Agung Kristiawan
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Agung Kristiawan has a total of 8 co-authors. Here are the top co-authors by number of shared publications:
- Lintang Enggartiasto
Universitas PGRI Semarang
2 shared publications - Putri Anggi Permata Suwandi
Universitas PGRI Semarang
2 shared publications Adinda Sillvy Septiani
1 shared publication- Ahmad Fadhil Yusof
Faculty of Computing Senior Lecturer Universiti Teknologi Malaysia Johor Baharu 81310 Johor Malaysia
1 shared publication Ahmad Qohhar
Universitas PGRI Semarang
1 shared publication- Ibnu Toto Husodo1 shared publication
Latest Publications
- Open Access
- 14 November 2026
- Published by Universitas PGRI Semarang in International Journal of Sustainable Building, Infrastructure and Environment (IJOSBIE)
- Vol. 7 (2) , 53-57
Implementation Analysis of Quality Control (QC) and Health, Safety, and Environment (HSE) Integration in The Pembangunan Bangunan Gedung dan Kawasan Kantor Kementerian Koordinator 4 IKN
The construction of government office buildings in Indonesia’s New Capital City (IKN) involves complex activities that require effective quality management and occupational safety systems to ensure project success. In large-scale construction projects, deficiencies in quality control may lead to rework, delays, and increased costs, while inadequate safety management can result in workplace accidents and reduced productivity. Therefore, the integration of Quality Control (QC) and Health, Safety, and Environment (HSE) systems has become an important strategy for improving overall project performance. This study aims to analyze the implementation of integrated QC and HSE systems in the Construction of the Coordinating Ministry Office Complex Project (Kemenko 4) at IKN and evaluate their contribution to project performance improvement. The research employed a quantitative descriptive case-study approach using questionnaires, interviews, field observations, and project documentation reviews. Data were collected from project personnel, including project managers, QC engineers, HSE officers, supervisors, and construction workers, and analyzed using descriptive statistical methods. The results indicate that the implementation of integrated QC–HSE practices has been effectively carried out through joint inspections, integrated standard operating procedures, coordinated reporting systems, routine safety monitoring, and strong management commitment. The integration contributed to improved construction quality, reduced potential safety risks, enhanced communication and coordination among project stakeholders, increased workforce awareness, minimized duplication of activities, and improved operational efficiency. The study concludes that QC–HSE integration provides significant benefits in supporting project quality performance, occupational safety performance, and sustainable construction management, particularly in large-scale government infrastructure projects.
- 14 November 2026
- Published by Universitas PGRI Semarang in International Journal of Sustainable Building, Infrastructure and Environment (IJOSBIE)
- Vol. 7 (2) , 53-57
Open AccessImplementation Analysis of Quality Control (QC) and Health, Safety, and Environment (HSE) Integration in The Pembangunan Bangunan Gedung dan Kawasan Kantor Kementerian Koordinator 4 IKN
The construction of government office buildings in Indonesia’s New Capital City (IKN) involves complex activities that require effective quality management and occupational safety systems to ensure project success. In large-scale construction projects, deficiencies in quality control may lead to rework, delays, and increased costs, while inadequate safety management can result in workplace accidents and reduced productivity. Therefore, the integration of Quality Control (QC) and Health, Safety, and Environment (HSE) systems has become an important strategy for improving overall project performance. This study aims to analyze the implementation of integrated QC and HSE systems in the Construction of the Coordinating Ministry Office Complex Project (Kemenko 4) at IKN and evaluate their contribution to project performance improvement. The research employed a quantitative descriptive case-study approach using questionnaires, interviews, field observations, and project documentation reviews. Data were collected from project personnel, including project managers, QC engineers, HSE officers, supervisors, and construction workers, and analyzed using descriptive statistical methods. The results indicate that the implementation of integrated QC–HSE practices has been effectively carried out through joint inspections, integrated standard operating procedures, coordinated reporting systems, routine safety monitoring, and strong management commitment. The integration contributed to improved construction quality, reduced potential safety risks, enhanced communication and coordination among project stakeholders, increased workforce awareness, minimized duplication of activities, and improved operational efficiency. The study concludes that QC–HSE integration provides significant benefits in supporting project quality performance, occupational safety performance, and sustainable construction management, particularly in large-scale government infrastructure projects.
- Open Access
- 14 November 2026
- Published by Universitas PGRI Semarang in International Journal of Sustainable Building, Infrastructure and Environment (IJOSBIE)
- Vol. 7 (2) , 34-42
COMPARATIVE ANALYSIS OF QUANTITY TAKE OFF CALCULATIONS FOR STRUCTURAL WORK USING BIM AND CONVENTIONAL METHODS
Quantity Take Off (QTO) accuracy is essential for effective material estimation and project cost control, particularly for pilecap structures with complex reinforcement configurations. This study compares the accuracy of reinforcement and concrete quantities, as well as processing time, between Building Information Modeling (BIM) and conventional QTO methods using three categories of pilecap in the Solo-Yogyakarta-NYIA Kulon Progo Toll Road Project, Package 2.2B Trihanggo-Junction Sleman (STA 54+635 to STA 57+839). The BIM based method employed Autodesk Revit for three dimensional modeling and automatic quantity extraction, while the conventional method used AutoCAD and Microsoft Excel for manual calculations. The results revealed minimal differences in reinforcement (0.677%) and concrete volume (0.014%), indicating a very high level of agreement between both methods. However, the BIM based method required substantially longer processing time due to the additional three dimensional modeling process. These findings indicate that the primary distinction between the two methods lies in the QTO preparation process rather than the resulting material quantities.
- 14 November 2026
- Published by Universitas PGRI Semarang in International Journal of Sustainable Building, Infrastructure and Environment (IJOSBIE)
- Vol. 7 (2) , 34-42
Open AccessCOMPARATIVE ANALYSIS OF QUANTITY TAKE OFF CALCULATIONS FOR STRUCTURAL WORK USING BIM AND CONVENTIONAL METHODS
Quantity Take Off (QTO) accuracy is essential for effective material estimation and project cost control, particularly for pilecap structures with complex reinforcement configurations. This study compares the accuracy of reinforcement and concrete quantities, as well as processing time, between Building Information Modeling (BIM) and conventional QTO methods using three categories of pilecap in the Solo-Yogyakarta-NYIA Kulon Progo Toll Road Project, Package 2.2B Trihanggo-Junction Sleman (STA 54+635 to STA 57+839). The BIM based method employed Autodesk Revit for three dimensional modeling and automatic quantity extraction, while the conventional method used AutoCAD and Microsoft Excel for manual calculations. The results revealed minimal differences in reinforcement (0.677%) and concrete volume (0.014%), indicating a very high level of agreement between both methods. However, the BIM based method required substantially longer processing time due to the additional three dimensional modeling process. These findings indicate that the primary distinction between the two methods lies in the QTO preparation process rather than the resulting material quantities.
- Open Access
- 26 February 2026
- Published by Atlantis Press SARL
- p. 314-325
The Social Science Dimension: Civil Engineers, Plastic-based Paving Blocks, and the Circular Economy in Indonesia
- 26 February 2026
- Published by Atlantis Press SARL
- p. 314-325
Open AccessThe Social Science Dimension: Civil Engineers, Plastic-based Paving Blocks, and the Circular Economy in Indonesia