Hongyan Xu
Hongyan Xu has a total of 6 co-authors. Here are the top co-authors by number of shared publications:
- Dasong Zhang
School of Geology and Mining Engineering, Xinjiang University, Urumqi 830047, China
1 shared publication - Fei Gao
School of Geology and Mining Engineering, Xinjiang University, Urumqi 830047, China
1 shared publication - Hui Chen
School of Geology and Mining Engineering, Xinjiang University, Urumqi 830047, China
1 shared publication - Huijie Zhai
School of Geology and Mining Engineering, Xinjiang University, Urumqi 830047, China
1 shared publication - Jinggang Zhang
Xinjiang Xuefeng Blasting Engineering Co., Ltd., Urumqi 830047, China
1 shared publication - Yuanxiang Mu
School of Geology and Mining Engineering, Xinjiang University, Urumqi 830047, China
1 shared publication
Latest Publications
- Open Access
- 9 April 2026
- Published by MDPI AG in Applied Sciences
- Vol. 16 (8) , 3665
Study on Near-Field Spectral Characteristics and Vibration Control of Multi-Hole Blasting Based on VMD
To explore the spectral characteristics of near-field vibration signals from multi-hole millisecond-delay blasting in open-pit mines and the modulation effect of delay time on blasting energy distribution, field blasting vibration tests with multi-gradient delays were conducted taking an open-pit coal mine in Xinjiang as the engineering background. Particle Swarm Optimization (PSO) optimized Variational Mode Decomposition (VMD) and Hilbert-Huang Transform (HHT) were introduced for the refined processing and frequency band energy ratio analysis of the measured signals, and field vibration control tests were subsequently carried out. The results show that compared with the traditional Empirical Mode Decomposition (EMD), the PSO-optimized VMD can effectively overcome the mode aliasing phenomenon. By extracting the high-frequency Intrinsic Mode Function (IMF7) that characterizes the instantaneous detonation impulse, the actual delay time was successfully inverted to be 10.47 ms. The inter-hole delay time significantly affects the time-frequency distribution of vibration energy. Under the 25 ms delay condition, the energy ratio of the high-frequency band is the highest, and the low-frequency energy accumulation degree is the lowest, which is most conducive to shortening the vibration duration and accelerating energy attenuation. Control tests further confirmed that adopting a 17 ms delay in the near-slope area can effectively control the peak particle velocity (PPV) in the near field, while adopting a 23 ms delay in the middle and far areas can further reduce the low-frequency energy concentration. The research results demonstrate a dynamic matching strategy for millisecond delays based on spatial distance differences, which has important guiding significance for realizing safe and efficient blasting vibration control in open-pit mines.
- 9 April 2026
- Published by MDPI AG in Applied Sciences
- Vol. 16 (8) , 3665
Open AccessStudy on Near-Field Spectral Characteristics and Vibration Control of Multi-Hole Blasting Based on VMD
To explore the spectral characteristics of near-field vibration signals from multi-hole millisecond-delay blasting in open-pit mines and the modulation effect of delay time on blasting energy distribution, field blasting vibration tests with multi-gradient delays were conducted taking an open-pit coal mine in Xinjiang as the engineering background. Particle Swarm Optimization (PSO) optimized Variational Mode Decomposition (VMD) and Hilbert-Huang Transform (HHT) were introduced for the refined processing and frequency band energy ratio analysis of the measured signals, and field vibration control tests were subsequently carried out. The results show that compared with the traditional Empirical Mode Decomposition (EMD), the PSO-optimized VMD can effectively overcome the mode aliasing phenomenon. By extracting the high-frequency Intrinsic Mode Function (IMF7) that characterizes the instantaneous detonation impulse, the actual delay time was successfully inverted to be 10.47 ms. The inter-hole delay time significantly affects the time-frequency distribution of vibration energy. Under the 25 ms delay condition, the energy ratio of the high-frequency band is the highest, and the low-frequency energy accumulation degree is the lowest, which is most conducive to shortening the vibration duration and accelerating energy attenuation. Control tests further confirmed that adopting a 17 ms delay in the near-slope area can effectively control the peak particle velocity (PPV) in the near field, while adopting a 23 ms delay in the middle and far areas can further reduce the low-frequency energy concentration. The research results demonstrate a dynamic matching strategy for millisecond delays based on spatial distance differences, which has important guiding significance for realizing safe and efficient blasting vibration control in open-pit mines.