    LONG-TERM MAINTENANCE COST FORECASTING AND WARRANTY BUDGET PLANNING FOR RESIDENTIAL BUILDINGS IN BANGKOK, THAILAND

    by Wannawit Taemthong, Nattasit Chaisaard, Wichai Cheyaphong

    This study evaluates the adequacy of current warranty budget allocations in residential developments and proposes differentiated, data-driven percentages based on long-term maintenance cost projections and project characteristics. Empirical defect data from five condominium projects in Bangkok, varying in unit type, scale, and market positioning, were collected between 2019 and 2023 and used to model 30-year cost projections through linear regression. The findings show that maintenance costs consistently increase over time, with annual cost slopes ranging from USD 10,162 to USD 30,857 and R² values between 0.90 and 0.99, while projected lifetime maintenance costs represent 5.56% to 11.26% of total project values. The widely adopted 2% warranty allocation was found to be inadequate, depleting as early as year 11 in high-density or lower-cost projects. Based on cumulative cost behavior and project conditions, differentiated warranty budgets of 6% to 11% are recommended to ensure financial sustainability. While the analysis is limited to five projects in Bangkok and linear forecasting methods, the results underscore the importance of empirical, context-sensitive approaches to warranty planning. By integrating real defect data with long-term cost modeling, this research provides a practical framework for improving financial foresight, construction quality, and asset management in rapidly urbanizing regions.

  • Open Access

    PROBABILISTIC SCHEDULING OF RESIDENTIAL CONSTRUCTION USING MONTE CARLO SIMULATION

    by Nattasit Chaisaard, Kornvisith Silarom

    The Precedence Diagram Method (PDM) relies on deterministic activity times to calculate the Total Project Duration (TPD), a characteristic that inherently limits its predictive accuracy. To address this limitation, the present study integrates Monte Carlo Simulation (MCS) with conventional PDM calculation to predict the TPD of a luxury housing project. Initially, the critical path was identified through the conventional PDM approach. Subsequently, MCS was applied, running 10,000 iterations under the assumption of a normal distribution for all activity durations. The choice of normal distribution is grounded in Central Limit Theorem (CLT), which is efficient for aggregate project level. The TPD for each iteration was recorded, thus generating a probability distribution for project completion time. The deterministic PDM analysis initially yielded a TPD of 420 days. In contrast, the MCS approach produced a mean TPD of 397 days (a 23-day reduction) and revealed only a 45.6% probability of meeting the original deterministic completion date. By incorporating the inherent variability of activity durations, the MCS-derived TPD provides significantly more realistic timeline projections and probabilistic insights. This study demonstrates the potential of MCS in residential construction projects, which remains underutilized in Thailand. Consequently, this research demonstrates a tangible advancement over conventional, deterministic network planning methodologies.