DODouglas Silva de Oliveira
Douglas Silva de Oliveira
*This is an algorithmically generated author record based on publicly available information.
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Douglas Silva de Oliveira has a total of 4 co-authors. Here are the top co-authors by number of shared publications:
- Carlos Eduardo Velasquez
Departamento de Engenharia Nuclear, Universidade Federal de Minas Gerais, Av. Antonio Carlos 6627, Belo Horizonte 31270-901, Brazil
2 shared publications - Jin Yang
James Watt School of Engineering, University of Glasgow, Glasgow G12 8QQ, UK
1 shared publication - José Péricles Freire
Departamento de Engenharia Nuclear, Universidade Federal de Minas Gerais, Av. Antonio Carlos 6627, Belo Horizonte 31270-901, Brazil
1 shared publication - Lihki Rubio
Department of Mathematics and Statistics, Universidad del Norte, Km. 5 Vía Puerto Colombia, Barranquilla 080001, Colombia
1 shared publication
Latest Publications
- Open Access
Technology-Oriented Wind Farm Configuration Selection Using an RFR-Based Turbine Power-Output Surrogate Model: A National-Scale Assessment for Brazil
This work presents a framework for national-scale onshore wind farm screening in Brazil based on turbine technology. The approach integrates ERA5 hourly wind fields, turbine technical specifications, a Random Forest Regression (RFR)-based turbine power-output surrogate model, and GIS-based spatial exclusion analysis. The RFR model was trained using 821 empirical power curves, enabling different real turbine models to be evaluated within a unified framework. Seven representative turbines were evaluated across five wind farm configurations under capacity-factor thresholds of 0.20, 0.25, and 0.44. Results show that turbine technology substantially changes site suitability: for , viable locations ranged from 116 to 1846, and for , from 19 to 1175. Only 298 locations nationally reached , with the two best-performing configurations accounting for 297 of them. Even between these similarly rated turbines, neither dominated nationally: one outperformed the other at 58.5% of viable locations, with the reverse holding for the remaining 41.5%. Under the cost assumptions adopted, only the best-performing configurations achieved levelized costs of energy competitive with recently contracted wind energy prices in Brazil. Validation against the Icaraizinho wind farm yielded an MAPE of 6.40%. Overall, the results demonstrate that wind potential is technology-dependent and should be assessed using turbine-specific performance models.Open AccessTechnology-Oriented Wind Farm Configuration Selection Using an RFR-Based Turbine Power-Output Surrogate Model: A National-Scale Assessment for Brazil
This work presents a framework for national-scale onshore wind farm screening in Brazil based on turbine technology. The approach integrates ERA5 hourly wind fields, turbine technical specifications, a Random Forest Regression (RFR)-based turbine power-output surrogate model, and GIS-based spatial exclusion analysis. The RFR model was trained using 821 empirical power curves, enabling different real turbine models to be evaluated within a unified framework. Seven representative turbines were evaluated across five wind farm configurations under capacity-factor thresholds of 0.20, 0.25, and 0.44. Results show that turbine technology substantially changes site suitability: for , viable locations ranged from 116 to 1846, and for , from 19 to 1175. Only 298 locations nationally reached , with the two best-performing configurations accounting for 297 of them. Even between these similarly rated turbines, neither dominated nationally: one outperformed the other at 58.5% of viable locations, with the reverse holding for the remaining 41.5%. Under the cost assumptions adopted, only the best-performing configurations achieved levelized costs of energy competitive with recently contracted wind energy prices in Brazil. Validation against the Icaraizinho wind farm yielded an MAPE of 6.40%. Overall, the results demonstrate that wind potential is technology-dependent and should be assessed using turbine-specific performance models. - Open Access
- 6 July 2026
- Published by Elsevier in International Journal of Hydrogen Energy
- Vol. 255
The curtailment cost paradox: Intermittency penalties invert hydrogen production economics in a vre-rich emerging economy
- 6 July 2026
- Published by Elsevier in International Journal of Hydrogen Energy
- Vol. 255
Open AccessThe curtailment cost paradox: Intermittency penalties invert hydrogen production economics in a vre-rich emerging economy