Rekayasa Sipil
Published by Brawijaya University
- Scilit
- DOAJ
- Concrete
- Product Engineering
- Transportation
- Geotechnical Engineering
- Sustainability Studies
- Climate Change
Publications Analysis
Publications in 2016-2026
Open Access Publications in 2016-2026
- Total Citations
- 40
- Total Publications
- 86
- Average Citations
- 0.47
- Cited Publications
- 27
- Cited Publications %
- 31.4%
- Self Citations
- 0
- Self Citations %
- 0%
- Q1
- 0
- Med
- 1
- Q3
- 1
- 99%
- 8.4
- Max
- 16
- Citing Source Titles
- Citing Publishers
Latest Publications
- 30 October 2026
- Published by Brawijaya University in Rekayasa Sipil
- Vol. 20 (3) , 329-337
Effective Role of Project Digital Communication in Mediating Factors Influencing Construction Project Delays
In construction projects, timely completion is one benchmark of a project's success. Construction projects generally have a work plan and implementation schedule that indicate when the project should start and end. A project's success depends on the performance of each component of implementation, including the project owner. This study aims to analyze the effect of timely material delivery, the quality of internal logistics management, the performance of suppliers and procurement systems, and the effectiveness of project digital communication on delays in low-cost commercial construction projects. In this study, the effectiveness of project digital communication variables acts as a mediating variable. The population and sample in this study were 60 respondents. The sampling technique used was census sampling, in which the entire population was sampled. The research method used was a quantitative research method with data analysis methods using descriptive analysis and SEM-PLS analysis. The results showed that the timeliness of material delivery significantly affected construction project delays. The quality of internal logistics management significantly affected construction project delays. Supplier performance and procurement systems significantly affected construction project delays. The effectiveness of project digital communication variables did not mediate the effect of delivery timeliness on construction project delays. Project digital communication effectiveness played a role in mediating the effect of the quality of internal logistics management on construction project delays. The project's digital communication effectiveness variable does not mediate the effect of supplier performance and procurement systems on construction project delays.
- 30 October 2026
- Published by Brawijaya University in Rekayasa Sipil
- Vol. 20 (3) , 329-337
Effective Role of Project Digital Communication in Mediating Factors Influencing Construction Project Delays
In construction projects, timely completion is one benchmark of a project's success. Construction projects generally have a work plan and implementation schedule that indicate when the project should start and end. A project's success depends on the performance of each component of implementation, including the project owner. This study aims to analyze the effect of timely material delivery, the quality of internal logistics management, the performance of suppliers and procurement systems, and the effectiveness of project digital communication on delays in low-cost commercial construction projects. In this study, the effectiveness of project digital communication variables acts as a mediating variable. The population and sample in this study were 60 respondents. The sampling technique used was census sampling, in which the entire population was sampled. The research method used was a quantitative research method with data analysis methods using descriptive analysis and SEM-PLS analysis. The results showed that the timeliness of material delivery significantly affected construction project delays. The quality of internal logistics management significantly affected construction project delays. Supplier performance and procurement systems significantly affected construction project delays. The effectiveness of project digital communication variables did not mediate the effect of delivery timeliness on construction project delays. Project digital communication effectiveness played a role in mediating the effect of the quality of internal logistics management on construction project delays. The project's digital communication effectiveness variable does not mediate the effect of supplier performance and procurement systems on construction project delays.
- 30 October 2026
- Published by Brawijaya University in Rekayasa Sipil
- Vol. 20 (3) , 320-328
Effect Of Column Orientation on Structural Performance of Irregular RC Building Using Pushover Analysis
This study evaluates the effect of rectangular column orientation on the structural performance and collapse mechanisms of reinforced concrete buildings with horizontal irregularities. The analysis used nonlinear static (pushover) analysis based on SNI 1726:2019 and ATC-40 on an eight-story office building model in Pejaten, South Jakarta, characterized by torsional irregularity, re-entrant corners, and diaphragm discontinuity. Three structural models were developed with different column orientations: Model I with the strong axis oriented in the Y-direction, Model II in the X-direction, and Model III with combined X and Y orientations. The results indicate that Model I provides the most balanced structural response, with displacement ranging from 0.498 mm to 3.959 mm, significantly lower than Model II, which reaches up to 74.417 mm, and Model III, which reaches up to 33.684 mm. Model I's inter-story drift ratio is approximately 0.2%, compared with 0.7% in Model III and 1.9% in Model II, indicating a substantial difference in structural performance. Model I achieves a beam-dominated collapse mechanism, while Models II and III exhibit column-sway or soft-story mechanisms. These findings confirm that column orientation significantly influences stiffness distribution and seismic performance in irregular buildings. Aligning the column strong axis with the structurally weaker direction is therefore recommended to improve structural stability, control lateral deformation, and achieve a more desirable collapse mechanism.
