East African Journal of Engineering
Published by East African Nature and Science Organization
- Scilit
- Facilities Management
- Asphalt
- Product Engineering
- Power Systems & Electric Vehicles
- Climate Change
- Concrete
Publications Analysis
Publications in 2016-2026
Open Access Publications in 2016-2026
- Total Citations
- 42
- Total Publications
- 41
- Average Citations
- 1.02
- Cited Publications
- 12
- Cited Publications %
- 29.3%
- Self Citations
- 2
- Self Citations %
- 4.8%
- Q1
- 0
- Med
- 1
- Q3
- 2
- 99%
- 33.2
- Max
- 46
- Citing Source Titles
- Citing Publishers
Latest Publications
- Open Access
- 14 July 2026
- Published by East African Nature and Science Organization in East African Journal of Engineering
- Vol. 9 (2) , 488-504
Modelling of a Solar PV-Based Charging System for Electric Three-Wheelers with an AC-to-DC Grid Interface in Dar es Salaam, Tanzania
Electric three-wheelers are a growing source of low-cost transport and income in Dar es Salaam, but long grid charging times and frequent power outages keep them off the road and reduce operators' earnings. This study modelled a charging system in which a roof-mounted solar photovoltaic (PV) module and the 230 V grid act as two independent charging sources for the same 50 Ah/72 V lithium-ion battery. A quantitative design was adopted, combining a cross-sectional field survey with mathematical modelling and simulation. Seventeen operators were selected by purposive sampling at six frequently used charging points and gave written informed consent before taking part. Field data on charging behaviour were collected through a structured questionnaire, observation and multimeter measurements, and ten years of NASA POWER solar data were used to characterise the solar resource. Five mathematical models were developed for the PV array, the MPPT boost charge controller, the grid charger, the vehicle load and battery dispatch, and were simulated in Python. Operators charged two to three times a day for 2–4 hours per session, with a mean daily charging energy of 6.56 kWh per vehicle. Dar es Salaam receives a mean global solar radiation of 5.63 kWh/m²/day, but the 2.948 m² vehicle roof limits the design to one 600 W module. This module delivered 2.05–2.93 kWh/day of usable energy to the battery, covering 57% (April) to 81% (October) of one 3.6 kWh charging session; the whole seasonal spread was caused by monthly solar radiation. Grid-only charging took the battery from 20% to 100% state of charge in 4.65 hours, including a one-hour outage, whereas PV-only charging reached 92.9% after a 12-hour day but continued during the outage. Simulated grid charging times agreed with field measurements, with a mean absolute error of 0.67 h. A single roof-mounted module cannot replace the grid, but it reduces grid dependence and keeps charging during outages, supporting hybrid PV-grid charging for electric three-wheelers in Tanzania.
- 14 July 2026
- Published by East African Nature and Science Organization in East African Journal of Engineering
- Vol. 9 (2) , 488-504
Open AccessModelling of a Solar PV-Based Charging System for Electric Three-Wheelers with an AC-to-DC Grid Interface in Dar es Salaam, Tanzania
Electric three-wheelers are a growing source of low-cost transport and income in Dar es Salaam, but long grid charging times and frequent power outages keep them off the road and reduce operators' earnings. This study modelled a charging system in which a roof-mounted solar photovoltaic (PV) module and the 230 V grid act as two independent charging sources for the same 50 Ah/72 V lithium-ion battery. A quantitative design was adopted, combining a cross-sectional field survey with mathematical modelling and simulation. Seventeen operators were selected by purposive sampling at six frequently used charging points and gave written informed consent before taking part. Field data on charging behaviour were collected through a structured questionnaire, observation and multimeter measurements, and ten years of NASA POWER solar data were used to characterise the solar resource. Five mathematical models were developed for the PV array, the MPPT boost charge controller, the grid charger, the vehicle load and battery dispatch, and were simulated in Python. Operators charged two to three times a day for 2–4 hours per session, with a mean daily charging energy of 6.56 kWh per vehicle. Dar es Salaam receives a mean global solar radiation of 5.63 kWh/m²/day, but the 2.948 m² vehicle roof limits the design to one 600 W module. This module delivered 2.05–2.93 kWh/day of usable energy to the battery, covering 57% (April) to 81% (October) of one 3.6 kWh charging session; the whole seasonal spread was caused by monthly solar radiation. Grid-only charging took the battery from 20% to 100% state of charge in 4.65 hours, including a one-hour outage, whereas PV-only charging reached 92.9% after a 12-hour day but continued during the outage. Simulated grid charging times agreed with field measurements, with a mean absolute error of 0.67 h. A single roof-mounted module cannot replace the grid, but it reduces grid dependence and keeps charging during outages, supporting hybrid PV-grid charging for electric three-wheelers in Tanzania.
