Jian Hu
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Jian Hu has a total of 5 co-authors. Here are the top co-authors by number of shared publications:
- Mingjun He
Electric Power Research Institute of Guizhou Power Grid Co., Ltd., Guiyang 550002, China
1 shared publication - Song Zhang
Electric Power Research Institute of Guizhou Power Grid Co., Ltd., Guiyang 550002, China
1 shared publication - Tong Shi
Guizhou Electric Power Research Institute of Guizhou Power Grid Co., Ltd., Guiyang 550002, China
1 shared publication - Xinyu You
Electric Power Research Institute of Guizhou Power Grid Co., Ltd., Guiyang 550002, China
1 shared publication - Yongxiang Cai
Electric Power Research Institute of Guizhou Power Grid Co., Ltd., Guiyang 550002, China
1 shared publication
Latest Publications
- Open Access
Multistage Coordinated Scheduling of Integrated CSP–Wind Systems via ASMPC Considering Dynamic Line Rating
With the increasing integration of grid-friendly concentrated solar power (CSP) plants into high-proportion new energy power systems, the system is confronted with challenges such as insufficient regulation capability and power balance difficulties. To address these issues, this paper proposes a multi-stage optimal regulation strategy for CSP–wind power systems based on adaptive step-size model predictive control (ASMPC), from the perspectives of tapping transmission line current-carrying capacity and coordinating system regulation resources. This strategy first establishes an electro–thermal–mechanical coupling dynamic line rating (DLR) model to characterize line safety margins, then constructs an optimization decision-making model aiming at minimizing the total multi-stage coordinated scheduling cost and adopts ASMPC to dynamically adjust the control step size, effectively improving scheduling accuracy and real-time correction capability. Simulation results based on the modified IEEE 39-bus system show that the proposed method reduces the total system cost by 26.8% (nearly 30%), increases the CSP unit output ratio by 27.9%, and decreases the average grid load rate by 12.6 percentage points. The proposed strategy can effectively mitigate the impact of source-load uncertain fluctuations and significantly improve the economic operation level of the CSP–wind power combined system.
Open AccessMultistage Coordinated Scheduling of Integrated CSP–Wind Systems via ASMPC Considering Dynamic Line Rating
With the increasing integration of grid-friendly concentrated solar power (CSP) plants into high-proportion new energy power systems, the system is confronted with challenges such as insufficient regulation capability and power balance difficulties. To address these issues, this paper proposes a multi-stage optimal regulation strategy for CSP–wind power systems based on adaptive step-size model predictive control (ASMPC), from the perspectives of tapping transmission line current-carrying capacity and coordinating system regulation resources. This strategy first establishes an electro–thermal–mechanical coupling dynamic line rating (DLR) model to characterize line safety margins, then constructs an optimization decision-making model aiming at minimizing the total multi-stage coordinated scheduling cost and adopts ASMPC to dynamically adjust the control step size, effectively improving scheduling accuracy and real-time correction capability. Simulation results based on the modified IEEE 39-bus system show that the proposed method reduces the total system cost by 26.8% (nearly 30%), increases the CSP unit output ratio by 27.9%, and decreases the average grid load rate by 12.6 percentage points. The proposed strategy can effectively mitigate the impact of source-load uncertain fluctuations and significantly improve the economic operation level of the CSP–wind power combined system.