Fei Zhang
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Fei Zhang has a total of 9 co-authors. Here are the top co-authors by number of shared publications:
Fugang Huang
Sichuan Provincial Engineering Research Center of High Efficiency Power Converter Technology, Chengdu, China
1 shared publicationLei Bai
Sichuan Provincial Engineering Research Center of High Efficiency Power Converter Technology, Chengdu, China
1 shared publication- Ping Yang
School of Electrical Engineering Southwest Jiaotong University Chengdu China
1 shared publication - Shaocong Jin
School of Electrical Engineering, Southwest Jiaotong University, Chengdu, China
1 shared publication - Xi Chen
School of Electrical Engineering, Southwest Jiaotong University, Chengdu, China
1 shared publication - Yong Li
School of Electrical Engineering, Southwest Jiaotong University, Chengdu, China
1 shared publication
Latest Publications
- 6 May 2026
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Journal of Emerging and Selected Topics in Power Electronics
- Vol. PP (21686777) , 1
Parameter-Optimization-Based Maximum Power Reaching for Magnetic Field Energy Harvesters Connected to Buck Converter
Magnetic field energy harvesters (MFEHs) have emerged as a promising power supply method for online monitoring devices. However, under low current conditions, the magnetic field weakens, presenting challenges such as unstable supply voltage and insufficient power. To improve the adaptability of the MFEH to low currents and enable it to operate stably under such conditions, it is essential for the MFEH to operate near the maximum power point (MPP). To address this vital problem, an MPP reaching method based on parameter optimization is proposed in this work, which can be used to improve the performance of the MFEH. Specifically, the operating characteristics of the MFEH and the startup process of the Buck converter are analyzed. Subsequently, a parameter optimization method is developed, which ensures the simultaneous achievement of constant voltage (CV) output and MPP reaching. An experimental prototype is constructed to verify the effectiveness of the proposal. Experimental results demonstrate that the startup process of the Buck converter is consistent with the theoretical analysis. Furthermore, by adopting the parameter optimization method, the output power is improved at different currents, thereby reducing the current required at the rated power. Under a power requirement of 1 W, compared to N = 70 and N = 210, the required current in the case of N = 140 decreases from 36.3 A and 22.0 A to 20.8 A, representing reductions of 42.7% and 5.5%, respectively. For a power requirement of 3.5 W, the required current decreases from 88.3 A and 66.0 A to 57.0 A, with reductions of 35.4% and 13.6%, respectively.
- 6 May 2026
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Journal of Emerging and Selected Topics in Power Electronics
- Vol. PP (21686777) , 1
Parameter-Optimization-Based Maximum Power Reaching for Magnetic Field Energy Harvesters Connected to Buck Converter
Magnetic field energy harvesters (MFEHs) have emerged as a promising power supply method for online monitoring devices. However, under low current conditions, the magnetic field weakens, presenting challenges such as unstable supply voltage and insufficient power. To improve the adaptability of the MFEH to low currents and enable it to operate stably under such conditions, it is essential for the MFEH to operate near the maximum power point (MPP). To address this vital problem, an MPP reaching method based on parameter optimization is proposed in this work, which can be used to improve the performance of the MFEH. Specifically, the operating characteristics of the MFEH and the startup process of the Buck converter are analyzed. Subsequently, a parameter optimization method is developed, which ensures the simultaneous achievement of constant voltage (CV) output and MPP reaching. An experimental prototype is constructed to verify the effectiveness of the proposal. Experimental results demonstrate that the startup process of the Buck converter is consistent with the theoretical analysis. Furthermore, by adopting the parameter optimization method, the output power is improved at different currents, thereby reducing the current required at the rated power. Under a power requirement of 1 W, compared to N = 70 and N = 210, the required current in the case of N = 140 decreases from 36.3 A and 22.0 A to 20.8 A, representing reductions of 42.7% and 5.5%, respectively. For a power requirement of 3.5 W, the required current decreases from 88.3 A and 66.0 A to 57.0 A, with reductions of 35.4% and 13.6%, respectively.
- 27 March 2026
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Industrial Electronics
- Vol. PP (02780046) , 1-13
A New Active Capacitor-Embedded Pulsed Load Power Supply for Pulsed Power Suppression
Since the periodic pulsed power is a strong disturbance to the power system, the pulsed power must be suppressed by the pulsed load power supply (PLPS). In general, an additional converter with a storage capacitor is formed as the active capacitor in the original PLPS to reduce storage capacitance and achieve pulsed power decoupling. However, since the introduction of additional converters, the existing PLPS still faces high power loss, large volume, more components, etc. In this article, an active capacitor unit is proposed to be embedded in the original converter to form a new pulsed power suppression topology, in which only two switches and one storage capacitor are introduced to establish an energy storage port with bidirectional power flow characteristics. By doing so, the active capacitor-embedded PLPS (ACE-PLPS) can be developed, which features a compact structure and fewer components. Furthermore, the process of pulsed power decoupling is integrated into the switching states, resulting in a significant reduction in power loss. The implementation topology and control scheme are presented. Design guidelines are also developed. The effectiveness and feasibility of the ACE-PLPS are validated by the experimental results.
- 27 March 2026
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Industrial Electronics
- Vol. PP (02780046) , 1-13
A New Active Capacitor-Embedded Pulsed Load Power Supply for Pulsed Power Suppression
Since the periodic pulsed power is a strong disturbance to the power system, the pulsed power must be suppressed by the pulsed load power supply (PLPS). In general, an additional converter with a storage capacitor is formed as the active capacitor in the original PLPS to reduce storage capacitance and achieve pulsed power decoupling. However, since the introduction of additional converters, the existing PLPS still faces high power loss, large volume, more components, etc. In this article, an active capacitor unit is proposed to be embedded in the original converter to form a new pulsed power suppression topology, in which only two switches and one storage capacitor are introduced to establish an energy storage port with bidirectional power flow characteristics. By doing so, the active capacitor-embedded PLPS (ACE-PLPS) can be developed, which features a compact structure and fewer components. Furthermore, the process of pulsed power decoupling is integrated into the switching states, resulting in a significant reduction in power loss. The implementation topology and control scheme are presented. Design guidelines are also developed. The effectiveness and feasibility of the ACE-PLPS are validated by the experimental results.