- 30 October 2026
- Published by Brawijaya University in Rekayasa Sipil
- Vol. 20 (3) , 320-328
Effect Of Column Orientation on Structural Performance of Irregular RC Building Using Pushover Analysis
This study evaluates the effect of rectangular column orientation on the structural performance and collapse mechanisms of reinforced concrete buildings with horizontal irregularities. The analysis used nonlinear static (pushover) analysis based on SNI 1726:2019 and ATC-40 on an eight-story office building model in Pejaten, South Jakarta, characterized by torsional irregularity, re-entrant corners, and diaphragm discontinuity. Three structural models were developed with different column orientations: Model I with the strong axis oriented in the Y-direction, Model II in the X-direction, and Model III with combined X and Y orientations. The results indicate that Model I provides the most balanced structural response, with displacement ranging from 0.498 mm to 3.959 mm, significantly lower than Model II, which reaches up to 74.417 mm, and Model III, which reaches up to 33.684 mm. Model I's inter-story drift ratio is approximately 0.2%, compared with 0.7% in Model III and 1.9% in Model II, indicating a substantial difference in structural performance. Model I achieves a beam-dominated collapse mechanism, while Models II and III exhibit column-sway or soft-story mechanisms. These findings confirm that column orientation significantly influences stiffness distribution and seismic performance in irregular buildings. Aligning the column strong axis with the structurally weaker direction is therefore recommended to improve structural stability, control lateral deformation, and achieve a more desirable collapse mechanism.
- 30 October 2026
- Published by Brawijaya University in Rekayasa Sipil
- Vol. 20 (3) , 314-319
Feasibility Evaluation of The Probowangi Toll Road For Enhancing Accessibility and Connectivity in Banyuwangi Regency
The construction of the Probolinggo–Banyuwangi (Probowangi) Toll Road, as a national strategic project, is expected to enhance regional connectivity and accessibility in East Java. With a total length of 123,5 km, this infrastructure is projected to reduce congestion, lower logistics costs, and improve the efficiency of goods distribution and mobility. This research evaluates the project's economic and financial feasibility, as well as its impact on improved accessibility in Banyuwangi Regency. The research employs a literature review, secondary data analysis, economic feasibility analysis (BCR, NPV, IRR), financial analysis, and socio-economic impact assessment. The results indicate that the project is feasible, with significant benefits in improving transport efficiency, generating economic opportunities, and supporting regional development along the corridor. The Probowangi Toll Road is therefore considered a strategic infrastructure to promote balanced regional development and strengthen connectivity between Java and Bali.
- 30 October 2026
- Published by Brawijaya University in Rekayasa Sipil
- Vol. 20 (3) , 314-319
Feasibility Evaluation of The Probowangi Toll Road For Enhancing Accessibility and Connectivity in Banyuwangi Regency
The construction of the Probolinggo–Banyuwangi (Probowangi) Toll Road, as a national strategic project, is expected to enhance regional connectivity and accessibility in East Java. With a total length of 123,5 km, this infrastructure is projected to reduce congestion, lower logistics costs, and improve the efficiency of goods distribution and mobility. This research evaluates the project's economic and financial feasibility, as well as its impact on improved accessibility in Banyuwangi Regency. The research employs a literature review, secondary data analysis, economic feasibility analysis (BCR, NPV, IRR), financial analysis, and socio-economic impact assessment. The results indicate that the project is feasible, with significant benefits in improving transport efficiency, generating economic opportunities, and supporting regional development along the corridor. The Probowangi Toll Road is therefore considered a strategic infrastructure to promote balanced regional development and strengthen connectivity between Java and Bali.
