and scalable approach suitable for educational laboratories, field diagnostics, and smart grid applications. By enabling remote control and filter tuning through LabVIEW, this solution supports the growing demand for intelligent power quality management and facilitates the seamless integration of renewable energy into modern electrical grids.
- 1 February 2026
- Published by Institute of Advanced Engineering and Science in Bulletin of Electrical Engineering and Informatics
- Vol. 15 (1) , 39-47
Open AccessUsing LabVIEW software for remote voltage, current, and THD measuring and improving in the electrical grid
The increasing penetration of photovoltaic (PV) systems has raised concerns about power quality due to the harmonic distortion injected during DC–AC conversion by inverters. These harmonics can interfere with nearby electrical devices and compromise grid stability. This paper presents a LabVIEW-based virtual instrument designed specifically for real-time monitoring, analysis, and mitigation of voltage and current harmonics in grid-connected PV systems. The core contribution of this work lies in the development of an interactive, software-based platform that not only measures total harmonic distortion (THD) in real time but also allows users to design and simulate harmonic filters dynamically. The system achieved a reduction of current THD by 52% and voltage THD by 73% under tested conditions, demonstrating its effectiveness in improving power quality. Unlike conventional hardware-dependent solutions, the proposed tool offers a low-cost, easily customizable, and scalable approach suitable for educational laboratories, field diagnostics, and smart grid applications. By enabling remote control and filter tuning through LabVIEW, this solution supports the growing demand for intelligent power quality management and facilitates the seamless integration of renewable energy into modern electrical grids.
- Open Access
- 1 August 2025
- Published by IOP Publishing in IOP Conference Series: Earth and Environmental Science
- Vol. 1532 (1)
Assessing the Integration of a 60 MW Wind Farm into the Albanian Power System
This paper analyzes the impact of wind turbine connection in the Albanian power system. More specifically, the integration of 10 wind turbines with a total power of 60 MW (at 110/400 kV voltage), connected to the Zemblak substation, is taken as a case study. It is worth noting that type 4 (Full Bridge converter) was chosen as the wind turbine type. Furthermore, by choosing the Koman node as the balancing node of the system, voltage and frequency fluctuations were analyzed for 4 different scenarios: 3-Phase line to ground fault, disconnection from the system, connection to the system and reduction of the farm’s power. The results show that despite some voltage and frequency fluctuations, the inertia of the Albanian power system is quite large due to the presence of hydro-generators. However, for wind farms with greater power than that considered in this paper, further studies to analyze their impact on the system are necessary.
- 1 August 2025
- Published by IOP Publishing in IOP Conference Series: Earth and Environmental Science
- Vol. 1532 (1)
Open AccessAssessing the Integration of a 60 MW Wind Farm into the Albanian Power System
This paper analyzes the impact of wind turbine connection in the Albanian power system. More specifically, the integration of 10 wind turbines with a total power of 60 MW (at 110/400 kV voltage), connected to the Zemblak substation, is taken as a case study. It is worth noting that type 4 (Full Bridge converter) was chosen as the wind turbine type. Furthermore, by choosing the Koman node as the balancing node of the system, voltage and frequency fluctuations were analyzed for 4 different scenarios: 3-Phase line to ground fault, disconnection from the system, connection to the system and reduction of the farm’s power. The results show that despite some voltage and frequency fluctuations, the inertia of the Albanian power system is quite large due to the presence of hydro-generators. However, for wind farms with greater power than that considered in this paper, further studies to analyze their impact on the system are necessary.
