Galih Wulandari Subagyo
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Galih Wulandari Subagyo has a total of 2 co-authors. Here are the top co-authors by number of shared publications:
- Resdiansyah Resdiansyah
Fakultas Teknologi dan Design, Universitas Pembanggunan Jaya
1 shared publication - Rizka Arbaningrum
Universitas Pembangunan Jaya
1 shared publication
Latest Publications
- Open Access
- 29 December 2022
- Published by Universitas Trisakti in Indonesian Journal of Construction Engineering and Sustainable Development (CESD)
- Vol. 5 (2) , 30-37
ANALISIS LABOUR UTILITATION RATE TENAGA KERJA (Studi Kasus Proyek Bintaro Jaya Xchange Tahap II, Tangerang Selatan)
Labor productivity is one of the many factors that can influence the success of a development project in the construction industry.The LUR (Labor Utilitation Rate) parameter of each worker is one method for measuring labor productivity. Several factors influenced worker productivity during the pandemic, including age, work experience, education level, wage suitability, family responsibilities, worker health, health impact, development of health protocols, worker relations, and management. The goal of this study was to determine the level of productivity (LUR) of each worker at the Bintaro Jaya Xchange Phase II Project during the Covid-19 pandemic, with the limitations of the research being data collection through observation with research time conducted Monday through Friday (Weekdays), Saturday through Sunday (Weekend) at 08.00 WIB to 16.00 WIB (for 7 working days). According to the findings of the study, Leso, Rahman, Didi, Basuki, Saluyu, and Caca had the highest LUR (Labor Utilitation Rate), at 86.61%. While the national average LUR (Labor Utilitization Rate) is 79.53%. As a result of the data obtained, it is possible to conclude that the level of work productivity at work during the Covid-19 pandemic was satisfactory, owing to a worker utility factor or LUR (Labor Utilization Rate) value of more than 50%
- 29 December 2022
- Published by Universitas Trisakti in Indonesian Journal of Construction Engineering and Sustainable Development (CESD)
- Vol. 5 (2) , 30-37
Open AccessANALISIS LABOUR UTILITATION RATE TENAGA KERJA (Studi Kasus Proyek Bintaro Jaya Xchange Tahap II, Tangerang Selatan)
Labor productivity is one of the many factors that can influence the success of a development project in the construction industry.The LUR (Labor Utilitation Rate) parameter of each worker is one method for measuring labor productivity. Several factors influenced worker productivity during the pandemic, including age, work experience, education level, wage suitability, family responsibilities, worker health, health impact, development of health protocols, worker relations, and management. The goal of this study was to determine the level of productivity (LUR) of each worker at the Bintaro Jaya Xchange Phase II Project during the Covid-19 pandemic, with the limitations of the research being data collection through observation with research time conducted Monday through Friday (Weekdays), Saturday through Sunday (Weekend) at 08.00 WIB to 16.00 WIB (for 7 working days). According to the findings of the study, Leso, Rahman, Didi, Basuki, Saluyu, and Caca had the highest LUR (Labor Utilitation Rate), at 86.61%. While the national average LUR (Labor Utilitization Rate) is 79.53%. As a result of the data obtained, it is possible to conclude that the level of work productivity at work during the Covid-19 pandemic was satisfactory, owing to a worker utility factor or LUR (Labor Utilization Rate) value of more than 50%
- Open Access
- 30 December 2021
- Published by Universitas Trisakti in Indonesian Journal of Construction Engineering and Sustainable Development (CESD)
- Vol. 4 (2) , 119-125
ANALISIS SURVEY TINGKAT KEPUASAN WARGA PUCUNG 1 TERHADAP PEMBUATAN TAMPULAMBOT
This study aims to measure the level of satisfaction of the residents of Pondok Pucung 1 towards community service activities making tabulampot. Data was obtained by distributing questionnaires to 15 respondents who were measured using a Likert scale. The results showed that from nine aspects, namely the delivery of goals and objectives of community service by the implementers of the activity time for village officials, 0.917 were strongly agreed. In delivering the goals and objectives, it is equipped with materials such as power points, etc., from 0.9, which is strongly agree. The suitability between the delivery of goals and objectives with the implementation in the field is 0.967, which is strongly agree. There is a difference between before the community service activities were carried out and before the activities were 0.983, which is strongly agree. The community around the community service location helps for plant care 0.967, which is very agreeable. In general, citizens' satisfaction with the existence of community service activities 1, which is strongly agree. Tabulampot gardens make the environment beautiful 1, which is very agreeable. Tabulampot gardens make local residents more comfortable 0.983, which is very much agree. Tabulampot gardens make local residents more peaceful 0.983, which is very agreeable. Overall, the residents of Pondok Pucung 1 are very satisfied with the community service in making tabulampot.
- 30 December 2021
- Published by Universitas Trisakti in Indonesian Journal of Construction Engineering and Sustainable Development (CESD)
- Vol. 4 (2) , 119-125
Open AccessANALISIS SURVEY TINGKAT KEPUASAN WARGA PUCUNG 1 TERHADAP PEMBUATAN TAMPULAMBOT
This study aims to measure the level of satisfaction of the residents of Pondok Pucung 1 towards community service activities making tabulampot. Data was obtained by distributing questionnaires to 15 respondents who were measured using a Likert scale. The results showed that from nine aspects, namely the delivery of goals and objectives of community service by the implementers of the activity time for village officials, 0.917 were strongly agreed. In delivering the goals and objectives, it is equipped with materials such as power points, etc., from 0.9, which is strongly agree. The suitability between the delivery of goals and objectives with the implementation in the field is 0.967, which is strongly agree. There is a difference between before the community service activities were carried out and before the activities were 0.983, which is strongly agree. The community around the community service location helps for plant care 0.967, which is very agreeable. In general, citizens' satisfaction with the existence of community service activities 1, which is strongly agree. Tabulampot gardens make the environment beautiful 1, which is very agreeable. Tabulampot gardens make local residents more comfortable 0.983, which is very much agree. Tabulampot gardens make local residents more peaceful 0.983, which is very agreeable. Overall, the residents of Pondok Pucung 1 are very satisfied with the community service in making tabulampot.