- Open Access
- 14 July 2026
- Published by East African Nature and Science Organization in East African Journal of Engineering
- Vol. 9 (2) , 477-487
Modelling Maintenance Factors Affecting the Availability Performance of Passenger Handling Equipment at Julius Nyerere International Airport, Tanzania
Passenger handling equipment (PHE, such as baggage handling systems, passenger boarding bridges, lifts, escalators and self-check-in kiosks, is important for safety and efficient airport operations. This paper considers maintenance factors that contribute to PHE availability at Julius Nyerere International Airport (JNIA), Tanzania, and develops a regression-based simulation model from usable factor ratings derived from a questionnaire. A combination of methods was used. Using documentary review to provide context, data were collected from 60 airport-related respondents via questionnaires and interviews. Relative Importance Index (RII) was utilised, and the one-sample Wilcoxon signed-rank test was performed. Eight factors retained for study wear and tear (RII =0.937), spare-parts unavailability (0.913), power interruptions (0.877), equipment age (0.847), electrical component damage (0.820), control faults (0.787), design reliability (0.757) and overloading (0.727) Enhanced Availability Performance Index (EAPI) is fitted with Multiple regression with R² values of 0.9682, 0.9667 and 0.9183 for training, validation and test partitions respectively. That means the model is reconstructing a survey-based index and not independently predicting measured operational availability. These findings yield a ranked maintenance-factor profile for JNIA and provide a modelling basis that can be explored but needs validation against an equipment-level operating and downtime record.
- 14 July 2026
- Published by East African Nature and Science Organization in East African Journal of Engineering
- Vol. 9 (2) , 477-487
Open AccessModelling Maintenance Factors Affecting the Availability Performance of Passenger Handling Equipment at Julius Nyerere International Airport, Tanzania
Passenger handling equipment (PHE, such as baggage handling systems, passenger boarding bridges, lifts, escalators and self-check-in kiosks, is important for safety and efficient airport operations. This paper considers maintenance factors that contribute to PHE availability at Julius Nyerere International Airport (JNIA), Tanzania, and develops a regression-based simulation model from usable factor ratings derived from a questionnaire. A combination of methods was used. Using documentary review to provide context, data were collected from 60 airport-related respondents via questionnaires and interviews. Relative Importance Index (RII) was utilised, and the one-sample Wilcoxon signed-rank test was performed. Eight factors retained for study wear and tear (RII =0.937), spare-parts unavailability (0.913), power interruptions (0.877), equipment age (0.847), electrical component damage (0.820), control faults (0.787), design reliability (0.757) and overloading (0.727) Enhanced Availability Performance Index (EAPI) is fitted with Multiple regression with R² values of 0.9682, 0.9667 and 0.9183 for training, validation and test partitions respectively. That means the model is reconstructing a survey-based index and not independently predicting measured operational availability. These findings yield a ranked maintenance-factor profile for JNIA and provide a modelling basis that can be explored but needs validation against an equipment-level operating and downtime record.
- Open Access
- 14 July 2026
- Published by East African Nature and Science Organization in East African Journal of Engineering
- Vol. 9 (2) , 464-476
Development of a Pavement Condition Prediction Model to Enhance Maintainability Performance of Paved Roads: A Case of TARURA Mwanga District, Kilimanjaro
Paved road maintenance in the Tanzania Rural and Urban Roads Agency (TARURA) Mwanga District is largely reactive because the district has no locally calibrated model that links the drivers of deterioration to pavement condition. Only 18% of the 75-km paved network is in good condition, while 54% is in poor or very poor condition. This study developed and validated a Pavement Condition Prediction Model for the district's paved roads. A cross-sectional case-study design was used. Seventy-seven of 100 TARURA Mwanga staff rated fourteen candidate factors, which were ranked using the Relative Importance Index (RII). Seven factors met the RII ≥ 0.725 threshold, led by surface distress severity (0.961), traffic volume and cumulative axle load (0.927) and vehicle overloading (0.894). A dataset of 77 road-segment observations, each pairing a field-measured Pavement Condition Index (PCI) with segment-level ratings of the seven factors, was split 70:30 into training (n = 53) and testing (n = 24) sets and analysed by multiple linear regression. The fitted model was significant (F = 24.18, p < 0.001) and explained 79.0% of the variance in PCI on the training set (adjusted R² = 0.757). On the independent testing set, it achieved R² = 0.836, RMSE = 8.94 and MAE = 6.82 PCI units; five-fold cross-validation gave a mean R² of 0.750 (SD = 0.060), and 75% of test predictions fell in the correct condition class, with all within one class. Maintenance budget adequacy had the largest coefficient (+8.13 PCI units per rating level), larger than any single deterioration factor. Because the predictors are expert ratings and the model is cross-sectional, it should be used as a screening and prioritisation tool and recalibrated with measured inputs as condition data accumulate. The study recommends that TARURA Mwanga District adopt the model to support a shift from reactive to evidence-based, predictive road maintenance.