- 30 October 2026
- Published by Brawijaya University in Rekayasa Sipil
- Vol. 20 (3) , 305-313
Landscape Configuration and User Movement Patterns in the GKB 5 Area, Universitas Muhammadiyah Malang
This study investigates how micro-scale landscape configuration relates to outdoor comfort and pedestrian–vehicle interaction around the GKB 5 area of Universitas Muhammadiyah Malang. The research combines (i) field observation of landscape and circulation, (ii) a preliminary user mobility survey (n = 89), and (iii) GIS-based spatial overlay analysis. Pedestrian–vehicle interaction exposure was operationalized using proximity thresholds (5 m) and separation characteristics (continuous physical barriers versus surface-only delineation). The spatial analysis evaluated 12 functional segments and identified interaction-prone locations through buffer and intersection procedures. Results indicate that the GKB 5 outdoor environment is hardscape-dominant along primary pedestrian connectors, while green open spaces function mainly as peripheral buffers, limiting their role in shading and social use. Five out of twelve segments (41.7%) were classified as high interaction exposure, and three overlap nodes were concentrated in entrance-adjacent transition spaces and parking connectors. Survey results show motorcycles as the dominant access mode (48.31%), followed by cars (31.46%) and walking (20.22%), implying strong parking dependence and stream convergence near entrances. The findings suggest that improving hardscape-softscape balance, strengthening continuous pedestrian-oriented delineation, and enhancing transition-space legibility are critical to support safer and more comfortable campus mobility environments. This study contributes a segment-based spatial diagnostic framework that integrates proximity classification and GIS overlay to identify pedestrian–vehicle interaction hotspots in campus environments.
- 30 October 2026
- Published by Brawijaya University in Rekayasa Sipil
- Vol. 20 (3) , 305-313
Landscape Configuration and User Movement Patterns in the GKB 5 Area, Universitas Muhammadiyah Malang
This study investigates how micro-scale landscape configuration relates to outdoor comfort and pedestrian–vehicle interaction around the GKB 5 area of Universitas Muhammadiyah Malang. The research combines (i) field observation of landscape and circulation, (ii) a preliminary user mobility survey (n = 89), and (iii) GIS-based spatial overlay analysis. Pedestrian–vehicle interaction exposure was operationalized using proximity thresholds (5 m) and separation characteristics (continuous physical barriers versus surface-only delineation). The spatial analysis evaluated 12 functional segments and identified interaction-prone locations through buffer and intersection procedures. Results indicate that the GKB 5 outdoor environment is hardscape-dominant along primary pedestrian connectors, while green open spaces function mainly as peripheral buffers, limiting their role in shading and social use. Five out of twelve segments (41.7%) were classified as high interaction exposure, and three overlap nodes were concentrated in entrance-adjacent transition spaces and parking connectors. Survey results show motorcycles as the dominant access mode (48.31%), followed by cars (31.46%) and walking (20.22%), implying strong parking dependence and stream convergence near entrances. The findings suggest that improving hardscape-softscape balance, strengthening continuous pedestrian-oriented delineation, and enhancing transition-space legibility are critical to support safer and more comfortable campus mobility environments. This study contributes a segment-based spatial diagnostic framework that integrates proximity classification and GIS overlay to identify pedestrian–vehicle interaction hotspots in campus environments.