- 1 June 2025
- Published by SDEWES Centre in Journal of Sustainable Development of Energy, Water and Environment Systems
- Vol. 13 (2) , 1-10
Impact of Photovoltaic Penetration on the Distribution System Operation. Case Study Albania
- 1 June 2025
- Published by SDEWES Centre in Journal of Sustainable Development of Energy, Water and Environment Systems
- Vol. 13 (2) , 1-10
Impact of Photovoltaic Penetration on the Distribution System Operation. Case Study Albania
- 1 February 2025
- Published by Institution of Engineering and Technology (IET) in IET Conference Proceedings
- Vol. 2024 (29) , 156-161
Optimization and performance of bifacial PV system compared to monofacial
- 1 February 2025
- Published by Institution of Engineering and Technology (IET) in IET Conference Proceedings
- Vol. 2024 (29) , 156-161
Optimization and performance of bifacial PV system compared to monofacial
- 27 November 2024
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-6
Impact of Distributed PV Penetration on Power Transmission Lines
Based on the unexploited hydro capacity of Albania, government policies have encouraged continued investment in order to build new hydropower plants (HPPs). Meanwhile, most of them are installed to the distribution system. On the other hand, the photovoltaic (PV) systems have been intensively promoted in Albania, pushed by support mechanisms frameworks, PV cost reduction and solar radiation potential. Thus, under the circumstances of a high and rapid RES penetration, it is important to analyze the power system parameters. In this context, this paper presents the impact of PV Penetration on the 110 kV Power Transmission Lines, analyzing performance indexes, such as: Voltage Profile Improvement Index (VPII), Line Transmission Apparent Power Improvement Index (LTAPII), Line Loss Reduction Index (LLRI), Line Loading, as well as Line Losses. The Kukës distribution system area is taken as a case study. This area is characterizing of the presence of 5 run-off-river HPPs, which represent 66% of actual hosting capacity (HC). Meanwhile, this value is lower, because HPPs cannot produce electricity at full capacity all the time. However, even in maximum HPPs generation case, the lines loading is below 100%. Thus, there is still available transmission capacity, for PV penetration. For this reason, the maximum PV capacity connected in various distribution busbars is identify, considering different scenarios (with/without PVs), and different PV penetration level (with a maximum of 54 MWp). A comparison between the base scenario (50% of HPPs production) and the other ones (50 % of HPPs + different PVs production) has been carried out. The results show an improvement in all of the performance indexes (according to the Albanian Transmission Code), for low PV penetration (up to 40% of PVs maximum capacity). For example, while the line losses are reduced up to 50%, the VPII in the system is improved up to 0.06%. On the other hand, the further increase of PV penetration (over 50%), leads to deterioration in the transmission lines. For maximum PV capacity (54 MWp), the total transmission apparent power increases by 2.3 times, increasing losses by 2.6 times. In this way, we conclude that, choosing the right level of PV penetration would bring benefits to the transmission power lines.
- 27 November 2024
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-6
Impact of Distributed PV Penetration on Power Transmission Lines
Based on the unexploited hydro capacity of Albania, government policies have encouraged continued investment in order to build new hydropower plants (HPPs). Meanwhile, most of them are installed to the distribution system. On the other hand, the photovoltaic (PV) systems have been intensively promoted in Albania, pushed by support mechanisms frameworks, PV cost reduction and solar radiation potential. Thus, under the circumstances of a high and rapid RES penetration, it is important to analyze the power system parameters. In this context, this paper presents the impact of PV Penetration on the 110 kV Power Transmission Lines, analyzing performance indexes, such as: Voltage Profile Improvement Index (VPII), Line Transmission Apparent Power Improvement Index (LTAPII), Line Loss Reduction Index (LLRI), Line Loading, as well as Line Losses. The Kukës distribution system area is taken as a case study. This area is characterizing of the presence of 5 run-off-river HPPs, which represent 66% of actual hosting capacity (HC). Meanwhile, this value is lower, because HPPs cannot produce electricity at full capacity all the time. However, even in maximum HPPs generation case, the lines loading is below 100%. Thus, there is still available transmission capacity, for PV penetration. For this reason, the maximum PV capacity connected in various distribution busbars is identify, considering different scenarios (with/without PVs), and different PV penetration level (with a maximum of 54 MWp). A comparison between the base scenario (50% of HPPs production) and the other ones (50 % of HPPs + different PVs production) has been carried out. The results show an improvement in all of the performance indexes (according to the Albanian Transmission Code), for low PV penetration (up to 40% of PVs maximum capacity). For example, while the line losses are reduced up to 50%, the VPII in the system is improved up to 0.06%. On the other hand, the further increase of PV penetration (over 50%), leads to deterioration in the transmission lines. For maximum PV capacity (54 MWp), the total transmission apparent power increases by 2.3 times, increasing losses by 2.6 times. In this way, we conclude that, choosing the right level of PV penetration would bring benefits to the transmission power lines.
