Erhan Demirok
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Erhan Demirok has a total of 6 co-authors. Here are the top co-authors by number of shared publications:
- Aydin Akan
Department of Electrical and Electronics Engineering, Izmir University of Economics, 35330 Izmir, Türkiye
1 shared publication - Elias Ouedraogo
Department of Electrical Engineering, Izmir University of Economics, Izmir 35330, Türkiye
1 shared publication - Ibrahim Alisar
Department of Electrical and Electronics Engineering, Izmir University of Economics, Sakarya Cd. No:156, Balcova, Izmir 35330, Türkiye
1 shared publication - Kiswendsida Elias Ouedraogo
İzmir University of Economics
1 shared publication - Pinar Oguz Ekim
Department of Electrical Engineering, Izmir University of Economics, Izmir 35330, Türkiye
1 shared publication - Pınar Oğuz Eki̇m
İzmir University of Economics
1 shared publication
Latest Publications
- Open Access
Multi-Terminal Smart Soft Open Point for Reinforcement Deferral in Low-Voltage Networks Under Sudden Load Growth and Transport Electrification
Rapid electric vehicle adoption can create severe voltage, loading, and service-continuity constraints in low-voltage networks when demand growth is spatially uneven. This study evaluates a multi-terminal Smart Soft Open Point (SOP) framework for reinforcement deferral using a modified 47-bus CIGRE low-voltage benchmark and 8760-h nonlinear AC optimization. The principal case combines 1.5 times base demand with 200 electric vehicles and compares the existing benchmark network (BMK), Smart SOP, and conventional grid reinforcement (GRU). Smart SOP coordinates bidirectional active-power exchange, capacitive reactive support, and feeder-level served-load variables. It reduces annual energy not served from 15.36% to 3.72%, mean load-balancing index from 23.57% to 11.96%, and hours with more than 5% service reduction from 7059 to 2670. GRU nearly eliminates energy not served (0.04%) and provides the strongest voltage performance, but at substantially higher annual system cost. Capacity sensitivity shows diminishing returns beyond the baseline 402 kVA SOP rating, while Monte Carlo load uncertainty gives Smart SOP the highest median annual net value. The results indicate that Smart SOP can provide a lower-capital alternative to conventional reinforcement for concentrated electrification-driven growth while preserving substantially more service than the unreinforced network.
Open AccessMulti-Terminal Smart Soft Open Point for Reinforcement Deferral in Low-Voltage Networks Under Sudden Load Growth and Transport Electrification
Rapid electric vehicle adoption can create severe voltage, loading, and service-continuity constraints in low-voltage networks when demand growth is spatially uneven. This study evaluates a multi-terminal Smart Soft Open Point (SOP) framework for reinforcement deferral using a modified 47-bus CIGRE low-voltage benchmark and 8760-h nonlinear AC optimization. The principal case combines 1.5 times base demand with 200 electric vehicles and compares the existing benchmark network (BMK), Smart SOP, and conventional grid reinforcement (GRU). Smart SOP coordinates bidirectional active-power exchange, capacitive reactive support, and feeder-level served-load variables. It reduces annual energy not served from 15.36% to 3.72%, mean load-balancing index from 23.57% to 11.96%, and hours with more than 5% service reduction from 7059 to 2670. GRU nearly eliminates energy not served (0.04%) and provides the strongest voltage performance, but at substantially higher annual system cost. Capacity sensitivity shows diminishing returns beyond the baseline 402 kVA SOP rating, while Monte Carlo load uncertainty gives Smart SOP the highest median annual net value. The results indicate that Smart SOP can provide a lower-capital alternative to conventional reinforcement for concentrated electrification-driven growth while preserving substantially more service than the unreinforced network.
