Ahmed Abd El-Rady Okasha
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Ahmed Abd El-Rady Okasha has a total of 4 co-authors. Here are the top co-authors by number of shared publications:
- Ahmed Hammad
Construction Engineering and Management, Department of Civil and Environmental Engineering, University of Alberta, Edmonton, AB T6G 2R3, Canada
1 shared publication Amir Arafa
Administrative Control Authority, Cairo, Egypt
1 shared publication- Mohammad Masfiqul Alam Bhuiyan
University of Alberta
1 shared publication Nabil Amer
Department of Civil Engineering, Military Technical College
1 shared publication
Latest Publications
- Open Access
- 6 April 2026
- Published by MDPI AG in Sustainability
- Vol. 18 (7) , 3569
An Integrated Framework for Balancing Workload and Capacity in Project-Based Organizations Using System Dynamics
Project-based organizations (PBOs) face persistent challenges in managing workload fluctuations that influence performance, competitiveness, and resource sustainability. Although previous research has explored bidding strategies and project inflows and outflows, few studies have systematically modeled workload-capacity dynamics or assessed policy responses to manage them effectively. To address this gap, this study develops a system dynamics (SD) model that integrates both pre-award and post-award project phases with internal and external organizational processes. Data for model development were drawn from the literature, industry reports, and expert interviews, resulting in the identification of 28 variables organized into subsystems covering demand, capacity planning, work execution, competitiveness, and financial performance. The model was validated through dimensional and structural tests, expert review, and further examined using social network analysis (SNA) and sensitivity analysis. The SNA results identified workload, production rate, and organizational capacity as the most influential variables. Sensitivity analysis conducted through Monte Carlo experiments, employing screening, regression, and ANOVA (analysis of variance) methods, revealed that capacity adjustment flexibility, minimum capacity, and demand level are critical factors influencing organizational stability. The validated model was then applied to evaluate policy alternatives under two distinct market conditions. Findings indicate that in lowest-price environments, a competitive, market-share-oriented policy enhances utilization and responsiveness, whereas in average-price markets, a stable capacity policy yields more sustainable outcomes. These results demonstrate how project-based organizations can strategically adjust bidding and capacity policies to stabilize workload dynamics and improve long-term operational resilience under different market conditions. The study contributes theoretically by extending the application of SD modeling to workload-capacity management in PBOs and contributes practically by offering a decision-support tool that helps managers assess capacity strategies, reduce risks, and align organizational policies with long-term sustainability objectives.
- 6 April 2026
- Published by MDPI AG in Sustainability
- Vol. 18 (7) , 3569
Open AccessAn Integrated Framework for Balancing Workload and Capacity in Project-Based Organizations Using System Dynamics
Project-based organizations (PBOs) face persistent challenges in managing workload fluctuations that influence performance, competitiveness, and resource sustainability. Although previous research has explored bidding strategies and project inflows and outflows, few studies have systematically modeled workload-capacity dynamics or assessed policy responses to manage them effectively. To address this gap, this study develops a system dynamics (SD) model that integrates both pre-award and post-award project phases with internal and external organizational processes. Data for model development were drawn from the literature, industry reports, and expert interviews, resulting in the identification of 28 variables organized into subsystems covering demand, capacity planning, work execution, competitiveness, and financial performance. The model was validated through dimensional and structural tests, expert review, and further examined using social network analysis (SNA) and sensitivity analysis. The SNA results identified workload, production rate, and organizational capacity as the most influential variables. Sensitivity analysis conducted through Monte Carlo experiments, employing screening, regression, and ANOVA (analysis of variance) methods, revealed that capacity adjustment flexibility, minimum capacity, and demand level are critical factors influencing organizational stability. The validated model was then applied to evaluate policy alternatives under two distinct market conditions. Findings indicate that in lowest-price environments, a competitive, market-share-oriented policy enhances utilization and responsiveness, whereas in average-price markets, a stable capacity policy yields more sustainable outcomes. These results demonstrate how project-based organizations can strategically adjust bidding and capacity policies to stabilize workload dynamics and improve long-term operational resilience under different market conditions. The study contributes theoretically by extending the application of SD modeling to workload-capacity management in PBOs and contributes practically by offering a decision-support tool that helps managers assess capacity strategies, reduce risks, and align organizational policies with long-term sustainability objectives.
- Open Access
- 1 September 2019
- Published by Egyptian Knowledge Bank in Journal of Engineering Science and Military Technologies
- Vol. 3 (1) , 42-51
SI model of measuring the success of strategies and decisions in construction projects using system dynamics
This paper uses system dynamics (SD) approach to predict and measure construction projects strategies and decisions success. SD model captures construction projects design phase processes using VENSIM software to simulate policies used. The model is validated by comparing results for the base case of Love, Edwards et al. 2008 model. Two scenarios are proposed to overcome owner changes. These changes are minimizing project schedule from 45 to 25 weeks. Polices used to overcome these changes are: 1- assign overtime to the available designers to increase the work output (one designer work more than one shift); 2- assign more experienced designers to work without assigning overtime to these designers (increase the available designers but the designer work only one shift). The SI model is developed to compare between these two scenarios. Two-round Delphi questionnaire are used for data gathering to build structure index (SI) model that represent measure of project success. Four success parameters; time, cost, quality, and Client’s Satisfaction; are used to formulate a success measure index for construction projects. This helps in indexing the success of finished projects in order to compare with each other. Also, using the proposed SI model with SD helps in measuring organization strategy success. And, help decision makers to assess their decisions. The results show that more designers assigned to finish the work in time (i.e. scenario two) is better than scenario one (i.e. better than working overtime that leads to more rework and increases the cost).
- 1 September 2019
- Published by Egyptian Knowledge Bank in Journal of Engineering Science and Military Technologies
- Vol. 3 (1) , 42-51
Open AccessSI model of measuring the success of strategies and decisions in construction projects using system dynamics
This paper uses system dynamics (SD) approach to predict and measure construction projects strategies and decisions success. SD model captures construction projects design phase processes using VENSIM software to simulate policies used. The model is validated by comparing results for the base case of Love, Edwards et al. 2008 model. Two scenarios are proposed to overcome owner changes. These changes are minimizing project schedule from 45 to 25 weeks. Polices used to overcome these changes are: 1- assign overtime to the available designers to increase the work output (one designer work more than one shift); 2- assign more experienced designers to work without assigning overtime to these designers (increase the available designers but the designer work only one shift). The SI model is developed to compare between these two scenarios. Two-round Delphi questionnaire are used for data gathering to build structure index (SI) model that represent measure of project success. Four success parameters; time, cost, quality, and Client’s Satisfaction; are used to formulate a success measure index for construction projects. This helps in indexing the success of finished projects in order to compare with each other. Also, using the proposed SI model with SD helps in measuring organization strategy success. And, help decision makers to assess their decisions. The results show that more designers assigned to finish the work in time (i.e. scenario two) is better than scenario one (i.e. better than working overtime that leads to more rework and increases the cost).