- 14 July 2026
- Published by East African Nature and Science Organization in East African Journal of Engineering
- Vol. 9 (2) , 464-476
Open AccessDevelopment of a Pavement Condition Prediction Model to Enhance Maintainability Performance of Paved Roads: A Case of TARURA Mwanga District, Kilimanjaro
Paved road maintenance in the Tanzania Rural and Urban Roads Agency (TARURA) Mwanga District is largely reactive because the district has no locally calibrated model that links the drivers of deterioration to pavement condition. Only 18% of the 75-km paved network is in good condition, while 54% is in poor or very poor condition. This study developed and validated a Pavement Condition Prediction Model for the district's paved roads. A cross-sectional case-study design was used. Seventy-seven of 100 TARURA Mwanga staff rated fourteen candidate factors, which were ranked using the Relative Importance Index (RII). Seven factors met the RII ≥ 0.725 threshold, led by surface distress severity (0.961), traffic volume and cumulative axle load (0.927) and vehicle overloading (0.894). A dataset of 77 road-segment observations, each pairing a field-measured Pavement Condition Index (PCI) with segment-level ratings of the seven factors, was split 70:30 into training (n = 53) and testing (n = 24) sets and analysed by multiple linear regression. The fitted model was significant (F = 24.18, p < 0.001) and explained 79.0% of the variance in PCI on the training set (adjusted R² = 0.757). On the independent testing set, it achieved R² = 0.836, RMSE = 8.94 and MAE = 6.82 PCI units; five-fold cross-validation gave a mean R² of 0.750 (SD = 0.060), and 75% of test predictions fell in the correct condition class, with all within one class. Maintenance budget adequacy had the largest coefficient (+8.13 PCI units per rating level), larger than any single deterioration factor. Because the predictors are expert ratings and the model is cross-sectional, it should be used as a screening and prioritisation tool and recalibrated with measured inputs as condition data accumulate. The study recommends that TARURA Mwanga District adopt the model to support a shift from reactive to evidence-based, predictive road maintenance.
- Open Access
- 14 July 2026
- Published by East African Nature and Science Organization in East African Journal of Engineering
- Vol. 9 (2) , 448-463
Development of a Maintenance Management Framework for Evaluating Factors Affecting Defect Occurrence in Public Buildings: Evidence from Itilima District, Tanzania
Public buildings in many Tanzanian local government authorities deteriorate prematurely because maintenance is reactive and weakly prioritised. This study developed and validated a framework for evaluating maintenance factors affecting defect occurrence in public buildings in Itilima District, Simiyu Region. Three specific objectives guided the work: (i) to identify and rank the maintenance factors affecting defect occurrence in public buildings; (ii) to develop a model for assessing maintenance risk at building level; and (iii) to validate a practical framework for evaluating maintenance factors and supporting maintenance prioritisation. A cross-sectional mixed-methods design combined a questionnaire completed by 28 of 32 targeted maintenance professionals (88%) with physical condition audits of 42 of 52 sampled public buildings (81%). Twelve factors were ranked using the Relative Importance Index (RII), and four were combined into an RII-weighted risk index. Of the audited buildings, 21.4% were in good, 42.9% in fair and 35.7% in poor condition. Inadequate funding, lack of written maintenance policies and occupant negligence or delayed reporting tied as the highest-ranked factors (RII = 0.929 each), followed by lack of staff training (RII = 0.921), whereas substandard repair materials ranked lowest (RII = 0.550). Peeling paint and dampness were the most frequent defects (RII = 0.886), and the composite Defect Occurrence Index was 4.071 on a five-point scale. Normalising the RII values gave weights of 0.278 each for budgetary deficits, absence of maintenance guidelines and delayed reporting, and 0.165 for substandard materials. The framework scores each building from 1 to 5 on these inputs, classifies the weighted index into Green (< 2.5), Amber (2.5–3.8) and Red (> 3.8) tiers, links each tier to prioritised actions and feeds results back through a monitoring loop. In five illustrative profiles, the index ranged from 1.00 to 5.00, and tier assignments were unchanged under equal weighting. Expert ratings produced a Composite Validation Index of 4.295 out of 5 (RII = 0.859), with accuracy rated highest (RII = 0.907). The framework gives district engineers a transparent basis for risk screening and maintenance budget prioritisation, subject to field calibration.
