Guangjiong Zou
Guangjiong Zou has a total of 3 co-authors. Here are the top co-authors by number of shared publications:
- Hui Peng
Chongqing Rail Transit Design and Research Institute Co., Ltd Department I of Civil Engineering and Architecture Chongqing
1 shared publication - Jiasong Zhu
Shenzhen University
1 shared publication - Jie Zhou
Chongqing Rail Transit Design and Research Institute Co., Ltd Department I of Civil Engineering and Architecture Chongqing
1 shared publication
Latest Publications
- 17 November 2026
- Published by Emerald Publishing in Civil Engineering
- p. 1-12
Novel construction methods for super-large-section bored tunnels in soft rock strata
The ‘arch-foot first’ principle – a unified design philosophy that prioritises the establishment of a compressive load-transfer path from the primary or secondary lining to the surrounding rock – is proposed in this paper. Two innovative construction methods developed based on this principle for Chongqing Rail Transit, where the main strata are soft rock, are presented. The first method, the bench cut method with expanded arch feet, utilises specially designed heteromorphic arch units to transfer arch loads directly to footwall rock masses, reducing temporary supports and improving construction efficiency by approximately 30% compared with conventional methods, as demonstrated at Hongyancun station. The second method, the arch-cover method with top-down construction, combines the double-side drift method for arch excavation with permanent–temporary integrated support systems and three-dimensional construction organisation, successfully implemented at Min’an Avenue station. Both methods are grounded in the New Austrian Tunnelling Method philosophy, emphasising the self-stabilising capacity of surrounding rocks and spatial constraint effects of excavation faces. Numerical simulations and field practices confirm that these methods effectively control displacement, manage stress redistribution and limit plastic zone development. This paper presents the principles, key technologies, construction sequences, numerical validations and engineering applications of both methods, offering valuable references for similar projects in soft rock regions worldwide.
- 17 November 2026
- Published by Emerald Publishing in Civil Engineering
- p. 1-12
Novel construction methods for super-large-section bored tunnels in soft rock strata
The ‘arch-foot first’ principle – a unified design philosophy that prioritises the establishment of a compressive load-transfer path from the primary or secondary lining to the surrounding rock – is proposed in this paper. Two innovative construction methods developed based on this principle for Chongqing Rail Transit, where the main strata are soft rock, are presented. The first method, the bench cut method with expanded arch feet, utilises specially designed heteromorphic arch units to transfer arch loads directly to footwall rock masses, reducing temporary supports and improving construction efficiency by approximately 30% compared with conventional methods, as demonstrated at Hongyancun station. The second method, the arch-cover method with top-down construction, combines the double-side drift method for arch excavation with permanent–temporary integrated support systems and three-dimensional construction organisation, successfully implemented at Min’an Avenue station. Both methods are grounded in the New Austrian Tunnelling Method philosophy, emphasising the self-stabilising capacity of surrounding rocks and spatial constraint effects of excavation faces. Numerical simulations and field practices confirm that these methods effectively control displacement, manage stress redistribution and limit plastic zone development. This paper presents the principles, key technologies, construction sequences, numerical validations and engineering applications of both methods, offering valuable references for similar projects in soft rock regions worldwide.