CIVED
Published by Universitas Negeri Padang
- Scilit
- Asphalt
- Concrete
- Product Engineering
- Geotechnical Engineering
- Remote Sensing
- Education & Pedagogy
Publications Analysis
Publications in 2016-2026
Open Access Publications in 2016-2026
- Total Citations
- 65
- Total Publications
- 270
- Average Citations
- 0.24
- Cited Publications
- 50
- Cited Publications %
- 18.5%
- Self Citations
- 0
- Self Citations %
- 0%
- I3
- 124
- I3/N
- 1.48
- h5_index
- 5
- Monthly Citation Metric (MCM)
- 0.18
- Q1
- 0
- Med
- 0
- Q3
- 1
- 99%
- 4.6
- Max
- 11
- Citing Source Titles
- Citing Publishers
Latest Publications
- Open Access
- 17 September 2024
- Published by Universitas Negeri Padang in CIVED
- Vol. 11 (3) , 856-870
Analysis of Effect Overloading on the Remaining Life Pavement Plan on the Bungah Highway - Ngawen Highway Section
Bungah -Ngawen highway section is one of the accesses to the industrial area in Gresik City. This affects the vehicles that cross this road, which are dominated by heavy vehicles that distribute goods and services. These conditions can cause faster damage to the pavement which can hinder smooth transportation. This research aims to analyze the impact of vehicle loads on the remaining life of the plan on the Jalan Raya Bungah-Jalan Raya Ngawen section (STA 0+000-STA 5+500). The reason for this research is the amount of damage to the pavement. Based on a direct survey, this road has a road width of 6 m with a length of road damage of 2,15 km from the road section under review. The data used are primary data in the form of average daily traffic and secondary data, namely LHR data and vehicle load data. The calculation method used is the AASHTO 1993 Method. From the primary and secondary data obtained, traffic growth, percentage of overload, ESAL value, W18 value, and the remaining value of the road plan life can be calculated. From the calculation results, the standard ∑W18 value during the plan life is 338422516.86 to 4796885453.64, while for the overload ∑W18 value is 531674277.94 to 6849455940.63. The main trigger for pavement damage on the Jalan Raya Bungah-Jalan Raya Ngawen section is class VIb vehicles because they have the largest overload of 27,90%. The remaining life value of standard load conditions in 2024 of 57,46% decreased under overloading conditions to 33,29%, with a difference of -24,17% and the road service life will end in March 2026 or a reduction from the planned life of 10 years.
- 17 September 2024
- Published by Universitas Negeri Padang in CIVED
- Vol. 11 (3) , 856-870
Open AccessAnalysis of Effect Overloading on the Remaining Life Pavement Plan on the Bungah Highway - Ngawen Highway Section
Bungah -Ngawen highway section is one of the accesses to the industrial area in Gresik City. This affects the vehicles that cross this road, which are dominated by heavy vehicles that distribute goods and services. These conditions can cause faster damage to the pavement which can hinder smooth transportation. This research aims to analyze the impact of vehicle loads on the remaining life of the plan on the Jalan Raya Bungah-Jalan Raya Ngawen section (STA 0+000-STA 5+500). The reason for this research is the amount of damage to the pavement. Based on a direct survey, this road has a road width of 6 m with a length of road damage of 2,15 km from the road section under review. The data used are primary data in the form of average daily traffic and secondary data, namely LHR data and vehicle load data. The calculation method used is the AASHTO 1993 Method. From the primary and secondary data obtained, traffic growth, percentage of overload, ESAL value, W18 value, and the remaining value of the road plan life can be calculated. From the calculation results, the standard ∑W18 value during the plan life is 338422516.86 to 4796885453.64, while for the overload ∑W18 value is 531674277.94 to 6849455940.63. The main trigger for pavement damage on the Jalan Raya Bungah-Jalan Raya Ngawen section is class VIb vehicles because they have the largest overload of 27,90%. The remaining life value of standard load conditions in 2024 of 57,46% decreased under overloading conditions to 33,29%, with a difference of -24,17% and the road service life will end in March 2026 or a reduction from the planned life of 10 years.