- 14 July 2026
- Published by East African Nature and Science Organization in East African Journal of Engineering
- Vol. 9 (2) , 448-463
Open AccessDevelopment of a Maintenance Management Framework for Evaluating Factors Affecting Defect Occurrence in Public Buildings: Evidence from Itilima District, Tanzania
Public buildings in many Tanzanian local government authorities deteriorate prematurely because maintenance is reactive and weakly prioritised. This study developed and validated a framework for evaluating maintenance factors affecting defect occurrence in public buildings in Itilima District, Simiyu Region. Three specific objectives guided the work: (i) to identify and rank the maintenance factors affecting defect occurrence in public buildings; (ii) to develop a model for assessing maintenance risk at building level; and (iii) to validate a practical framework for evaluating maintenance factors and supporting maintenance prioritisation. A cross-sectional mixed-methods design combined a questionnaire completed by 28 of 32 targeted maintenance professionals (88%) with physical condition audits of 42 of 52 sampled public buildings (81%). Twelve factors were ranked using the Relative Importance Index (RII), and four were combined into an RII-weighted risk index. Of the audited buildings, 21.4% were in good, 42.9% in fair and 35.7% in poor condition. Inadequate funding, lack of written maintenance policies and occupant negligence or delayed reporting tied as the highest-ranked factors (RII = 0.929 each), followed by lack of staff training (RII = 0.921), whereas substandard repair materials ranked lowest (RII = 0.550). Peeling paint and dampness were the most frequent defects (RII = 0.886), and the composite Defect Occurrence Index was 4.071 on a five-point scale. Normalising the RII values gave weights of 0.278 each for budgetary deficits, absence of maintenance guidelines and delayed reporting, and 0.165 for substandard materials. The framework scores each building from 1 to 5 on these inputs, classifies the weighted index into Green (< 2.5), Amber (2.5–3.8) and Red (> 3.8) tiers, links each tier to prioritised actions and feeds results back through a monitoring loop. In five illustrative profiles, the index ranged from 1.00 to 5.00, and tier assignments were unchanged under equal weighting. Expert ratings produced a Composite Validation Index of 4.295 out of 5 (RII = 0.859), with accuracy rated highest (RII = 0.907). The framework gives district engineers a transparent basis for risk screening and maintenance budget prioritisation, subject to field calibration.
- Open Access
- 14 July 2026
- Published by East African Nature and Science Organization in East African Journal of Engineering
- Vol. 9 (2) , 434-447
Development of a Road Marking Performance Prediction Model to Enhance Maintenance Management of District Roads: The Case of Kigamboni District, Tanzania
Road markings guide vehicle positioning, delineate pedestrian zones, and provide visual guidance at night and in poor weather, yet their maintenance on district roads in Tanzania remains largely reactive. In Kigamboni District, rapid urban growth and rising traffic combine with salt-laden coastal air, high humidity, heavy seasonal rainfall, and sandy soils to accelerate marking deterioration, while the Tanzania Rural and Urban Roads Agency (TARURA) relies on visual inspection and emergency repainting without a predictive tool. This study developed and internally validated a road marking performance prediction model for paved district roads in Kigamboni District. A quantitative-dominant mixed-methods design was adopted. Thirty road maintenance professionals rated fourteen candidate parameters, and the Relative Importance Index (RII) was used to rank them, with a cut-off of 0.72 for retention. Thirty road segments were then assessed on a standardised five-point condition scale to produce a condition-based Road Visibility Performance (RVP) index on a 0–100 scale. Eight parameters were retained: marking material type, coastal proximity distance, average daily traffic, surface texture depth, marking age, sandy soil contamination index, pavement condition index, and annual rainfall total. A multiple linear regression model fitted to 21 segments achieved R² = 0.9965 (adjusted R² = 0.9942), RMSE = 1.40% and MAE = 1.02%. On nine hold-out segments, the model returned R² = 0.9745, RMSE = 3.23%, MAE = 2.10% and MAPE = 3.25%, meeting all acceptance thresholds. Pavement condition, material type, rainfall exposure and traffic carried the largest coefficients, showing that visibility performance results from the combined effect of material quality, pavement support, traffic and coastal exposure. A five-class performance framework translates predictions into maintenance actions, offering TARURA a practical basis for moving from reactive to risk-prioritised marking maintenance, subject to external validation with instrument-based retroreflectivity data.
- 14 July 2026
- Published by East African Nature and Science Organization in East African Journal of Engineering
- Vol. 9 (2) , 434-447
Open AccessDevelopment of a Road Marking Performance Prediction Model to Enhance Maintenance Management of District Roads: The Case of Kigamboni District, Tanzania
Road markings guide vehicle positioning, delineate pedestrian zones, and provide visual guidance at night and in poor weather, yet their maintenance on district roads in Tanzania remains largely reactive. In Kigamboni District, rapid urban growth and rising traffic combine with salt-laden coastal air, high humidity, heavy seasonal rainfall, and sandy soils to accelerate marking deterioration, while the Tanzania Rural and Urban Roads Agency (TARURA) relies on visual inspection and emergency repainting without a predictive tool. This study developed and internally validated a road marking performance prediction model for paved district roads in Kigamboni District. A quantitative-dominant mixed-methods design was adopted. Thirty road maintenance professionals rated fourteen candidate parameters, and the Relative Importance Index (RII) was used to rank them, with a cut-off of 0.72 for retention. Thirty road segments were then assessed on a standardised five-point condition scale to produce a condition-based Road Visibility Performance (RVP) index on a 0–100 scale. Eight parameters were retained: marking material type, coastal proximity distance, average daily traffic, surface texture depth, marking age, sandy soil contamination index, pavement condition index, and annual rainfall total. A multiple linear regression model fitted to 21 segments achieved R² = 0.9965 (adjusted R² = 0.9942), RMSE = 1.40% and MAE = 1.02%. On nine hold-out segments, the model returned R² = 0.9745, RMSE = 3.23%, MAE = 2.10% and MAPE = 3.25%, meeting all acceptance thresholds. Pavement condition, material type, rainfall exposure and traffic carried the largest coefficients, showing that visibility performance results from the combined effect of material quality, pavement support, traffic and coastal exposure. A five-class performance framework translates predictions into maintenance actions, offering TARURA a practical basis for moving from reactive to risk-prioritised marking maintenance, subject to external validation with instrument-based retroreflectivity data.