- 14 May 2024
- Published by World Scientific and Engineering Academy and Society (WSEAS) in WSEAS TRANSACTIONS ON POWER SYSTEMS
- Vol. 19, 204-228
Wind Power Integration and Challenges in Low Wind Zones. A Study Case: Albania
High wind performance systems are influenced by many factors such as site wind resources and configuration, technical wind turbine features and many financial conditions. Scenario planning and modelling activities often focus on restricted parameters and numbers to justify wind power plant performance. To better understand possible pathways to scaling up the distributed wind market in Albania, a deep and multidimensional calculations based on Monte Carlo analysis, using RETScreen and wind JEDI model, to assess socio-economic impact as a function of turbine output power, operating and maintenance cost and many other financial inputs by testing different WT (i.e., VESTAS, GAMESA, W2E and NORDEX) with rated power from 3.45 MW up to 4.5MW applied on LCOE, NPV, SPP, equity payback, B-C, after-tax IRR on equity and effects of GHG credits extended at a sensitivity range of ±35% is scientifically performed. From the simulation results LCOE reaches a minimal value of €43.48/MWh, if the debt rate is 99 % and a debt interest rate of 5.0%, a TotCapEx of €828/MW (-35 % less expenditures) indexed as the best scenario. For the base case scenario LCOE results €62.79/MWh, when applying a debt rate of 80% and a TotCapEx of (€1274/MW), while in the worst-case scenario LCOE impart a maximal value of €87.63/MWh if a TotCapEx of €1720/MW (+35 % more expenditures) and a share of 52 % debt rate is applied. Local annual economic impact (m€) during construction period and operating period evaluated in the wind JEDI model result around m€ 89.92 and m€ 23.54, respectively. As a conclusion, wind power plants (WPP), installed in low wind zones (Albania and many other EU countries) would be of interest if an electricity export rate of 110€/MWh, and a GHG credit rate of €50/tCO2 were accepted.
- 14 May 2024
- Published by World Scientific and Engineering Academy and Society (WSEAS) in WSEAS TRANSACTIONS ON POWER SYSTEMS
- Vol. 19, 204-228
Wind Power Integration and Challenges in Low Wind Zones. A Study Case: Albania
High wind performance systems are influenced by many factors such as site wind resources and configuration, technical wind turbine features and many financial conditions. Scenario planning and modelling activities often focus on restricted parameters and numbers to justify wind power plant performance. To better understand possible pathways to scaling up the distributed wind market in Albania, a deep and multidimensional calculations based on Monte Carlo analysis, using RETScreen and wind JEDI model, to assess socio-economic impact as a function of turbine output power, operating and maintenance cost and many other financial inputs by testing different WT (i.e., VESTAS, GAMESA, W2E and NORDEX) with rated power from 3.45 MW up to 4.5MW applied on LCOE, NPV, SPP, equity payback, B-C, after-tax IRR on equity and effects of GHG credits extended at a sensitivity range of ±35% is scientifically performed. From the simulation results LCOE reaches a minimal value of €43.48/MWh, if the debt rate is 99 % and a debt interest rate of 5.0%, a TotCapEx of €828/MW (-35 % less expenditures) indexed as the best scenario. For the base case scenario LCOE results €62.79/MWh, when applying a debt rate of 80% and a TotCapEx of (€1274/MW), while in the worst-case scenario LCOE impart a maximal value of €87.63/MWh if a TotCapEx of €1720/MW (+35 % more expenditures) and a share of 52 % debt rate is applied. Local annual economic impact (m€) during construction period and operating period evaluated in the wind JEDI model result around m€ 89.92 and m€ 23.54, respectively. As a conclusion, wind power plants (WPP), installed in low wind zones (Albania and many other EU countries) would be of interest if an electricity export rate of 110€/MWh, and a GHG credit rate of €50/tCO2 were accepted.
- 1 January 2024
- Published by University Ss. Cyril and Methodius in Skopje in Journal of Electrical Engineering and Information Technologies
- Vol. 9 (1) , 21-31
FORECASTING PV PRODUCTION USING FUZZY REASONING APPROACH
- 1 January 2024
- Published by University Ss. Cyril and Methodius in Skopje in Journal of Electrical Engineering and Information Technologies
- Vol. 9 (1) , 21-31
FORECASTING PV PRODUCTION USING FUZZY REASONING APPROACH
- 28 July 2022
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- Vol. I, 1-5
Impact of DER in Distribution System Reliability Indices: An Albanian Case Study
The connection of new hydro sources to the distribution network has had an impact on various technical parameters like losses, peak load, balance of exchanged energy, electricity production, and profile of the voltage as well as directly has affected the supply reliability. This paper is based on analytical methods, different reliability evaluation criteria, which are calculated with key parameters such as SAIFI and SAIDI as well as hosting capacity evaluation. Utilization of reliability indices at the operating district levels has allowed us to more accurately pinpoint trouble areas of the distribution network.
- 28 July 2022
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- Vol. I, 1-5
Impact of DER in Distribution System Reliability Indices: An Albanian Case Study
The connection of new hydro sources to the distribution network has had an impact on various technical parameters like losses, peak load, balance of exchanged energy, electricity production, and profile of the voltage as well as directly has affected the supply reliability. This paper is based on analytical methods, different reliability evaluation criteria, which are calculated with key parameters such as SAIFI and SAIDI as well as hosting capacity evaluation. Utilization of reliability indices at the operating district levels has allowed us to more accurately pinpoint trouble areas of the distribution network.