- Open Access
- 17 September 2024
- Published by Universitas Negeri Padang in CIVED
- Vol. 11 (3) , 822-829
Analysis the Influence of 4C Skills in Improving Employability Skills and Learning Achievement of Vocational School
Economic and technological advances in Indonesia require vocational school graduates to be able to work competently according to their fields. The Ministry of Education and Culture supports the 21st century learning model which refers to the 4C skills, namely Communication, Collaboration, Critical Thinking and Creative. Achievement in the learning process is used to measure the achievement of goals and the intelligence of students. To be able to enter and survive in the world of work, it is also necessary to prepare attitudes, character and skills in work or employability skills that start from the learning process. This study aims to analyze the influence of 4C skills in improving employability skills and learning outcomes. The approach used in this study is quantitative with the student population of the DPIB Expertise Program of SMK Negeri 3 Semarang. The sampling technique uses a total sampling of 72 respondents. This study uses multiple linear regression analysis techniques that have previously gone through analytical tests including (1) Normality Test, (2) Homogeneity Test, (3) Linearity Test. The results of the study showed that (1) there was an influence between learning achievement on 4C skills with a T value of 4.660, (2) there was an influence between employability skills on 4C skills with a T value of 9.520, and (3) there was a simultaneous effect between learning achievement and employability skills against 4C skills with an F value of 55.937. The simultaneous correlation of the three variables was 78.6% with a simultaneous influence value of 61.9%, the remaining value of 38.1% was influenced by other factors that were not studied by the researcher.
- 17 September 2024
- Published by Universitas Negeri Padang in CIVED
- Vol. 11 (3) , 822-829
Open AccessAnalysis the Influence of 4C Skills in Improving Employability Skills and Learning Achievement of Vocational School
Economic and technological advances in Indonesia require vocational school graduates to be able to work competently according to their fields. The Ministry of Education and Culture supports the 21st century learning model which refers to the 4C skills, namely Communication, Collaboration, Critical Thinking and Creative. Achievement in the learning process is used to measure the achievement of goals and the intelligence of students. To be able to enter and survive in the world of work, it is also necessary to prepare attitudes, character and skills in work or employability skills that start from the learning process. This study aims to analyze the influence of 4C skills in improving employability skills and learning outcomes. The approach used in this study is quantitative with the student population of the DPIB Expertise Program of SMK Negeri 3 Semarang. The sampling technique uses a total sampling of 72 respondents. This study uses multiple linear regression analysis techniques that have previously gone through analytical tests including (1) Normality Test, (2) Homogeneity Test, (3) Linearity Test. The results of the study showed that (1) there was an influence between learning achievement on 4C skills with a T value of 4.660, (2) there was an influence between employability skills on 4C skills with a T value of 9.520, and (3) there was a simultaneous effect between learning achievement and employability skills against 4C skills with an F value of 55.937. The simultaneous correlation of the three variables was 78.6% with a simultaneous influence value of 61.9%, the remaining value of 38.1% was influenced by other factors that were not studied by the researcher.
- Open Access
- 17 September 2024
- Published by Universitas Negeri Padang in CIVED
- Vol. 11 (3) , 846-855
Utilization of Open Polygon Method for Land Mapping in Mojoroto Kediri with Geospatial Approach
Land mapping is an important research activity to determine the location of points on the earth's surface, describing the physical condition of parts of the surface that resemble the actual condition. The objective of this process is to gain a comprehensive understanding of the land to be built and used through land area measurements, topographic maps, and land volume analysis at various altitudes. In this mapping, the open polygon method is used for calculations which are conventional methods using data point values as data centers to represent the area of influence. During this mapping, there are three main points used with the open polygon method. A total of 26 ground contours were recorded, and 4 road contours recorded. During the mapping process, corrections are required on the open polygon calculations to ensure the accuracy of the results. This correction involves adjusting the data to take into account field variability and inaccuracies of measuring instruments, so that the resulting data can be reliable for further analysis and correct decision-making. The land that has been painted can be used for various fields such as construction, and mining. Land mapping allows partial surface physical state imaging, classification of land, and can be used to plan, build, and maintain infrastructure such as highways and bridges. The result of this practice obtained data of the maximum height of 90,0945 masl and minimum 88,76 masl with the average ground height 90,05059 masl, while the average highway height is at 88,86175 masl.