- 30 October 2026
- Published by Brawijaya University in Rekayasa Sipil
- Vol. 20 (3) , 295-304
Complex Infrastructure Risk Networks: A UNM Framework for Analyzing Systematic Interconnectivity
Large-scale infrastructure projects face significant risk management challenges, mainly because mapping interdependencies among risks is difficult. Conventional methods tend to analyze risks partially or in isolation, failing to capture the dynamics within risk networks influenced by external factors such as funding and regulations. This limitation often leads to inaccurate risk estimations in complex project environments. This research aims to develop the Uncertainty Network Model as a methodological approach to map this systematic interconnectivity. This study explains how the model visualizes non-linear risk interactions through a literature review, semi-structured interviews with industry experts, and an analytical description of the model’s structure. The results show that the Uncertainty Network Model integrates stakeholder knowledge into a network representation that reveals the interconnection pathways between uncertainties. Unlike standard checklist-based approaches, this model supports systemic risk identification by uncovering hidden dependencies among project variables. This enables more targeted mitigation decisions by directing focus toward the root causes and propagation pathways of problems within the project network. In conclusion, this research positions the Uncertainty Network Model as a systemic alternative to traditional risk management. By understanding these interconnectivity pathways, project managers can allocate resources more strategically to improve the likelihood of successful outcomes in complex infrastructure environments.
- 30 October 2026
- Published by Brawijaya University in Rekayasa Sipil
- Vol. 20 (3) , 295-304
Complex Infrastructure Risk Networks: A UNM Framework for Analyzing Systematic Interconnectivity
Large-scale infrastructure projects face significant risk management challenges, mainly because mapping interdependencies among risks is difficult. Conventional methods tend to analyze risks partially or in isolation, failing to capture the dynamics within risk networks influenced by external factors such as funding and regulations. This limitation often leads to inaccurate risk estimations in complex project environments. This research aims to develop the Uncertainty Network Model as a methodological approach to map this systematic interconnectivity. This study explains how the model visualizes non-linear risk interactions through a literature review, semi-structured interviews with industry experts, and an analytical description of the model’s structure. The results show that the Uncertainty Network Model integrates stakeholder knowledge into a network representation that reveals the interconnection pathways between uncertainties. Unlike standard checklist-based approaches, this model supports systemic risk identification by uncovering hidden dependencies among project variables. This enables more targeted mitigation decisions by directing focus toward the root causes and propagation pathways of problems within the project network. In conclusion, this research positions the Uncertainty Network Model as a systemic alternative to traditional risk management. By understanding these interconnectivity pathways, project managers can allocate resources more strategically to improve the likelihood of successful outcomes in complex infrastructure environments.
- 30 October 2026
- Published by Brawijaya University in Rekayasa Sipil
- Vol. 20 (3) , 288-294
Analysis of Occupational Accident Risks in a Bridge Duplication Construction Project Using the Delphi and FMEA Methods
The Social Security Administration for Employment (BPJS Ketenagakerjaan) recorded 234,370 occupational accident cases in 2021, increasing to 265,334 cases in 2022. In 2023, the number of occupational accidents rose further to 370,747 cases, and in 2024 it increased to 462,241 cases. Based on the latest data from the Ministry of Manpower (Kemnaker), 47,300 cases were reported as of April 2025. The construction sector contributes most to occupational accidents, accounting for about 32% of cases annually. In response, it is necessary to identify potential occupational accident risks and determine which occur most frequently. This study focuses on a bridge duplication construction project. The research uses the Delphi method, in which several Occupational Health and Safety (OHS) experts provide input on potential occupational accident risks to validate the risk variables through consensus. The study then used Failure Mode and Effects Analysis (FMEA) to identify the most dominant occupational accident risks. The Delphi method identified that, out of 31 occupational accident risks, 29 were validated as potential risks through expert consensus. The FMEA results further indicated that, of the 29 potential risks, 4 occupational accident risks were the most dominant. This study's results are expected to serve as a reference for stakeholders to identify potential occupational accident risks and determine which are most prevalent.
- 30 October 2026
- Published by Brawijaya University in Rekayasa Sipil
- Vol. 20 (3) , 288-294
Analysis of Occupational Accident Risks in a Bridge Duplication Construction Project Using the Delphi and FMEA Methods
The Social Security Administration for Employment (BPJS Ketenagakerjaan) recorded 234,370 occupational accident cases in 2021, increasing to 265,334 cases in 2022. In 2023, the number of occupational accidents rose further to 370,747 cases, and in 2024 it increased to 462,241 cases. Based on the latest data from the Ministry of Manpower (Kemnaker), 47,300 cases were reported as of April 2025. The construction sector contributes most to occupational accidents, accounting for about 32% of cases annually. In response, it is necessary to identify potential occupational accident risks and determine which occur most frequently. This study focuses on a bridge duplication construction project. The research uses the Delphi method, in which several Occupational Health and Safety (OHS) experts provide input on potential occupational accident risks to validate the risk variables through consensus. The study then used Failure Mode and Effects Analysis (FMEA) to identify the most dominant occupational accident risks. The Delphi method identified that, out of 31 occupational accident risks, 29 were validated as potential risks through expert consensus. The FMEA results further indicated that, of the 29 potential risks, 4 occupational accident risks were the most dominant. This study's results are expected to serve as a reference for stakeholders to identify potential occupational accident risks and determine which are most prevalent.
