Department of Electrical Systems, CIRCE Technology Centre, 50018 Zaragoza, Spain
2 shared publications - Alberto Júlio Tsamba
Energy Research Centre (CPE), Eduardo Mondlane University, Av. Julius Nyerere 3453, Maputo 1100, Mozambique
2 shared publications - Francesco Roncallo
Engreen Srl, Via Elio Vittorini 103, 00144 Rome, Italy
2 shared publications - Gilberto Mahumane
Energy Research Centre (CPE), Eduardo Mondlane University, Av. Julius Nyerere 3453, Maputo 1100, Mozambique
2 shared publications - Gregorio Fernández
Department of Electrical Systems, CIRCE Technology Centre, 50018 Zaragoza, Spain
2 shared publications - Mario Mihetec
Faculty of Mechanical Engineering and Naval Architecture, University of Zagreb, Ivana Lucica 5, 10000 Zagreb, Croatia
2 shared publications
Latest Publications
- Open Access
- 18 June 2026
- Published by MDPI AG in Electricity
- Vol. 7 (2) , 57
Multi-Objective BESS Siting and Sizing via NSGA-II and PTDF-Constrained DC Optimal Power Flow: Application to the Mali Transmission Network
Weak grid infrastructure and the absence of flexible storage are among the principal barriers to reliable, low-carbon energy access in sub-Saharan transmission systems. This paper proposes a hierarchical multi-objective framework for the optimal siting and sizing of battery energy storage systems (BESSs), applied to the 130-bus Mali transmission network within the EMERGE project. The upper level employs NSGA-II to simultaneously maximize daily price arbitrage revenue and minimize active power losses; the lower level solves a network-constrained DC optimal power flow with thermal branch limits enforced as hard linear inequalities via the Power Transfer Distribution Factor (PTDF) matrix. Over 500 generations, the framework identifies Bus 91 (SIRAKORO II, 150 kV) as the dominant storage location, achieving a maximum daily revenue of approximately €10,033 at a marginal loss increment of MWh. The resulting Pareto front gives Mali system planners a quantitative tool for trading off private investment returns against grid-level environmental impact, demonstrating that rigorous network-constrained BESS planning is technically tractable and economically viable in the resource-constrained context of sub-Saharan energy transitions.- 18 June 2026
- Published by MDPI AG in Electricity
- Vol. 7 (2) , 57
Open AccessMulti-Objective BESS Siting and Sizing via NSGA-II and PTDF-Constrained DC Optimal Power Flow: Application to the Mali Transmission Network
Weak grid infrastructure and the absence of flexible storage are among the principal barriers to reliable, low-carbon energy access in sub-Saharan transmission systems. This paper proposes a hierarchical multi-objective framework for the optimal siting and sizing of battery energy storage systems (BESSs), applied to the 130-bus Mali transmission network within the EMERGE project. The upper level employs NSGA-II to simultaneously maximize daily price arbitrage revenue and minimize active power losses; the lower level solves a network-constrained DC optimal power flow with thermal branch limits enforced as hard linear inequalities via the Power Transfer Distribution Factor (PTDF) matrix. Over 500 generations, the framework identifies Bus 91 (SIRAKORO II, 150 kV) as the dominant storage location, achieving a maximum daily revenue of approximately €10,033 at a marginal loss increment of MWh. The resulting Pareto front gives Mali system planners a quantitative tool for trading off private investment returns against grid-level environmental impact, demonstrating that rigorous network-constrained BESS planning is technically tractable and economically viable in the resource-constrained context of sub-Saharan energy transitions. - Open Access
- 12 May 2026
- Published by MDPI AG in Preprints.org
Multi-Objective BESS Siting and Sizing via NSGA-II and PTDF-Constrained DC Optimal Power Flow: Application to the Mali Transmission Network
Expanding renewable energy capacity in sub-Saharan transmission systems is a cornerstone of sustainable development, yet weak grid infrastructure and the absence of flexible storage remain principal barriers to reliable and low-carbon energy access. This paper addresses the economic and environmental dimensions of that challenge by proposing a hierarchical multi-objective framework for the optimal siting and sizing of Battery Energy Storage Systems (BESS), applied to the 130-bus Mali transmission network within the EMERGE project. The upper level employs the NSGA-II evolutionary algorithm to simultaneously maximize daily price-arbitrage revenue—the economic sustainability indicator—and minimize active power losses—the environmental efficiency indicator. For each candidate design, the lower level solves a multi-period DC Optimal Power Flow (DC-OPF) via CasADi/IPOPT, with thermal branch constraints embedded as hard linear inequalities through the Power Transfer Distribution Factor (PTDF) matrix, and voltage-corrected loss estimates recovered via a vectorized Extended DC Power Flow (EDCPF) model. Over 500 NSGA-II generations, the framework identifies Bus 91 (SIRAKORO II, 150 kV) as the dominant storage location, achieving maximum daily revenue of approximately € 10,033 at a marginal loss increment of 6.7×10−3 MWh. The Pareto front provides Mali system planners with a quantitative tool for balancing private investment returns against grid-level environmental impact, demonstrating that rigorous network-constrained BESS planning is both technically tractable and economically viable in the resource-constrained context of sub-Saharan sustainable energy transitions.
- 12 May 2026
- Published by MDPI AG in Preprints.org
Open AccessMulti-Objective BESS Siting and Sizing via NSGA-II and PTDF-Constrained DC Optimal Power Flow: Application to the Mali Transmission Network
Expanding renewable energy capacity in sub-Saharan transmission systems is a cornerstone of sustainable development, yet weak grid infrastructure and the absence of flexible storage remain principal barriers to reliable and low-carbon energy access. This paper addresses the economic and environmental dimensions of that challenge by proposing a hierarchical multi-objective framework for the optimal siting and sizing of Battery Energy Storage Systems (BESS), applied to the 130-bus Mali transmission network within the EMERGE project. The upper level employs the NSGA-II evolutionary algorithm to simultaneously maximize daily price-arbitrage revenue—the economic sustainability indicator—and minimize active power losses—the environmental efficiency indicator. For each candidate design, the lower level solves a multi-period DC Optimal Power Flow (DC-OPF) via CasADi/IPOPT, with thermal branch constraints embedded as hard linear inequalities through the Power Transfer Distribution Factor (PTDF) matrix, and voltage-corrected loss estimates recovered via a vectorized Extended DC Power Flow (EDCPF) model. Over 500 NSGA-II generations, the framework identifies Bus 91 (SIRAKORO II, 150 kV) as the dominant storage location, achieving maximum daily revenue of approximately € 10,033 at a marginal loss increment of 6.7×10−3 MWh. The Pareto front provides Mali system planners with a quantitative tool for balancing private investment returns against grid-level environmental impact, demonstrating that rigorous network-constrained BESS planning is both technically tractable and economically viable in the resource-constrained context of sub-Saharan sustainable energy transitions.