- Open Access
- 14 July 2026
- Published by East African Nature and Science Organization in East African Journal of Engineering
- Vol. 9 (2) , 418-433
Development of a Predictive Maintenance Management Model for Enhancing the Performance of Inland Container Depot Pavement Slabs: A Case of Dar es Salaam Dry Ports
Pavement slabs at Inland Container Depots (ICDs) carry some of the heaviest and slowest loads in the logistics chain, yet at the Dar es Salaam dry ports their maintenance remains largely reactive, resulting in premature distress, unplanned downtime, and high life-cycle costs. Construction quality and maintenance records for 2020–2024 exist but have not been used to predict pavement performance, and no validated model is available for ICD pavements. This study developed and validated a predictive maintenance management model for ICD pavement slabs at the Dar es Salaam dry ports. A quantitative, cross-sectional design was adopted. Fifty pavement sections were selected by stratified random sampling and rated on fourteen candidate deterioration factors using field tests and calibrated five-point descriptors, supported by a structured questionnaire administered to ICD key informants and a review of 55 maintenance records. The factors were ranked with the Relative Importance Index (RII), and those with an RII of at least 0.70 were entered into an ordinary least squares multiple linear regression model calibrated on 35 sections and tested on 15 holdout sections. Eight factors were retained: compaction level (RII = 0.932), axle load magnitude, container throughput volume, subgrade bearing capacity, heavy vehicle frequency, pavement layer thickness, material quality and workmanship, and maintenance frequency, whereas the environmental factors, container stacking load, and time since last maintenance ranked low. The model explained 98.1% of the variance in the training data (adjusted R² = 0.975; F = 170.0; p < 0.001), and its predictions agreed closely with observed values. Traffic-demand factors reduced performance, while compaction, structural capacity, material quality, and maintenance frequency improved it. Scenario analysis produced predictions from 12.34% to 94.74% that fell consistently within the expected performance bands. The model gives ICD operators an interpretable tool for prioritising sections, scheduling preventive maintenance and allocating budgets.
- 14 July 2026
- Published by East African Nature and Science Organization in East African Journal of Engineering
- Vol. 9 (2) , 418-433
Open AccessDevelopment of a Predictive Maintenance Management Model for Enhancing the Performance of Inland Container Depot Pavement Slabs: A Case of Dar es Salaam Dry Ports
Pavement slabs at Inland Container Depots (ICDs) carry some of the heaviest and slowest loads in the logistics chain, yet at the Dar es Salaam dry ports their maintenance remains largely reactive, resulting in premature distress, unplanned downtime, and high life-cycle costs. Construction quality and maintenance records for 2020–2024 exist but have not been used to predict pavement performance, and no validated model is available for ICD pavements. This study developed and validated a predictive maintenance management model for ICD pavement slabs at the Dar es Salaam dry ports. A quantitative, cross-sectional design was adopted. Fifty pavement sections were selected by stratified random sampling and rated on fourteen candidate deterioration factors using field tests and calibrated five-point descriptors, supported by a structured questionnaire administered to ICD key informants and a review of 55 maintenance records. The factors were ranked with the Relative Importance Index (RII), and those with an RII of at least 0.70 were entered into an ordinary least squares multiple linear regression model calibrated on 35 sections and tested on 15 holdout sections. Eight factors were retained: compaction level (RII = 0.932), axle load magnitude, container throughput volume, subgrade bearing capacity, heavy vehicle frequency, pavement layer thickness, material quality and workmanship, and maintenance frequency, whereas the environmental factors, container stacking load, and time since last maintenance ranked low. The model explained 98.1% of the variance in the training data (adjusted R² = 0.975; F = 170.0; p < 0.001), and its predictions agreed closely with observed values. Traffic-demand factors reduced performance, while compaction, structural capacity, material quality, and maintenance frequency improved it. Scenario analysis produced predictions from 12.34% to 94.74% that fell consistently within the expected performance bands. The model gives ICD operators an interpretable tool for prioritising sections, scheduling preventive maintenance and allocating budgets.