- 30 October 2026
- Published by Brawijaya University in Rekayasa Sipil
- Vol. 20 (3) , 276-287
Risk Analysis of CD-BIM Integration in Structural Jetty Schematic Design: Time Performance
The early design stage of jetty infrastructure is crucial for setting the project's budget and time. However, current digital processes often do not fully integrate these tasks. Computational design and Building Information Modeling (BIM) have sped up design cycles through faster iterations and improved coordination. Still, they have also increased the likelihood of mistakes, extra work, and project delays. This research analyses risks in design processes that practitioners judge as having a significant impact on design time performance and how to mitigate them. The analysis identified 66 potential risks. Thirty-five engineers then assessed these vulnerabilities based on how often they occur and how they affect design-process length. They developed a priority list using a composite risk metric. Three senior engineers with strong maritime design backgrounds then reviewed the highest?ranked risks and confirmed which items are critical in real project settings. The results highlighted 20 major vulnerabilities. The investigation also found 17 root causes and 16 mitigation measures. These were organized into a risk oversight framework with four main areas: design integrity, information and documentation, stakeholder alignment, and technical systems and integration. This framework offers practical guidance for organizations seeking to adopt digital design methods while better managing risks to design time performance as perceived by practitioners.
- 30 October 2026
- Published by Brawijaya University in Rekayasa Sipil
- Vol. 20 (3) , 276-287
Risk Analysis of CD-BIM Integration in Structural Jetty Schematic Design: Time Performance
The early design stage of jetty infrastructure is crucial for setting the project's budget and time. However, current digital processes often do not fully integrate these tasks. Computational design and Building Information Modeling (BIM) have sped up design cycles through faster iterations and improved coordination. Still, they have also increased the likelihood of mistakes, extra work, and project delays. This research analyses risks in design processes that practitioners judge as having a significant impact on design time performance and how to mitigate them. The analysis identified 66 potential risks. Thirty-five engineers then assessed these vulnerabilities based on how often they occur and how they affect design-process length. They developed a priority list using a composite risk metric. Three senior engineers with strong maritime design backgrounds then reviewed the highest?ranked risks and confirmed which items are critical in real project settings. The results highlighted 20 major vulnerabilities. The investigation also found 17 root causes and 16 mitigation measures. These were organized into a risk oversight framework with four main areas: design integrity, information and documentation, stakeholder alignment, and technical systems and integration. This framework offers practical guidance for organizations seeking to adopt digital design methods while better managing risks to design time performance as perceived by practitioners.
- 30 October 2026
- Published by Brawijaya University in Rekayasa Sipil
- Vol. 20 (3) , 266-275
Optimization of Arch Rib Inclination on Arch Bridges (Case Study: Kali Kuto Bridge)
Optimizing the geometric parameters of arch bridges is essential for achieving material efficiency and indirectly minimizing negative environmental impacts. This study quantitatively evaluates the effect of arch rib inclination on structural performance to determine the optimal design configuration in accordance with SNI 1729:2020. A parametric Finite Element Method was utilized to analyze seven bridge models with arch rib inclinations of 0°, 5°, 10°, 15°, 20°, 25°, and 30°. The evaluation focused on internal forces, steel capacity ratio, deflection, structural weight, and structural performance. The analysis results indicate that an arch rib inclination of 20° is the optimal configuration, achieving the highest structural performance index of 0.987. At this optimum angle, the structural weight is reduced by 5.9%, and the deflection reaches a minimum of 63.3 mm, indicating superior vertical and lateral stiffness. Mechanically, this geometric modification activates a spatial frame mechanism that efficiently redistributes flexural demands into axial forces. Consequently, the combined internal forces on the cross beam arches remain highly efficient, utilizing a maximum of only 11.8% of their nominal capacity. It also minimizes the tensile force on the hangers, thereby lowering localized working stress and providing a larger safety reserve. Ultimately, this study validates that proper geometric optimization can significantly improve material efficiency, which indirectly aligns with the Sustainable Development Goals (SDGs) by minimizing the overall environmental footprint.