- 17 September 2024
- Published by Universitas Negeri Padang in CIVED
- Vol. 11 (3) , 846-855
Open AccessUtilization of Open Polygon Method for Land Mapping in Mojoroto Kediri with Geospatial Approach
Land mapping is an important research activity to determine the location of points on the earth's surface, describing the physical condition of parts of the surface that resemble the actual condition. The objective of this process is to gain a comprehensive understanding of the land to be built and used through land area measurements, topographic maps, and land volume analysis at various altitudes. In this mapping, the open polygon method is used for calculations which are conventional methods using data point values as data centers to represent the area of influence. During this mapping, there are three main points used with the open polygon method. A total of 26 ground contours were recorded, and 4 road contours recorded. During the mapping process, corrections are required on the open polygon calculations to ensure the accuracy of the results. This correction involves adjusting the data to take into account field variability and inaccuracies of measuring instruments, so that the resulting data can be reliable for further analysis and correct decision-making. The land that has been painted can be used for various fields such as construction, and mining. Land mapping allows partial surface physical state imaging, classification of land, and can be used to plan, build, and maintain infrastructure such as highways and bridges. The result of this practice obtained data of the maximum height of 90,0945 masl and minimum 88,76 masl with the average ground height 90,05059 masl, while the average highway height is at 88,86175 masl.
- Open Access
- 17 September 2024
- Published by Universitas Negeri Padang in CIVED
- Vol. 11 (3) , 1107-1119
Design Micro-Hydro Power Plant Water Resources System for Small Medium Enterprise Rice Mill in Nagari Kamang Hilia Agam
Processing rice products into rice requires further processing, where the grain harvested from farmers is processed into rice. The Nagari Binaan Community Service team from Padang State University will later develop this process. Farmer groups say that the availability of continuous and cheap electricity is their obstacle in producing good and cheap rice products. Counseling and assistance in making civil buildings capture turbulence water micro-hydro power plants is a solution to partner problems offered by the community service team of the Nagari program assisted by Padang State University. The output of the Nagari Fostered Program will be used to build a 5000-watt capacity power plant, supporting the need for free and environmentally friendly electricity. This aligns with the government's renewable energy program for 2030, which aims to produce 25% of the national electricity from renewable sources. This program is planned for 3 (three) stages, where the first year is mapping and detailed engineering design in the form of reports and design drawings. The second year is in the form of civil construction, and the third year's target is the installation of electrical machines and panels for commissioning. There will be training for partners, such as farmers in Kanagarian Kamang Hilia, Agam.
- 17 September 2024
- Published by Universitas Negeri Padang in CIVED
- Vol. 11 (3) , 1107-1119
Open AccessDesign Micro-Hydro Power Plant Water Resources System for Small Medium Enterprise Rice Mill in Nagari Kamang Hilia Agam
Processing rice products into rice requires further processing, where the grain harvested from farmers is processed into rice. The Nagari Binaan Community Service team from Padang State University will later develop this process. Farmer groups say that the availability of continuous and cheap electricity is their obstacle in producing good and cheap rice products. Counseling and assistance in making civil buildings capture turbulence water micro-hydro power plants is a solution to partner problems offered by the community service team of the Nagari program assisted by Padang State University. The output of the Nagari Fostered Program will be used to build a 5000-watt capacity power plant, supporting the need for free and environmentally friendly electricity. This aligns with the government's renewable energy program for 2030, which aims to produce 25% of the national electricity from renewable sources. This program is planned for 3 (three) stages, where the first year is mapping and detailed engineering design in the form of reports and design drawings. The second year is in the form of civil construction, and the third year's target is the installation of electrical machines and panels for commissioning. There will be training for partners, such as farmers in Kanagarian Kamang Hilia, Agam.
- Open Access
- 17 September 2024
- Published by Universitas Negeri Padang in CIVED
- Vol. 11 (3) , 918-930
Analysis of the Causes of Deviations in the Implementation of Construction Work Contracts Based on Verdict
Construction Work is the whole or part of the activities that include the construction, operation, maintenance, demolition, and rebuilding that are regulated in a Construction Contract. In the implementation of the Construction Contract, several problems cause deviations. The purpose of this research is to analyze the causes of deviations in a Construction Contract based on Verdict. The research data was obtained from the Supreme Court Repository page by searching for Verdict related to implementing Construction Contracts. The limitation of this research is a case that has been decided in the last 10 years in the District Court in West Sumatra. The search results obtained 9 verdicts. The method used to analyze the data is the Rich Picture Diagram (RPD). Validation and refinement are carried out using the Interview method from the results of secondary data analysis. The outcome of this research is the causes of deviations that are prejudicial to one of the parties and thus fall under civil law such as The occurrence of delays caused by: Contractor negligence during implementation, Contractor achievements not paid by the Owner, negligence of the Planner Consultant, the state of the land is not by the drawing plan, continuous heavy rain that disrupts the work, Kurs strengthen sharply, land acquisition has not been completed by the Owner, the Contractor is not given the opportunity 50 days of completion; Disputes caused by: Owner made unilateral changes to Technical Specifications, Supervisory Consultant's mistake in reporting progress.
