Oleksandr Oleksandrovych Zapyshnyi
Oleksandr Oleksandrovych Zapyshnyi has a total of 5 co-authors. Here are the top co-authors by number of shared publications:
- Bohdan Vitaliiovych Makarchuk
Національний технічний університет "Дніпровська політехніка", Україна
1 shared publication - Ivan Mykolaiovych Lutsenko1 shared publication
- Mariia Volodymyrivna Lutsenko1 shared publication
- Oleksandr Anatoliiovych Pohorilyi1 shared publication
- Pavlo Serhiiovych Tsyhan1 shared publication
Latest Publications
- Open Access
- 29 May 2026
- Published by Publishing House Helvetica (Publications) in Електротехнічні та інформаційні системи
- No. 109,p. 187-197
IMPROVED METHODOLOGY FOR SELECTING RATIONAL POWER OF TRANSFORMERS FOR GRID-CONNECTED PHOTOVOLTAIC POWER PLANTS USING PVSYST
Distributed generation systems (DGS) based on renewable energy sources represent an indispensable pathway for the forced transformation of Ukraine’s energy sector in the context of enhancing the reliability and energy efficiency of power supply to consumers. The simplicity and rapid deployment of photovoltaic power plants (PVPPs) have created favorable conditions for their widespread integration into distribution networks under various business models. Solar generation capacity exceeds that of all other distributed generation sources combined by a factor of four.Despite more than a decade of PVPP deployment, the methodological approaches to their design require revision and refinement to ensure more efficient utilization of network capacity, particularly that of power transformers at step-up substations and power collection substations.The aim of this paper is to substantiate a methodological approach to improving the design of power supply systems and to determine the optimal capacity of transformers for grid-connected PVPPs using desktop application for photovoltaic system simulation PVsyst.The research methodology is based on modeling and operational analysis of a typical 1 MW grid-connected PVPP using the PVsyst software package, as well as existing regulatory and technical documentation on transformer loading capacity, in order to assess their efficiency under the influence of key operational factors.The scientific novelty of the study lies in the development of a new methodological approach to selecting the optimal capacity of power transformers for PVPPs under specified operating conditions.The practical significance of the research is reflected in the possibility of applying the proposed approach by design organizations to reduce capital expenditures in PVPP construction through the selection of rational parameters of distribution equipment.
- 29 May 2026
- Published by Publishing House Helvetica (Publications) in Електротехнічні та інформаційні системи
- No. 109,p. 187-197
Open AccessIMPROVED METHODOLOGY FOR SELECTING RATIONAL POWER OF TRANSFORMERS FOR GRID-CONNECTED PHOTOVOLTAIC POWER PLANTS USING PVSYST
Distributed generation systems (DGS) based on renewable energy sources represent an indispensable pathway for the forced transformation of Ukraine’s energy sector in the context of enhancing the reliability and energy efficiency of power supply to consumers. The simplicity and rapid deployment of photovoltaic power plants (PVPPs) have created favorable conditions for their widespread integration into distribution networks under various business models. Solar generation capacity exceeds that of all other distributed generation sources combined by a factor of four.Despite more than a decade of PVPP deployment, the methodological approaches to their design require revision and refinement to ensure more efficient utilization of network capacity, particularly that of power transformers at step-up substations and power collection substations.The aim of this paper is to substantiate a methodological approach to improving the design of power supply systems and to determine the optimal capacity of transformers for grid-connected PVPPs using desktop application for photovoltaic system simulation PVsyst.The research methodology is based on modeling and operational analysis of a typical 1 MW grid-connected PVPP using the PVsyst software package, as well as existing regulatory and technical documentation on transformer loading capacity, in order to assess their efficiency under the influence of key operational factors.The scientific novelty of the study lies in the development of a new methodological approach to selecting the optimal capacity of power transformers for PVPPs under specified operating conditions.The practical significance of the research is reflected in the possibility of applying the proposed approach by design organizations to reduce capital expenditures in PVPP construction through the selection of rational parameters of distribution equipment.