Diana Schrok Bezerra
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Diana Schrok Bezerra has a total of 9 co-authors. Here are the top co-authors by number of shared publications:
- Giuseppe Miceli Junior
Instituto Militar de Engenharia
3 shared publications - Paulo César Pellanda
Instituto Militar de Engenharia
3 shared publications - Marcelo de Miranda Reis
Instituto Militar de Engenharia
2 shared publications Thiago Araújo Fernandes Do Nascimento
Instituto Militar de Engenharia
2 shared publicationsFilipe Almeida Corrêa Do Nascimento
Instituto Militar de Engenharia
1 shared publication- Filipe Almeida Corrêa Do Nascimento
Instituto Militar de Engenharia
1 shared publication
Latest Publications
- Open Access
- 23 September 2026
- Published by Associacao Nacional de Tecnologia do Ambiente Construido (ANTAC) in ENCONTRO NACIONAL DE TECNOLOGIA DO AMBIENTE CONSTRUÍDO
- Vol. 21
BIM, MMC e Sustentabilidade
The literature on Building Information Modelling (BIM), Modern Methods of Construction (MMC), and sustainability still shows limited integration, especially in life-cycle approaches. This study aims to critically analyse this body of scientific literature through a systematic review following PRISMA, with searches in relevant databases and screening supported by Rayyan. The results indicate a predominance of off-site prefabrication, panelised systems, and environmental assessment. BIM mainly acts as a support for coordination, manufacturing, and LCA, with limited incorporation of the social and economic dimensions. As a contribution, the study synthesises gaps and challenges for future research on the topic.
- 23 September 2026
- Published by Associacao Nacional de Tecnologia do Ambiente Construido (ANTAC) in ENCONTRO NACIONAL DE TECNOLOGIA DO AMBIENTE CONSTRUÍDO
- Vol. 21
Open AccessBIM, MMC e Sustentabilidade
The literature on Building Information Modelling (BIM), Modern Methods of Construction (MMC), and sustainability still shows limited integration, especially in life-cycle approaches. This study aims to critically analyse this body of scientific literature through a systematic review following PRISMA, with searches in relevant databases and screening supported by Rayyan. The results indicate a predominance of off-site prefabrication, panelised systems, and environmental assessment. BIM mainly acts as a support for coordination, manufacturing, and LCA, with limited incorporation of the social and economic dimensions. As a contribution, the study synthesises gaps and challenges for future research on the topic.
- Open Access
- 23 September 2026
- Published by Associacao Nacional de Tecnologia do Ambiente Construido (ANTAC) in ENCONTRO NACIONAL DE TECNOLOGIA DO AMBIENTE CONSTRUÍDO
- Vol. 21
Fluxos BIM–LCSA em edificações
The integration of BIM and LCSA is promising for supporting sustainable decision-making in the early design stages, but it remains limited by methodological fragmentation, low interoperability, and partial automation. This study maps BIM–LCSA tools and workflows through a systematic review conducted according to the PRISMA protocol, covering publications from 2020 to 2025 and 47 primary studies. The results indicate a predominance of environmental approaches, dependence on proprietary platforms, partial automation through programming, and a scarcity of regionalized social databases. As a contribution, an eight-step BIM–LCSA workflow is proposed to organize the analyzed workflows and guide future research.
- 23 September 2026
- Published by Associacao Nacional de Tecnologia do Ambiente Construido (ANTAC) in ENCONTRO NACIONAL DE TECNOLOGIA DO AMBIENTE CONSTRUÍDO
- Vol. 21
Open AccessFluxos BIM–LCSA em edificações
The integration of BIM and LCSA is promising for supporting sustainable decision-making in the early design stages, but it remains limited by methodological fragmentation, low interoperability, and partial automation. This study maps BIM–LCSA tools and workflows through a systematic review conducted according to the PRISMA protocol, covering publications from 2020 to 2025 and 47 primary studies. The results indicate a predominance of environmental approaches, dependence on proprietary platforms, partial automation through programming, and a scarcity of regionalized social databases. As a contribution, an eight-step BIM–LCSA workflow is proposed to organize the analyzed workflows and guide future research.
- Open Access
- 6 September 2026
- Published by Associacao Nacional de Tecnologia do Ambiente Construido (ANTAC) in ENCONTRO NACIONAL DE TECNOLOGIA DO AMBIENTE CONSTRUÍDO
- Vol. 21
Mineração de dados aplicada à gestão de contratos de obras públicas
This study uses data mining techniques to identify patterns in public construction contracts, focusing on the relationships among duration, value, amendments, and the profile of the executing agency. Based on a real database of public contracts, the FP-Growth algorithm, from the association rule mining family, was applied in the RapidMiner environment after preprocessing and discretization of continuous variables. The rules obtained, with high support and confidence, indicated greater regularity in small-scale projects executed by specialized agencies, higher incidence of amendments in high-value or long-duration contracts, correlation between time and value amendments, and concentration of these events in specific executing agencies. The study demonstrates the feasibility of data science as support for public administration and contributes objective evidence to improve contract management and control actions.
- 6 September 2026
- Published by Associacao Nacional de Tecnologia do Ambiente Construido (ANTAC) in ENCONTRO NACIONAL DE TECNOLOGIA DO AMBIENTE CONSTRUÍDO
- Vol. 21
Open AccessMineração de dados aplicada à gestão de contratos de obras públicas
This study uses data mining techniques to identify patterns in public construction contracts, focusing on the relationships among duration, value, amendments, and the profile of the executing agency. Based on a real database of public contracts, the FP-Growth algorithm, from the association rule mining family, was applied in the RapidMiner environment after preprocessing and discretization of continuous variables. The rules obtained, with high support and confidence, indicated greater regularity in small-scale projects executed by specialized agencies, higher incidence of amendments in high-value or long-duration contracts, correlation between time and value amendments, and concentration of these events in specific executing agencies. The study demonstrates the feasibility of data science as support for public administration and contributes objective evidence to improve contract management and control actions.