- Open Access
- 14 July 2026
- Published by East African Nature and Science Organization in East African Journal of Engineering
- Vol. 9 (2) , 403-417
Development of a Contractor Performance Tracking Model to Enhance Maintainability Performance of District Roads: A Case of Arumeru District, Tanzania
Road maintenance in Tanzania is increasingly delivered by private contractors, but their performance is inconsistent and is assessed through ad hoc, subjective supervision. In Arumeru District, the Tanzania Rural and Urban Roads Agency (TARURA) manages about 1,451 km of roads without a systematic model linking contractor performance to road maintainability. Drawing on the resource-based view of the firm, this study developed and tested a contractor performance tracking model for TARURA in Arumeru District. A quantitative case study design was adopted. The dataset comprised 166 observations: questionnaire responses from 73 contractors in Contractors Registration Board Classes I–VII and 20 TARURA technical staff, and a documentary review of 73 road maintenance projects executed in 2020–2025. Twelve technical factors were ranked using the Relative Importance Index (RII). Seven met the threshold of RII ≥ 0.75, led by quality control procedures (0.869), compliance with materials standards (0.860) and technical qualification (0.857); all seven are human-capital or organisational capabilities, whereas equipment availability, a resource that can be hired, ranked lowest (0.331). The seven factors were used as predictors in a multiple linear regression model. Because recorded maintainability outcomes were not available for every observation, the dependent variable used for estimation was simulated from the factor ratings with random error, and the procedure was tested on a 70/30 training–test split (R² = 0.856 and 0.867), which shows that the estimation is stable but does not measure accuracy on real roads. In a preliminary field check, the model ranked five contractors in the same order as their recorded performance scores and placed each in the same performance class, but over-predicted every score by 1.9–4.5 percentage points. The model is a transparent scoring tool that TARURA can pilot for contractor monitoring; it must be re-estimated and validated with recorded maintainability outcomes from a larger sample that includes average and poor performers before it is used for pre-qualification or contract award.
- 14 July 2026
- Published by East African Nature and Science Organization in East African Journal of Engineering
- Vol. 9 (2) , 403-417
Open AccessDevelopment of a Contractor Performance Tracking Model to Enhance Maintainability Performance of District Roads: A Case of Arumeru District, Tanzania
Road maintenance in Tanzania is increasingly delivered by private contractors, but their performance is inconsistent and is assessed through ad hoc, subjective supervision. In Arumeru District, the Tanzania Rural and Urban Roads Agency (TARURA) manages about 1,451 km of roads without a systematic model linking contractor performance to road maintainability. Drawing on the resource-based view of the firm, this study developed and tested a contractor performance tracking model for TARURA in Arumeru District. A quantitative case study design was adopted. The dataset comprised 166 observations: questionnaire responses from 73 contractors in Contractors Registration Board Classes I–VII and 20 TARURA technical staff, and a documentary review of 73 road maintenance projects executed in 2020–2025. Twelve technical factors were ranked using the Relative Importance Index (RII). Seven met the threshold of RII ≥ 0.75, led by quality control procedures (0.869), compliance with materials standards (0.860) and technical qualification (0.857); all seven are human-capital or organisational capabilities, whereas equipment availability, a resource that can be hired, ranked lowest (0.331). The seven factors were used as predictors in a multiple linear regression model. Because recorded maintainability outcomes were not available for every observation, the dependent variable used for estimation was simulated from the factor ratings with random error, and the procedure was tested on a 70/30 training–test split (R² = 0.856 and 0.867), which shows that the estimation is stable but does not measure accuracy on real roads. In a preliminary field check, the model ranked five contractors in the same order as their recorded performance scores and placed each in the same performance class, but over-predicted every score by 1.9–4.5 percentage points. The model is a transparent scoring tool that TARURA can pilot for contractor monitoring; it must be re-estimated and validated with recorded maintainability outcomes from a larger sample that includes average and poor performers before it is used for pre-qualification or contract award.
- Open Access
- 14 July 2026
- Published by East African Nature and Science Organization in East African Journal of Engineering
- Vol. 9 (2) , 389-402
Development of a Structural Condition Predictive Model for Bituminous Surfaced Pavements Using Falling Weight Deflectometer Data: A Case of Bagamoyo Road, Tanzania
Maintenance of flexible pavements on Tanzania's trunk roads is still planned mainly from visual condition surveys, which detect deterioration only after it reaches the surface. On Bagamoyo Road, a heavily trafficked corridor managed by the Tanzania National Roads Agency (TANROADS) Coast Region, Falling Weight Deflectometer (FWD) testing has been used only for ad hoc investigations, and no locally calibrated model exists to translate deflection data into structural condition and maintenance decisions. This study developed and validated a structural condition predictive model for bituminous surfaced pavements on the road. A mixed-methods design was adopted. Primary data were collected through FWD testing, pavement coring, traffic counts, visual distress surveys and a questionnaire administered to 44 of the 50 pavement professionals in the study population, all of whom responded, and secondary data were drawn from TANROADS FWD records for 2019–2024. Ten candidate factors were ranked using the Relative Importance Index (RII). Eight were significant, led by traffic loading (RII = 0.927), layer moduli (0.918) and FWD deflection parameters (0.886), while asphalt material properties and moisture and seasonal variation were not. A multiple linear regression model relating the eight factors to a Pavement Utilisation Index (PUI) was calibrated on 35 pavement test sections and explained 99.0% of the variation in the PUI (adjusted R² = 0.987; F = 335.3; p < 0.001; RMSE = 1.86 percentage points). All eight coefficients were positive and significant, with traffic loading having the largest effect (β = 4.09), followed by layer moduli and FWD deflection. On nine hold-out sections not used in calibration, the model achieved R² = 0.910, RMSE = 1.82 and MAE = 1.51 percentage points, and assigned all nine sections to the correct condition band. Combining FWD-derived structural parameters with expert-ranked factors provides TANROADS with a transparent tool for structural condition assessment, which the agency should adopt for decision support, backed by routine FWD testing, stronger axle-load enforcement and staff training.
