Shiqiang He
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Shiqiang He has a total of 6 co-authors. Here are the top co-authors by number of shared publications:
- A. Fa-You
Faculty of Land Resource Engineering, Kunming University of Science and Technology, Kunming 650093, China
4 shared publications - Haifeng Jia
Faculty of Land Resource Engineering, Kunming University of Science and Technology, Kunming 650093, China
4 shared publications - Ruoxi Lin
Faculty of Land Resource Engineering, Kunming University of Science and Technology, Kunming 650093, China
4 shared publications - Shiqun Yan
Faculty of Land Resource Engineering, Kunming University of Science and Technology, Kunming 650093, China
4 shared publications - Zhang Luo
Faculty of Land Resource Engineering, Kunming University of Science and Technology, Kunming 650093, China
4 shared publications - Jingxuan Yu
South-to-North Water Diversion East Route Jiangsu Water Source Co., Ltd., Nanjing 210000, China
1 shared publication
Latest Publications
- Open Access
Equivalent Cross-Sectional Area of Micropile Groups Under Different Surrounding Rock-Mass Strengths
This study investigated the effects of surrounding-rock strength and pile arrangement on the direct shear capacity of micropile groups. Forty-eight specimens representing three pile arrangements, four mortar grades (M5, M10, M15, and M25), and four replicates per condition were tested, and the 12 corresponding conditions were simulated within a calibrated FLAC3D framework. Peak loads were compared with simulated peak reactions. The output of the proposed “equivalent cross-sectional area” formulation, Aeq,ref, was defined as an assumption-dependent capacity-normalization index with units of area, not a measured geometric or cooperative area. It was calculated from adopted reference values for peak shear stress (τref) and effective height (Lref), neither independently measured. Mean peak load increased with mortar grade, but no pile arrangement was consistently superior. Ten of 12 simulated peaks differed from the experimental means by less than 10%; the circular M5 and M10 errors were 17.74% and 10.48%, respectively. Aeq,ref decreased by approximately 54–61% from M5 to M25 because the adopted τref increased faster than the measured group capacity. Accordingly, the index is valid only within the adopted reference-parameter framework and should not be used for design until interface strength and shear-band thickness are independently determined.
Open AccessEquivalent Cross-Sectional Area of Micropile Groups Under Different Surrounding Rock-Mass Strengths
This study investigated the effects of surrounding-rock strength and pile arrangement on the direct shear capacity of micropile groups. Forty-eight specimens representing three pile arrangements, four mortar grades (M5, M10, M15, and M25), and four replicates per condition were tested, and the 12 corresponding conditions were simulated within a calibrated FLAC3D framework. Peak loads were compared with simulated peak reactions. The output of the proposed “equivalent cross-sectional area” formulation, Aeq,ref, was defined as an assumption-dependent capacity-normalization index with units of area, not a measured geometric or cooperative area. It was calculated from adopted reference values for peak shear stress (τref) and effective height (Lref), neither independently measured. Mean peak load increased with mortar grade, but no pile arrangement was consistently superior. Ten of 12 simulated peaks differed from the experimental means by less than 10%; the circular M5 and M10 errors were 17.74% and 10.48%, respectively. Aeq,ref decreased by approximately 54–61% from M5 to M25 because the adopted τref increased faster than the measured group capacity. Accordingly, the index is valid only within the adopted reference-parameter framework and should not be used for design until interface strength and shear-band thickness are independently determined.
