NANkechinyere Regina Anozie

Nkechinyere Regina Anozie

*This is an algorithmically generated author record based on publicly available information.

Nkechinyere Regina Anozie has a total of 7 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Influence of Cost and Time of Transportation on Business Performance of Multinational Organisations in Nigeria

    by Babatope Gabriel Oni, Tayo Moses Adebayo, Nkechinyere Regina Anozie, Araoye Olarinkoye Ajiboye, Oluwafemi Adeniyi Oluwakoya

    The goal of this study is to demonstrate how transportation costs and time affect multinational business organisations by assessing how freight clearance variables (cost and time) and inland transport factors (cost and distance) affect the financial performance (sales costs and turnover) of multinational organisations in Lagos and Ogun states, Nigeria. The study utilised a questionnaire survey for primary data collection, while secondary data was sourced from the annual reports of the sampled firms. The study focuses on eight manufacturing organisations selected from listed companies between 2010 and 2019 that regularly transport goods via the maritime mode of transport. The study employs SPSS to perform multiple regressions on the eight manufacturing organisations and finds that freight clearance variables (cost and time) have a negative impact on sales costs between 2010 and 2019, while inland transport factors (cost and distance) have a positive effect. Furthermore, the research demonstrates that whereas freight clearance variables (cost and time) have negative effects on turnover, inland transport variables (cost and distance) have positive effects. The study indicates that minimising freight clearance costs and time could significantly enhance the performance of Nigeria's multinational business organisations. Similarly, reducing inland transport costs and adjusting port-business time can significantly improve Nigerian businesses' performance.

  • Open Access

    Evaluation of the Construction Logistics Challenges in Minna, Niger State, Nigeria

    by Araoye Olarinkoye Ajiboye, Muhammed Etudaiye Ohida, Regina Nkechinyere Anozie, Kola Abimbola Ayankunle, Rachel Auza Ibrahim

    Building construction projects have faced numerous obstacles throughout the years, which may be related to logistics problems such as lack of access to procured resources, material shortages, and insufficient transportation infrastructures, among other things. This difficulty has led to inefficiency in the building construction project, which may result in abandonment. For these reasons, the study evaluated the logistics challenges of building constructions in Minna Metropolis, Nigeria. The study utilised a descriptive research design to report the features of the study population. Two hundred questionnaires were purposefully distributed among employees in the building construction sites in Minna using simple random techniques. The theories of constraints and the institutional and resource-based view were adopted in this article. The collated data was analysed using descriptive statistics (i.e., mean, charts, percentages and frequencies), whereas T-test statistics were used to test the hypothesis. The results show that the logistics challenges faced by workers in the building construction industry in Minna, among others, include damages to the construction materials due to inadequate space in the site, Construction materials being delivered late, material shortage due to poor order, Construction materials are delivered far from the site due to inadequate access and the challenges of poor transport infrastructure. In addition, the hypothesis tested shows statistical significance among the workers' perceptions of the construction logistics challenges in the building construction projects in Minna. The study concluded that the inability of the players involved in the construction industry to manage these challenges adequately would result in poor labour productivity in the building construction industry. The study suggests, among others, that contractors or building owners should establish adequate communication with the suppliers of construction materials to ensure timely delivery of construction materials.