- 14 July 2026
- Published by East African Nature and Science Organization in East African Journal of Engineering
- Vol. 9 (2) , 389-402
Open AccessDevelopment of a Structural Condition Predictive Model for Bituminous Surfaced Pavements Using Falling Weight Deflectometer Data: A Case of Bagamoyo Road, Tanzania
Maintenance of flexible pavements on Tanzania's trunk roads is still planned mainly from visual condition surveys, which detect deterioration only after it reaches the surface. On Bagamoyo Road, a heavily trafficked corridor managed by the Tanzania National Roads Agency (TANROADS) Coast Region, Falling Weight Deflectometer (FWD) testing has been used only for ad hoc investigations, and no locally calibrated model exists to translate deflection data into structural condition and maintenance decisions. This study developed and validated a structural condition predictive model for bituminous surfaced pavements on the road. A mixed-methods design was adopted. Primary data were collected through FWD testing, pavement coring, traffic counts, visual distress surveys and a questionnaire administered to 44 of the 50 pavement professionals in the study population, all of whom responded, and secondary data were drawn from TANROADS FWD records for 2019–2024. Ten candidate factors were ranked using the Relative Importance Index (RII). Eight were significant, led by traffic loading (RII = 0.927), layer moduli (0.918) and FWD deflection parameters (0.886), while asphalt material properties and moisture and seasonal variation were not. A multiple linear regression model relating the eight factors to a Pavement Utilisation Index (PUI) was calibrated on 35 pavement test sections and explained 99.0% of the variation in the PUI (adjusted R² = 0.987; F = 335.3; p < 0.001; RMSE = 1.86 percentage points). All eight coefficients were positive and significant, with traffic loading having the largest effect (β = 4.09), followed by layer moduli and FWD deflection. On nine hold-out sections not used in calibration, the model achieved R² = 0.910, RMSE = 1.82 and MAE = 1.51 percentage points, and assigned all nine sections to the correct condition band. Combining FWD-derived structural parameters with expert-ranked factors provides TANROADS with a transparent tool for structural condition assessment, which the agency should adopt for decision support, backed by routine FWD testing, stronger axle-load enforcement and staff training.
- Open Access
- 14 July 2026
- Published by East African Nature and Science Organization in East African Journal of Engineering
- Vol. 9 (2) , 375-388
Development of Eco-Roads Pavement Condition Prediction Model to Enhance Maintenance Management: A Case of Rufiji District, Tanzania
Eco-roads, built with stabilised local soils, laterite and recycled aggregates, offer a low-cost and lower-carbon way of improving rural access, but their maintenance in Tanzania remains reactive because no model predicts how they deteriorate. Existing prediction models, such as the AASHTO serviceability model and the HDM-4 deterioration relationships, were developed for conventional pavements and do not include stabiliser type and dosage, construction quality or wet–dry seasonal cycling. This study developed and validated an eco-road pavement condition prediction model for Rufiji District, Coast Region, Tanzania. A mixed-methods embedded design was adopted. A structured questionnaire was administered to a stratified random sample of 80 of the 100 stakeholders in five groups, a sample size confirmed by Yamane’s formula, the Krejcie and Morgan table and a statistical power analysis, and supported by road condition records, document review and key-informant interviews. The Relative Importance Index (RII) identified nine significant factors out of fourteen: axle load and overloading (0.93), pothole density and severity (0.91), rutting (0.89), subgrade California Bearing Ratio (CBR) (0.87), traffic volume (0.85), stabiliser type and dosage (0.83), compaction quality (0.82), annual rainfall intensity (0.79) and wet–dry seasonal cycles (0.76). A multiple linear regression model of the nine factors, calibrated on 56 observations, explained 92.7% of the variation in recorded pavement condition (adjusted R² = 0.912; F(9, 46) = 64.72; p < 0.001). Subgrade CBR, compaction quality and stabiliser type and dosage improved the condition, whereas traffic, rutting and wet–dry cycling reduced it. On 24 withheld observations, the model achieved R² = 0.868, a root mean square error of 5.81 percentage points and a mean absolute percentage error of 8.40%, and five-fold cross-validation gave a mean R² of 0.877. The model offers TARURA a transparent tool for ranking eco-road sections for preventive maintenance using inputs that district staff can obtain without costly equipment. Axle-load control, subgrade investigation, compaction and stabiliser quality control, and longitudinal condition monitoring to add a time term are recommended.