- Open Access
Lifetime Extension of Power Converters of Type-4 Wind Turbines at System Level
This study introduces an innovative approach to enhance the lifetime of power converters linked in a back-to-back configuration for Type-4 wind turbines. The proposed method involves periodically changing both the connection points and functions of the machine-side converter (MSC) and grid-side converter (GSC) at ultra-low frequencies. This adjustment enables shared usage of power semiconductor switch lifetime, specifically of the IGBTs in power modules and their diodes, across the inverter and rectifier modes. In addition, the method incorporates simulation-based tests to assess aging effects on semiconductors as part of the evaluation process. To validate this proposed strategy, simulations were carried out using PSCAD for modeling the wind turbine and converter systems, alongside MATLAB for developing thermal models, calculating losses, and determining expected lifetimes. The impedance parameters employed in the thermal network were obtained through manufacturer-led experimental data; furthermore, the estimated junction temperatures align with the results obtained from the manufacturer’s tool. The findings illustrate that the proposed approach can significantly improve the lifetime of wind turbine converter systems, by values of 85% or more, even if the swapping operation is implemented during maintenance work.
Open AccessLifetime Extension of Power Converters of Type-4 Wind Turbines at System Level
This study introduces an innovative approach to enhance the lifetime of power converters linked in a back-to-back configuration for Type-4 wind turbines. The proposed method involves periodically changing both the connection points and functions of the machine-side converter (MSC) and grid-side converter (GSC) at ultra-low frequencies. This adjustment enables shared usage of power semiconductor switch lifetime, specifically of the IGBTs in power modules and their diodes, across the inverter and rectifier modes. In addition, the method incorporates simulation-based tests to assess aging effects on semiconductors as part of the evaluation process. To validate this proposed strategy, simulations were carried out using PSCAD for modeling the wind turbine and converter systems, alongside MATLAB for developing thermal models, calculating losses, and determining expected lifetimes. The impedance parameters employed in the thermal network were obtained through manufacturer-led experimental data; furthermore, the estimated junction temperatures align with the results obtained from the manufacturer’s tool. The findings illustrate that the proposed approach can significantly improve the lifetime of wind turbine converter systems, by values of 85% or more, even if the swapping operation is implemented during maintenance work.
- Open Access
- 1 January 2022
- Published by Elsevier in SSRN Electronic Journal
Comparative Analysis of Rural Electrification Options: Single Wire Earth Return System vs. Solar Pv-Battery vs. Hybrid Solar Pv-Lpg Generator
There are still millions of households in rural areas that lack electricity. With the emergence of modular renewable energy systems such as solar PV, it is often wrongfully assumed that off grid solutions are the best options compared to grid extension to boost rural electrification (RUEL) rate. This paper takes a new look into single wire earth return (SWER) design as a low cost RUEL method. For RUEL, a standard isolating SWER, non-isolating SWER with centralized grounding transformer are compared with solar PV-battery and hybrid solar PV-LPG generator. The results show that for grid extension distance less than 30 km, SWER systems outperform off grid solutions in terms of capital expenditure (CAPEX), internal rate of return (IRR), levelized cost of energy (LCOE) and connection fee per house. In fact, the hybrid system which is the best-off grid solution costs 4.8 time the CAPEX of SWER, 1.6 times the LCOE of SWER, and only 0.2 times the IRR of SWER. Also, it yields a connection fee of 611$ per house while SWER costs only 128$ per house.
- 1 January 2022
- Published by Elsevier in SSRN Electronic Journal
Open AccessComparative Analysis of Rural Electrification Options: Single Wire Earth Return System vs. Solar Pv-Battery vs. Hybrid Solar Pv-Lpg Generator
There are still millions of households in rural areas that lack electricity. With the emergence of modular renewable energy systems such as solar PV, it is often wrongfully assumed that off grid solutions are the best options compared to grid extension to boost rural electrification (RUEL) rate. This paper takes a new look into single wire earth return (SWER) design as a low cost RUEL method. For RUEL, a standard isolating SWER, non-isolating SWER with centralized grounding transformer are compared with solar PV-battery and hybrid solar PV-LPG generator. The results show that for grid extension distance less than 30 km, SWER systems outperform off grid solutions in terms of capital expenditure (CAPEX), internal rate of return (IRR), levelized cost of energy (LCOE) and connection fee per house. In fact, the hybrid system which is the best-off grid solution costs 4.8 time the CAPEX of SWER, 1.6 times the LCOE of SWER, and only 0.2 times the IRR of SWER. Also, it yields a connection fee of 611$ per house while SWER costs only 128$ per house.