Jinghua Tang
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Jinghua Tang has a total of 5 co-authors. Here are the top co-authors by number of shared publications:
- Chinara Adamkulova
Institute of Management and Business, Kyrgyz National University named after Jusup Balasagyn, Bishkek 720033, Kyrgyzstan
1 shared publication - Hanwen Cui
School of Engineering and Built Environment, Griffith University, Southport, QLD 4222, Australia
1 shared publication - Hao Fu
School of Environment and Civil Engineering, Dongguan University of Technology, Dongguan 523808, China
1 shared publication - Wensheng Liang
School of Architectural and Hydraulic Engineering, Jiujiang Polytechnic University of Science and Technology, Jiujiang 332020, China
1 shared publication - Xindong Chang
School of Government, Universiti Utara Malaysia, Sintok 06010, Kedah, Malaysia
1 shared publication
Latest Publications
- Open Access
Sustainable Integrated Project Control for Prefabricated Construction: A Synchronization-Loss Metric Linking Multi-Stage Scheduling, Cost, and Delivery Risk
Prefabricated construction couples factory production, buffer storage, transportation, on-site installation, and workforce resources. Desynchronization across these stages creates waiting, idle labor, standby, and buffer pressure—non-value-adding losses that local schedule and cost controls leave hidden. This study takes a project-control view of multi-stage prefabricated delivery and develops a full multi-stage synchronization model that makes these losses explicit and controllable during schedule evaluation. From a sustainable-construction perspective, the framework targets operational resource efficiency by reducing non-value-adding waiting, idle labor, buffer burden, and standby, rather than claiming direct carbon or life-cycle effects. The model optimizes three objectives: makespan, total cost, and a resource-efficiency synchronization loss (RESL) that aggregates waiting, crew-idle, buffer, and standby losses; RESL is a schedule-based resource-efficiency proxy, not a carbon or life-cycle measure. A SPEA2-based solver, SI-SAR-SPEA2, adds structured initialization and synchronization-aware light repair. Using project-inspired semi-realistic prefabricated building-delivery instances, the evaluation compares alternative model scopes, algorithm baselines, a pre-fixed fresh-seed extension, ablation variants, and sensitivity settings. The full model exposes cross-stage synchronization losses and substantially reduces RESL relative to a production–transport model, whereas its relative performance against a production–transport–installation model remains marginal, instance-dependent, and weight-dependent. Under the formal benchmark protocol, SI-SAR-SPEA2 improves hypervolume, average rank, and RESL compared with the SPEA2 backbone, but this quality gain requires additional runtime. The results position RESL as an integrated project-control indicator for comparing schedule alternatives in terms of delivery timing, cost exposure, workforce utilization, and synchronization risk.
Open AccessSustainable Integrated Project Control for Prefabricated Construction: A Synchronization-Loss Metric Linking Multi-Stage Scheduling, Cost, and Delivery Risk
Prefabricated construction couples factory production, buffer storage, transportation, on-site installation, and workforce resources. Desynchronization across these stages creates waiting, idle labor, standby, and buffer pressure—non-value-adding losses that local schedule and cost controls leave hidden. This study takes a project-control view of multi-stage prefabricated delivery and develops a full multi-stage synchronization model that makes these losses explicit and controllable during schedule evaluation. From a sustainable-construction perspective, the framework targets operational resource efficiency by reducing non-value-adding waiting, idle labor, buffer burden, and standby, rather than claiming direct carbon or life-cycle effects. The model optimizes three objectives: makespan, total cost, and a resource-efficiency synchronization loss (RESL) that aggregates waiting, crew-idle, buffer, and standby losses; RESL is a schedule-based resource-efficiency proxy, not a carbon or life-cycle measure. A SPEA2-based solver, SI-SAR-SPEA2, adds structured initialization and synchronization-aware light repair. Using project-inspired semi-realistic prefabricated building-delivery instances, the evaluation compares alternative model scopes, algorithm baselines, a pre-fixed fresh-seed extension, ablation variants, and sensitivity settings. The full model exposes cross-stage synchronization losses and substantially reduces RESL relative to a production–transport model, whereas its relative performance against a production–transport–installation model remains marginal, instance-dependent, and weight-dependent. Under the formal benchmark protocol, SI-SAR-SPEA2 improves hypervolume, average rank, and RESL compared with the SPEA2 backbone, but this quality gain requires additional runtime. The results position RESL as an integrated project-control indicator for comparing schedule alternatives in terms of delivery timing, cost exposure, workforce utilization, and synchronization risk.