Yusuf Masykur Darmawan
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Yusuf Masykur Darmawan has a total of 2 co-authors. Here are the top co-authors by number of shared publications:
- Indah Pratiwi
Department of Industrial Engineering, Faculty of Engineering, Universitas Muhammadiyah Surakarta, Surakarta 57169, Indonesia
1 shared publication - Mohd Nasrull Abdol Rahman
Faculty of Mechanical and Manufacturing Engineering, Universiti Tun Hussein Onn Malaysia, Batu Pahat 86400, Malaysia
1 shared publication
Latest Publications
- Open Access
- 17 August 2026
- Published by MDPI AG in Engineering Proceedings
- Vol. 137 (1) , 29
Implementation of Lean Manufacturing to Minimize Waste in the Fire Ring Production Process
Enggal Jaya MSME is a small-scale enterprise specializing in metal casting and the production of fire rings, with a monthly capacity exceeding 15,000 units. Currently, its production process exhibits significant inefficiencies across the seven wastes of lean manufacturing: overproduction, defects, inventory, motion, transportation, overprocessing, and waiting. This study aims to map the information and production workflows for fire ring components, analyze the types and root causes of waste, and propose actionable solutions to improve shop-floor efficiency. Value Stream Mapping (VSM) and the Waste Assessment Model (WAM) were utilized as the primary methodologies. The current-state VSM revealed a Process Cycle Efficiency (PCE) of 69%, whereas the proposed future-state VSM demonstrates an improved PCE of 73%. Furthermore, Waste Assessment Questionnaire (WAQ) calculations identified five major types of critical waste: overproduction (19.2%), defects (18.0%), inventory (16.1%), motion (15.2%), and transportation (13.3%). Proposed countermeasures include systematically recording production activities, developing Standard Operating Procedures (SOPs), integrating appropriate material handling tools, and implementing rigorous production forecasting and scheduling.
- 17 August 2026
- Published by MDPI AG in Engineering Proceedings
- Vol. 137 (1) , 29
Open AccessImplementation of Lean Manufacturing to Minimize Waste in the Fire Ring Production Process
Enggal Jaya MSME is a small-scale enterprise specializing in metal casting and the production of fire rings, with a monthly capacity exceeding 15,000 units. Currently, its production process exhibits significant inefficiencies across the seven wastes of lean manufacturing: overproduction, defects, inventory, motion, transportation, overprocessing, and waiting. This study aims to map the information and production workflows for fire ring components, analyze the types and root causes of waste, and propose actionable solutions to improve shop-floor efficiency. Value Stream Mapping (VSM) and the Waste Assessment Model (WAM) were utilized as the primary methodologies. The current-state VSM revealed a Process Cycle Efficiency (PCE) of 69%, whereas the proposed future-state VSM demonstrates an improved PCE of 73%. Furthermore, Waste Assessment Questionnaire (WAQ) calculations identified five major types of critical waste: overproduction (19.2%), defects (18.0%), inventory (16.1%), motion (15.2%), and transportation (13.3%). Proposed countermeasures include systematically recording production activities, developing Standard Operating Procedures (SOPs), integrating appropriate material handling tools, and implementing rigorous production forecasting and scheduling.