- 30 October 2026
- Published by Brawijaya University in Rekayasa Sipil
- Vol. 20 (3) , 266-275
Optimization of Arch Rib Inclination on Arch Bridges (Case Study: Kali Kuto Bridge)
Optimizing the geometric parameters of arch bridges is essential for achieving material efficiency and indirectly minimizing negative environmental impacts. This study quantitatively evaluates the effect of arch rib inclination on structural performance to determine the optimal design configuration in accordance with SNI 1729:2020. A parametric Finite Element Method was utilized to analyze seven bridge models with arch rib inclinations of 0°, 5°, 10°, 15°, 20°, 25°, and 30°. The evaluation focused on internal forces, steel capacity ratio, deflection, structural weight, and structural performance. The analysis results indicate that an arch rib inclination of 20° is the optimal configuration, achieving the highest structural performance index of 0.987. At this optimum angle, the structural weight is reduced by 5.9%, and the deflection reaches a minimum of 63.3 mm, indicating superior vertical and lateral stiffness. Mechanically, this geometric modification activates a spatial frame mechanism that efficiently redistributes flexural demands into axial forces. Consequently, the combined internal forces on the cross beam arches remain highly efficient, utilizing a maximum of only 11.8% of their nominal capacity. It also minimizes the tensile force on the hangers, thereby lowering localized working stress and providing a larger safety reserve. Ultimately, this study validates that proper geometric optimization can significantly improve material efficiency, which indirectly aligns with the Sustainable Development Goals (SDGs) by minimizing the overall environmental footprint.
- 30 October 2026
- Published by Brawijaya University in Rekayasa Sipil
- Vol. 20 (3) , 384-395
Coupling Hydrodynamic Inundation Modeling with Flood Risk and Economic Loss Analysis Under Land Cover Change
Land-cover change is a major driver of rising flood risk in river catchments, including the Jatiroto Catchment in Lumajang Regency, East Java. Previous studies have mainly examined river flow, land-use impacts on discharge, or erosion separately, with limited integration of spatial inundation modeling, disaster risk, and economic loss assessment. This study addresses this gap through a two-stage framework. First, a two-dimensional flood model was developed for three land cover conditions (1995, 2014, and 2023) and four rainfall return periods (2, 5, 10, and 25 years). Second, the resulting inundation maps were used to assess disaster risk and estimate economic losses across 44 villages in the lower catchment. The model was validated against the 23–24 December 2018 flood event in Rowokangkung and Sidorejo, showing reasonable agreement with field observations. Built-up land increased from 4.0% in 1995 to 15.9% in 2023, accompanied by increased inundation under all return periods. Flood extent was strongly and positively correlated with open land and settlements and strongly and negatively correlated with forest cover. Economic losses increased from IDR 185.3 billion in 1995 to IDR 540.1 billion in 2023, despite a temporary decline in 2014. Inundated area was the strongest predictor of economic loss. Kaliboto Lor, Rowokangkung, and Sidorejo consistently ranked among the highest-risk and highest-loss villages. The integrated framework provides a practical basis for flood mitigation, budget prioritization, and adaptive spatial planning in the Jatiroto Catchment.
