Nathalia Chaparro-Hernandez
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Nathalia Chaparro-Hernandez has a total of 4 co-authors. Here are the top co-authors by number of shared publications:
- Enrique Delahoz-Domínguez
Facultad de Ingeniería, Universidad del Magdalena, Santa Marta 470004, Colombia
1 shared publication - Manuel J. Campuzano
Facultad de Ingeniería, Universidad del Magdalena, Santa Marta 470004, Colombia
1 shared publication - Rick Acosta-Vega
Facultad de Ingeniería, Universidad del Magdalena, Santa Marta 470004, Colombia
1 shared publication - Rick Acosta-Vega
Facultad de Ingeniería y Ciencias Básicas, Fundación Universitaria del Área Andina, Bogotá 110911, Colombia
1 shared publication
Latest Publications
- Open Access
Resource-Constrained Adaptive Sampling for Variance Monitoring: Comparing Rule-Based, MLP, and LSTM Acquisition Policies
Automated monitoring must balance detection delay and measurement use. This study compares rule-based, feedforward multilayer perceptron (MLP), and long short-term memory (LSTM) acquisition policies coupled to a common exponentially weighted moving average (EWMA) variance detector. Experiments 1 and 2 comprise 714,000 and 660,000 test trajectories, respectively. Closely matched rule and LSTM configurations achieve in-control average run lengths of 369.97 and 370.11, consumption of 4.918 and 4.917 observations per epoch, and weighted detection delays of 18.860 and 18.864 epochs; the conditional 95% bootstrap confidence interval for the difference in their weighted delays includes zero. A third experiment repeats optimization, selection, calibration, and testing ten times per family, comparing a search budget of 512 candidate evaluations with one of 30 CPU seconds. The mean LSTM-minus-rule delay contrasts are −0.219 and +0.206 epochs, respectively, with across-run 95% intervals [−0.723, 0.285] and [−0.295, 0.708]. Scenario weights, measurement prices, and acquisition duration further affect policy comparisons. The findings characterize the evaluated finite search procedures and operating points within a common detector; they establish neither intrinsic superiority nor equivalence of the policy architectures.
Open AccessResource-Constrained Adaptive Sampling for Variance Monitoring: Comparing Rule-Based, MLP, and LSTM Acquisition Policies
Automated monitoring must balance detection delay and measurement use. This study compares rule-based, feedforward multilayer perceptron (MLP), and long short-term memory (LSTM) acquisition policies coupled to a common exponentially weighted moving average (EWMA) variance detector. Experiments 1 and 2 comprise 714,000 and 660,000 test trajectories, respectively. Closely matched rule and LSTM configurations achieve in-control average run lengths of 369.97 and 370.11, consumption of 4.918 and 4.917 observations per epoch, and weighted detection delays of 18.860 and 18.864 epochs; the conditional 95% bootstrap confidence interval for the difference in their weighted delays includes zero. A third experiment repeats optimization, selection, calibration, and testing ten times per family, comparing a search budget of 512 candidate evaluations with one of 30 CPU seconds. The mean LSTM-minus-rule delay contrasts are −0.219 and +0.206 epochs, respectively, with across-run 95% intervals [−0.723, 0.285] and [−0.295, 0.708]. Scenario weights, measurement prices, and acquisition duration further affect policy comparisons. The findings characterize the evaluated finite search procedures and operating points within a common detector; they establish neither intrinsic superiority nor equivalence of the policy architectures.
- Open Access
A MILP-Based Two-Echelon Logistics Network Design Model Under Uncertainty: Application to a Perishable Banana Supply Chain
Background: Perishable agri-food supply chains require logistics networks that remain economically viable despite fluctuations in demand, transportation costs, and market prices. This study develops and evaluates a two-echelon logistics network for the banana supply chain in Magdalena, Colombia. Methods: A mixed-integer linear programming model was formulated to maximise daily profit by jointly determining collection-centre activation and product flows among 14 producers, five candidate collection centres, and two commercial buyers. The deterministic solution was complemented by sensitivity analysis and 1000 Monte Carlo optimisation scenarios incorporating variability in demand, transportation costs, and selling prices. Results: Under nominal conditions, all five collection centres were activated, the full demand of 42,000 kg/day was served, and the optimal profit was USD 3093/day. Centres C1–C4 operated at full capacity, whereas C5 reached 42.9% utilization. Under uncertainty, the mean profit decreased to USD 1955.70/day, the mean unmet demand was 954.03 kg/day, and shortages occurred in 72.3% of scenarios. C1–C4 remained the network core, while C5 acted as a flexible contingency facility. Conclusions: The proposed framework reveals an efficiency–resilience trade-off overlooked by deterministic optimisation. Demand growth and capacity reductions are the principal operational risks, supporting investment in collection capacity and proactive demand management.
Open AccessA MILP-Based Two-Echelon Logistics Network Design Model Under Uncertainty: Application to a Perishable Banana Supply Chain
Background: Perishable agri-food supply chains require logistics networks that remain economically viable despite fluctuations in demand, transportation costs, and market prices. This study develops and evaluates a two-echelon logistics network for the banana supply chain in Magdalena, Colombia. Methods: A mixed-integer linear programming model was formulated to maximise daily profit by jointly determining collection-centre activation and product flows among 14 producers, five candidate collection centres, and two commercial buyers. The deterministic solution was complemented by sensitivity analysis and 1000 Monte Carlo optimisation scenarios incorporating variability in demand, transportation costs, and selling prices. Results: Under nominal conditions, all five collection centres were activated, the full demand of 42,000 kg/day was served, and the optimal profit was USD 3093/day. Centres C1–C4 operated at full capacity, whereas C5 reached 42.9% utilization. Under uncertainty, the mean profit decreased to USD 1955.70/day, the mean unmet demand was 954.03 kg/day, and shortages occurred in 72.3% of scenarios. C1–C4 remained the network core, while C5 acted as a flexible contingency facility. Conclusions: The proposed framework reveals an efficiency–resilience trade-off overlooked by deterministic optimisation. Demand growth and capacity reductions are the principal operational risks, supporting investment in collection capacity and proactive demand management.