- Open Access
Progressive Deformation Mechanism and Stability Analysis of a High-Fill Expansive Soil Slope
Background: To elucidate the hydraulic response, progressive deformation, and wetting-induced swelling effects of high-fill expansive soil slopes throughout the rainfall–cessation process. Methods: A high-fill expansive soil slope in Jianshui, Yunnan Province, China, was selected as the study case. A three-dimensional coupled saturated–unsaturated seepage and wetting-induced swelling model was established to simulate the evolution of pore-water pressure, displacement, maximum shear strain increment, and factor of safety during 24 h of continuous rainfall followed by 48 h without rainfall. Results: During rainfall, the shallow part of the slope exhibited a pronounced pore-water pressure response. Displacement and shear strain were mainly concentrated in the middle and lower portions of the slope, near the platform transitions, and around the slope toe. Throughout the rainfall–cessation process, the factor of safety generally exhibited a decreasing trend. Wetting-induced swelling further intensified slope deformation and shear strain concentration. At 72 h, the maximum total displacement increased from 92.5 mm without considering wetting-induced swelling to 139.0 mm when wetting-induced swelling was considered, representing an increase of approximately 50.3%. After rainfall ceased, pore-water pressure and displacement remained essentially stable when wetting-induced swelling was neglected. When wetting-induced swelling was considered, matric suction increased during approximately the first 0–9 h after rainfall cessation, whereas slope displacement continued to increase after the end of rainfall and gradually stabilized only after approximately 9 h. These results indicate that the hydraulic state and deformation of the slope continued to adjust after rainfall cessation. Conclusions: Wetting-induced swelling not only increased shear deformation and reduced slope stability but also altered the post-rainfall displacement response, causing deformation adjustment to persist after rainfall cessation. Neglecting wetting-induced swelling, or evaluating slope stability solely at the end of rainfall, may therefore underestimate the actual slope deformation and overlook the continued evolution of pore-water pressure and displacement, ultimately leading to an underestimation of the final deformation magnitude and potential instability risk.
Open AccessProgressive Deformation Mechanism and Stability Analysis of a High-Fill Expansive Soil Slope
Background: To elucidate the hydraulic response, progressive deformation, and wetting-induced swelling effects of high-fill expansive soil slopes throughout the rainfall–cessation process. Methods: A high-fill expansive soil slope in Jianshui, Yunnan Province, China, was selected as the study case. A three-dimensional coupled saturated–unsaturated seepage and wetting-induced swelling model was established to simulate the evolution of pore-water pressure, displacement, maximum shear strain increment, and factor of safety during 24 h of continuous rainfall followed by 48 h without rainfall. Results: During rainfall, the shallow part of the slope exhibited a pronounced pore-water pressure response. Displacement and shear strain were mainly concentrated in the middle and lower portions of the slope, near the platform transitions, and around the slope toe. Throughout the rainfall–cessation process, the factor of safety generally exhibited a decreasing trend. Wetting-induced swelling further intensified slope deformation and shear strain concentration. At 72 h, the maximum total displacement increased from 92.5 mm without considering wetting-induced swelling to 139.0 mm when wetting-induced swelling was considered, representing an increase of approximately 50.3%. After rainfall ceased, pore-water pressure and displacement remained essentially stable when wetting-induced swelling was neglected. When wetting-induced swelling was considered, matric suction increased during approximately the first 0–9 h after rainfall cessation, whereas slope displacement continued to increase after the end of rainfall and gradually stabilized only after approximately 9 h. These results indicate that the hydraulic state and deformation of the slope continued to adjust after rainfall cessation. Conclusions: Wetting-induced swelling not only increased shear deformation and reduced slope stability but also altered the post-rainfall displacement response, causing deformation adjustment to persist after rainfall cessation. Neglecting wetting-induced swelling, or evaluating slope stability solely at the end of rainfall, may therefore underestimate the actual slope deformation and overlook the continued evolution of pore-water pressure and displacement, ultimately leading to an underestimation of the final deformation magnitude and potential instability risk.
- Open Access
Instability Mechanism of a Soil–Rock Binary-Structure Slope Under Rainfall Conditions
Rainfall-induced instability of highway slopes with a soil–rock binary structure may be strongly influenced by the hydraulic barrier effect of low-permeability shale. This study investigated the right-side slope along the D-ramp section from DK0+230 to DK0+660 at Deze Interchange on the Zhanhui Expressway, China. A two-dimensional coupled seepage–stress model was developed based on the engineering geological conditions and rainfall records to simulate the slope response under a 72 h extreme rainfall scenario with an intensity of 175.6 mm/d. Field displacement monitoring data were used to validate the modeled deformation pattern under natural conditions. Under natural conditions, the reinforced toe zone remained stable, deformation was concentrated along the interface between the block-stone layer and strongly weathered limestone in the middle and rear portions of the slope, and the factor of safety was 1.1344, indicating a basically stable state. During prolonged rainfall, infiltrating water accumulated near the interface between the strongly weathered shale and the underlying shale owing to the hydraulic barrier effect of the low-permeability shale, forming a continuous transient saturated zone. The plastic zone progressively extended from the upper shallow weak interface to the lower deep interface and eventually became fully connected, while the factor of safety decreased to 0.9886, indicating overall instability. The results reveal a coupled mechanism involving interfacial water accumulation, increased pore-water pressure, the formation of a transient saturated zone, and a shift in the controlling zone of slope deformation and failure from shallow to deeper layers. These findings provide a reference for disaster prevention and mitigation of similar soil–rock binary-structure slopes.