- 30 October 2026
- Published by Brawijaya University in Rekayasa Sipil
- Vol. 20 (3) , 384-395
Coupling Hydrodynamic Inundation Modeling with Flood Risk and Economic Loss Analysis Under Land Cover Change
Land-cover change is a major driver of rising flood risk in river catchments, including the Jatiroto Catchment in Lumajang Regency, East Java. Previous studies have mainly examined river flow, land-use impacts on discharge, or erosion separately, with limited integration of spatial inundation modeling, disaster risk, and economic loss assessment. This study addresses this gap through a two-stage framework. First, a two-dimensional flood model was developed for three land cover conditions (1995, 2014, and 2023) and four rainfall return periods (2, 5, 10, and 25 years). Second, the resulting inundation maps were used to assess disaster risk and estimate economic losses across 44 villages in the lower catchment. The model was validated against the 23–24 December 2018 flood event in Rowokangkung and Sidorejo, showing reasonable agreement with field observations. Built-up land increased from 4.0% in 1995 to 15.9% in 2023, accompanied by increased inundation under all return periods. Flood extent was strongly and positively correlated with open land and settlements and strongly and negatively correlated with forest cover. Economic losses increased from IDR 185.3 billion in 1995 to IDR 540.1 billion in 2023, despite a temporary decline in 2014. Inundated area was the strongest predictor of economic loss. Kaliboto Lor, Rowokangkung, and Sidorejo consistently ranked among the highest-risk and highest-loss villages. The integrated framework provides a practical basis for flood mitigation, budget prioritization, and adaptive spatial planning in the Jatiroto Catchment.
- 30 October 2026
- Published by Brawijaya University in Rekayasa Sipil
- Vol. 20 (3) , 376-383
Cyclic Response and Energy Dissipation of Angle-Reinforced Screw Connected Cold-Formed Steel Frames
The cyclic performance of cold-formed steel frames depends strongly on the behavior of their beam-column connections, particularly under repeated lateral loading. This study examines whether adding top and seat angles to an inner-plate connection can improve the response of back-to-back cold-formed steel frames. Four frame specimens were tested under reversed quasi-static loading. Two specimens were reinforced with inner plates and top and seat angles, while the other two were reinforced only with inner plates. Load resistance, ultimate displacement, displacement ductility, secant stiffness, energy dissipation, and deformation patterns were evaluated. The angle-reinforced frames reached 13.83 kN in both loading directions and sustained larger displacements than the frames without angle reinforcement. A clear difference was found in energy dissipation. The reinforced frames dissipated an average of 62.31 kJ, compared with 18.07 kJ for the unreinforced frames. Even when only the loading phases completed by all specimens were considered, the reinforced frames dissipated nearly twice as much energy. In contrast, the differences in displacement ductility and secant stiffness were relatively small. Visual observations also revealed distinct deformation patterns: the reinforced specimens exhibited localized deformation at the angle plates, whereas the unreinforced specimens showed more pronounced member distortion and screw tilting. Overall, the top and seat angles primarily improved the connection's ability to maintain resistance, accommodate deformation, and dissipate energy under repeated loading.
- 30 October 2026
- Published by Brawijaya University in Rekayasa Sipil
- Vol. 20 (3) , 376-383
Cyclic Response and Energy Dissipation of Angle-Reinforced Screw Connected Cold-Formed Steel Frames
The cyclic performance of cold-formed steel frames depends strongly on the behavior of their beam-column connections, particularly under repeated lateral loading. This study examines whether adding top and seat angles to an inner-plate connection can improve the response of back-to-back cold-formed steel frames. Four frame specimens were tested under reversed quasi-static loading. Two specimens were reinforced with inner plates and top and seat angles, while the other two were reinforced only with inner plates. Load resistance, ultimate displacement, displacement ductility, secant stiffness, energy dissipation, and deformation patterns were evaluated. The angle-reinforced frames reached 13.83 kN in both loading directions and sustained larger displacements than the frames without angle reinforcement. A clear difference was found in energy dissipation. The reinforced frames dissipated an average of 62.31 kJ, compared with 18.07 kJ for the unreinforced frames. Even when only the loading phases completed by all specimens were considered, the reinforced frames dissipated nearly twice as much energy. In contrast, the differences in displacement ductility and secant stiffness were relatively small. Visual observations also revealed distinct deformation patterns: the reinforced specimens exhibited localized deformation at the angle plates, whereas the unreinforced specimens showed more pronounced member distortion and screw tilting. Overall, the top and seat angles primarily improved the connection's ability to maintain resistance, accommodate deformation, and dissipate energy under repeated loading.