A. Murtiyoso
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Research Interests
A. Murtiyoso has a total of 5 co-authors. Here are the top co-authors by number of shared publications:
A. H. Qureshi
Department of Civil and Environmental Engineering, Universiti Teknologi PETRONAS, 32610 Seri Iskandar, Perak Darul Ridzuan, Malaysia
1 shared publicationS. Saad
Department of Civil and Environmental Engineering, Universiti Teknologi PETRONAS, 32610 Seri Iskandar, Perak Darul Ridzuan, Malaysia
1 shared publication- Syed Jawad Hussain
Department of Computer Science, Sir Syed Case Institute of Technology, Islamabad 45230, Pakistan
1 shared publication - Vipin Kumar Oad
Faculty of Civil and Environmental Engineering, Gdańsk University of Technology, ul. Gabriela Narutowicza 11/12, 80-233 Gdańsk, Poland
1 shared publication W. S. Alaloul
Department of Civil and Environmental Engineering, Universiti Teknologi PETRONAS, 32610 Seri Iskandar, Perak Darul Ridzuan, Malaysia
1 shared publication
Latest Publications
- Open Access
- 8 December 2022
- Published by Copernicus GmbH in The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences
- Vol. XLVIII-2/W, 215-220
EVALUATION OF 3D MODEL OF REBAR FOR QUANTITATIVE PARAMETERS
The construction industry practices and processes are evolving constantly, and with the emergence of Industry 4.0, the use of technologies is expanding. Construction progress monitoring is an essential project lifecycle process; project success and timely completion are linked with effective progress monitoring operations and adopted tools. In the domain of automated construction progress monitoring, 3D modeling techniques have been studied a lot, with laser scanning and photogrammetry as two main methods. Although laser scanning provides precise and detailed 3D models, it is an expensive technology. Moreover, the literature reveals that for digitized construction progress monitoring, the major focus has been given to primary reinforced concrete (RC) structures compared to rebar. In contrast, rebar is a key element in RC structures, as structural integrity is dependent on steel reinforcement design, which makes rebar monitoring an essential activity. This study aimed to devise an automated monitoring digital-based methodology for effective and efficient onsite rebar monitoring considering quantitative parameters e.g., rebar length and rebar spacing. The developed module successfully interpreted photogrammetry-based 3D point cloud rebar model for the aforementioned parameters with an overall achieved accuracy ≥ 98%.
- 8 December 2022
- Published by Copernicus GmbH in The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences
- Vol. XLVIII-2/W, 215-220
Open AccessEVALUATION OF 3D MODEL OF REBAR FOR QUANTITATIVE PARAMETERS
The construction industry practices and processes are evolving constantly, and with the emergence of Industry 4.0, the use of technologies is expanding. Construction progress monitoring is an essential project lifecycle process; project success and timely completion are linked with effective progress monitoring operations and adopted tools. In the domain of automated construction progress monitoring, 3D modeling techniques have been studied a lot, with laser scanning and photogrammetry as two main methods. Although laser scanning provides precise and detailed 3D models, it is an expensive technology. Moreover, the literature reveals that for digitized construction progress monitoring, the major focus has been given to primary reinforced concrete (RC) structures compared to rebar. In contrast, rebar is a key element in RC structures, as structural integrity is dependent on steel reinforcement design, which makes rebar monitoring an essential activity. This study aimed to devise an automated monitoring digital-based methodology for effective and efficient onsite rebar monitoring considering quantitative parameters e.g., rebar length and rebar spacing. The developed module successfully interpreted photogrammetry-based 3D point cloud rebar model for the aforementioned parameters with an overall achieved accuracy ≥ 98%.