Chengsen Lin
Research Subjects
Chengsen Lin has a total of 5 co-authors. Here are the top co-authors by number of shared publications:
- Cong Liu
Institute of Mine Water Hazards Prevention and Controlling Technology, School of Resources and Geosciences, China University of Mining and Technology, Xuzhou 221116, China
1 shared publication - Jinkui Zhang
Institute of Mine Water Hazards Prevention and Controlling Technology, School of Resources and Geosciences, China University of Mining and Technology, Xuzhou 221116, China
1 shared publication - Wei Qiao
School of Resources and Geosciences China University of Mining and Technology Xuzhou China
1 shared publication - Weichi Chen
School of Transportation Engineering, Jiangsu Vocational University of Architectural Technology, Xuzhou 221116, China
1 shared publication - Xianggang Cheng
Institute of Mine Water Hazards Prevention and Controlling Technology, School of Resources and Geosciences, China University of Mining and Technology, Xuzhou 221116, China
1 shared publication
Latest Publications
- Open Access
Development Characteristics of a Water-Conducting Fracture Zone in Overlying Strata with Primary Fissures Induced by Coal Mining
Interconnected fractures induced by coal mining, known as water-conducting fracture zones (WCFZs), form a fractured zone where water from overlying aquifers flows into the goaf. Substantial findings have been established on the development height of WCFZs; however, these analyses have been based on intact structures or rock masses. Research on how primary fissures or other water-conducting structures influence the development of WCFZs remains limited. The mining seam of the Gaojiapu Coal Mine in the Ordos Basin, China, is overlaid by a gigantic and highly confined Cretaceous aquifer. Additionally, the primary fissures of the overlying strata are highly developed. Geophysical inversion of the primary fissures and vertical and horizontal drilling were undertaken in order to systematically investigate the characteristics of WCFZ development in the overlying strata. The results show that a dense network of primary fissures is connected with the middle and lower Cretaceous aquifer developed in Mining Zone 1. These fissures are prone to connecting with mining-induced fractures to form the highly developed WCFZs observed and verified in this study. A grouting engineering approach was adopted at the Gaojiapu Coal Mine to block the primary fissures in advance, as this can effectively control the abnormal development of the WCFZs and decrease the discharge of mine water, ultimately protecting the water resources of the Cretaceous aquifer. Our research clarifies the significant role of primary fissures in the development of water-conducting fracture zones, and provides important theoretical guidance for the accurate prediction and prevention of mine roof water hazards in areas with similar mining conditions.
Open AccessDevelopment Characteristics of a Water-Conducting Fracture Zone in Overlying Strata with Primary Fissures Induced by Coal Mining
Interconnected fractures induced by coal mining, known as water-conducting fracture zones (WCFZs), form a fractured zone where water from overlying aquifers flows into the goaf. Substantial findings have been established on the development height of WCFZs; however, these analyses have been based on intact structures or rock masses. Research on how primary fissures or other water-conducting structures influence the development of WCFZs remains limited. The mining seam of the Gaojiapu Coal Mine in the Ordos Basin, China, is overlaid by a gigantic and highly confined Cretaceous aquifer. Additionally, the primary fissures of the overlying strata are highly developed. Geophysical inversion of the primary fissures and vertical and horizontal drilling were undertaken in order to systematically investigate the characteristics of WCFZ development in the overlying strata. The results show that a dense network of primary fissures is connected with the middle and lower Cretaceous aquifer developed in Mining Zone 1. These fissures are prone to connecting with mining-induced fractures to form the highly developed WCFZs observed and verified in this study. A grouting engineering approach was adopted at the Gaojiapu Coal Mine to block the primary fissures in advance, as this can effectively control the abnormal development of the WCFZs and decrease the discharge of mine water, ultimately protecting the water resources of the Cretaceous aquifer. Our research clarifies the significant role of primary fissures in the development of water-conducting fracture zones, and provides important theoretical guidance for the accurate prediction and prevention of mine roof water hazards in areas with similar mining conditions.