Open AccessInstability Mechanism of a Soil–Rock Binary-Structure Slope Under Rainfall Conditions
Rainfall-induced instability of highway slopes with a soil–rock binary structure may be strongly influenced by the hydraulic barrier effect of low-permeability shale. This study investigated the right-side slope along the D-ramp section from DK0+230 to DK0+660 at Deze Interchange on the Zhanhui Expressway, China. A two-dimensional coupled seepage–stress model was developed based on the engineering geological conditions and rainfall records to simulate the slope response under a 72 h extreme rainfall scenario with an intensity of 175.6 mm/d. Field displacement monitoring data were used to validate the modeled deformation pattern under natural conditions. Under natural conditions, the reinforced toe zone remained stable, deformation was concentrated along the interface between the block-stone layer and strongly weathered limestone in the middle and rear portions of the slope, and the factor of safety was 1.1344, indicating a basically stable state. During prolonged rainfall, infiltrating water accumulated near the interface between the strongly weathered shale and the underlying shale owing to the hydraulic barrier effect of the low-permeability shale, forming a continuous transient saturated zone. The plastic zone progressively extended from the upper shallow weak interface to the lower deep interface and eventually became fully connected, while the factor of safety decreased to 0.9886, indicating overall instability. The results reveal a coupled mechanism involving interfacial water accumulation, increased pore-water pressure, the formation of a transient saturated zone, and a shift in the controlling zone of slope deformation and failure from shallow to deeper layers. These findings provide a reference for disaster prevention and mitigation of similar soil–rock binary-structure slopes.
- Open Access
Numerical Investigation of the Formation Mechanism and Mitigation of a Clayey Landslide Under Excavation–Rainfall Coupling
An excavation-induced clayey landslide in Jianshui County, Yunnan Province, China, threatens a national refined oil pipeline near the rear slope. Field investigation, borehole logging, laboratory testing, and three-dimensional finite-element analyses were integrated to investigate the excavation–rainstorm instability mechanism and evaluate circular anti-slide piles with toe backfilling. Under natural excavation, the reported factor of safety was 1.39, and the maximum displacement was 2.35 mm. Under a 60 mm/day rainstorm, increased pore-water pressure and saturation in the shallow sliding mass and strongly weathered claystone, together with saturated-state strength parameters, reduced the shear-strength reserve. The deformation and stability analyses yielded a maximum computed displacement of 1.36 m and a factor of safety of 0.95, respectively, indicating pronounced pre-failure deformation and loss of stability. After mitigation, the factor of safety increased to 1.41, while the maximum slope and pile-head displacements were both approximately 6.90 mm. The pile row redistributed nonuniform landslide thrust and reduced deformation transfer toward the pipeline. The results are site-specific engineering estimates for the investigated rainfall and parameter conditions.
Open AccessNumerical Investigation of the Formation Mechanism and Mitigation of a Clayey Landslide Under Excavation–Rainfall Coupling
An excavation-induced clayey landslide in Jianshui County, Yunnan Province, China, threatens a national refined oil pipeline near the rear slope. Field investigation, borehole logging, laboratory testing, and three-dimensional finite-element analyses were integrated to investigate the excavation–rainstorm instability mechanism and evaluate circular anti-slide piles with toe backfilling. Under natural excavation, the reported factor of safety was 1.39, and the maximum displacement was 2.35 mm. Under a 60 mm/day rainstorm, increased pore-water pressure and saturation in the shallow sliding mass and strongly weathered claystone, together with saturated-state strength parameters, reduced the shear-strength reserve. The deformation and stability analyses yielded a maximum computed displacement of 1.36 m and a factor of safety of 0.95, respectively, indicating pronounced pre-failure deformation and loss of stability. After mitigation, the factor of safety increased to 1.41, while the maximum slope and pile-head displacements were both approximately 6.90 mm. The pile row redistributed nonuniform landslide thrust and reduced deformation transfer toward the pipeline. The results are site-specific engineering estimates for the investigated rainfall and parameter conditions.