- 14 July 2026
- Published by East African Nature and Science Organization in East African Journal of Engineering
- Vol. 9 (2) , 375-388
Open AccessDevelopment of Eco-Roads Pavement Condition Prediction Model to Enhance Maintenance Management: A Case of Rufiji District, Tanzania
Eco-roads, built with stabilised local soils, laterite and recycled aggregates, offer a low-cost and lower-carbon way of improving rural access, but their maintenance in Tanzania remains reactive because no model predicts how they deteriorate. Existing prediction models, such as the AASHTO serviceability model and the HDM-4 deterioration relationships, were developed for conventional pavements and do not include stabiliser type and dosage, construction quality or wet–dry seasonal cycling. This study developed and validated an eco-road pavement condition prediction model for Rufiji District, Coast Region, Tanzania. A mixed-methods embedded design was adopted. A structured questionnaire was administered to a stratified random sample of 80 of the 100 stakeholders in five groups, a sample size confirmed by Yamane’s formula, the Krejcie and Morgan table and a statistical power analysis, and supported by road condition records, document review and key-informant interviews. The Relative Importance Index (RII) identified nine significant factors out of fourteen: axle load and overloading (0.93), pothole density and severity (0.91), rutting (0.89), subgrade California Bearing Ratio (CBR) (0.87), traffic volume (0.85), stabiliser type and dosage (0.83), compaction quality (0.82), annual rainfall intensity (0.79) and wet–dry seasonal cycles (0.76). A multiple linear regression model of the nine factors, calibrated on 56 observations, explained 92.7% of the variation in recorded pavement condition (adjusted R² = 0.912; F(9, 46) = 64.72; p < 0.001). Subgrade CBR, compaction quality and stabiliser type and dosage improved the condition, whereas traffic, rutting and wet–dry cycling reduced it. On 24 withheld observations, the model achieved R² = 0.868, a root mean square error of 5.81 percentage points and a mean absolute percentage error of 8.40%, and five-fold cross-validation gave a mean R² of 0.877. The model offers TARURA a transparent tool for ranking eco-road sections for preventive maintenance using inputs that district staff can obtain without costly equipment. Axle-load control, subgrade investigation, compaction and stabiliser quality control, and longitudinal condition monitoring to add a time term are recommended.
- Open Access
- 14 July 2026
- Published by East African Nature and Science Organization in East African Journal of Engineering
- Vol. 9 (2) , 358-374
Development of a Maintenance Management Prioritisation Model to Enhance the Performance of District Roads: A Case of TARURA Wanging'ombe District, Tanzania
District roads managed by the Tanzania Rural and Urban Roads Agency (TARURA) in Wanging'ombe District are maintained reactively: about 75% of the annual maintenance budget is spent on emergency repairs, while two-thirds of the 1,045.87 km network is in poor or very poor condition. This study developed and validated a maintenance prioritisation model for these roads using an explanatory sequential mixed-methods design. Fifty-six TARURA staff rated fifteen technical indicators, and the eight with a Relative Importance Index (RII) of at least 0.75 were retained, led by the pavement distress index, drainage adequacy and safety hazards. The eight factors were scored from 1 to 5 on 56 road segments of 500 m, which were randomly divided into a calibration set (39), a testing set (8) and a validation set (9). A multiple linear regression model calibrated on the 39 segments had positive and significant coefficients for all eight factors (p < 0.001). Its very high training fit (R² = 0.998) partly reflects the fact that the predictors and road performance were assessed in the same field survey. The model kept its accuracy on the testing (R² = 0.990) and validation (R² = 0.995) sets and placed all 17 held-out segments in their field-assessed performance band. The model offers TARURA Wanging'ombe an objective, equipment-free tool for ranking district roads; its use in other districts requires recalibration and validation against independent condition measurements.
- 14 July 2026
- Published by East African Nature and Science Organization in East African Journal of Engineering
- Vol. 9 (2) , 358-374
Open AccessDevelopment of a Maintenance Management Prioritisation Model to Enhance the Performance of District Roads: A Case of TARURA Wanging'ombe District, Tanzania
District roads managed by the Tanzania Rural and Urban Roads Agency (TARURA) in Wanging'ombe District are maintained reactively: about 75% of the annual maintenance budget is spent on emergency repairs, while two-thirds of the 1,045.87 km network is in poor or very poor condition. This study developed and validated a maintenance prioritisation model for these roads using an explanatory sequential mixed-methods design. Fifty-six TARURA staff rated fifteen technical indicators, and the eight with a Relative Importance Index (RII) of at least 0.75 were retained, led by the pavement distress index, drainage adequacy and safety hazards. The eight factors were scored from 1 to 5 on 56 road segments of 500 m, which were randomly divided into a calibration set (39), a testing set (8) and a validation set (9). A multiple linear regression model calibrated on the 39 segments had positive and significant coefficients for all eight factors (p < 0.001). Its very high training fit (R² = 0.998) partly reflects the fact that the predictors and road performance were assessed in the same field survey. The model kept its accuracy on the testing (R² = 0.990) and validation (R² = 0.995) sets and placed all 17 held-out segments in their field-assessed performance band. The model offers TARURA Wanging'ombe an objective, equipment-free tool for ranking district roads; its use in other districts requires recalibration and validation against independent condition measurements.