- 17 September 2024
- Published by Universitas Negeri Padang in CIVED
- Vol. 11 (3) , 918-930
Open AccessAnalysis of the Causes of Deviations in the Implementation of Construction Work Contracts Based on Verdict
Construction Work is the whole or part of the activities that include the construction, operation, maintenance, demolition, and rebuilding that are regulated in a Construction Contract. In the implementation of the Construction Contract, several problems cause deviations. The purpose of this research is to analyze the causes of deviations in a Construction Contract based on Verdict. The research data was obtained from the Supreme Court Repository page by searching for Verdict related to implementing Construction Contracts. The limitation of this research is a case that has been decided in the last 10 years in the District Court in West Sumatra. The search results obtained 9 verdicts. The method used to analyze the data is the Rich Picture Diagram (RPD). Validation and refinement are carried out using the Interview method from the results of secondary data analysis. The outcome of this research is the causes of deviations that are prejudicial to one of the parties and thus fall under civil law such as The occurrence of delays caused by: Contractor negligence during implementation, Contractor achievements not paid by the Owner, negligence of the Planner Consultant, the state of the land is not by the drawing plan, continuous heavy rain that disrupts the work, Kurs strengthen sharply, land acquisition has not been completed by the Owner, the Contractor is not given the opportunity 50 days of completion; Disputes caused by: Owner made unilateral changes to Technical Specifications, Supervisory Consultant's mistake in reporting progress.
- Open Access
- 17 September 2024
- Published by Universitas Negeri Padang in CIVED
- Vol. 11 (3) , 791-799
Comparison Model of Vegetation Index and Mangrove Density using Landsat 8 Satellite Imagery in Ujungpangkah
Gresik Regency is a coastal area with a significant mangrove population, notably in the Ujungpangkah region. The Ujungpangkah mangrove forest is a designated ecotourism and conservation area. However, due to management and utilization practices by the local community, the mangrove ecosystem in Banyuurip Village, Ujungpangkah District, has experienced a decline. This study aims to determine the mangrove density in Banyuurip Village using vegetation index transformation methods (NDVI and DVI). Assessing the density of mangrove vegetation is crucial for the effective management of mangrove forests to ensure they fulfill their ecological functions. The research employs a quantitative method, utilizing Landsat 8 imagery data to measure mangrove density using the NDVI and DVI methods. The study results indicate that the NDVI canopy density classification is 86.67%, divided into three classes: dense (569.700 ha or 95.32%), medium (29.910 ha or 4.50%), and sparse (1.080 ha or 0.18%). Meanwhile, the FCD classification results are 73.33%, also divided into three classes: dense (583.740 ha or 97.67%), medium (13.410 ha or 2.24%), and sparse (0.540 ha or 0.09%). The NDVI method proved to be the most accurate for classifying canopy density based on the accuracy test data
- 17 September 2024
- Published by Universitas Negeri Padang in CIVED
- Vol. 11 (3) , 791-799
Open AccessComparison Model of Vegetation Index and Mangrove Density using Landsat 8 Satellite Imagery in Ujungpangkah
Gresik Regency is a coastal area with a significant mangrove population, notably in the Ujungpangkah region. The Ujungpangkah mangrove forest is a designated ecotourism and conservation area. However, due to management and utilization practices by the local community, the mangrove ecosystem in Banyuurip Village, Ujungpangkah District, has experienced a decline. This study aims to determine the mangrove density in Banyuurip Village using vegetation index transformation methods (NDVI and DVI). Assessing the density of mangrove vegetation is crucial for the effective management of mangrove forests to ensure they fulfill their ecological functions. The research employs a quantitative method, utilizing Landsat 8 imagery data to measure mangrove density using the NDVI and DVI methods. The study results indicate that the NDVI canopy density classification is 86.67%, divided into three classes: dense (569.700 ha or 95.32%), medium (29.910 ha or 4.50%), and sparse (1.080 ha or 0.18%). Meanwhile, the FCD classification results are 73.33%, also divided into three classes: dense (583.740 ha or 97.67%), medium (13.410 ha or 2.24%), and sparse (0.540 ha or 0.09%). The NDVI method proved to be the most accurate for classifying canopy density based on the accuracy test data
- Open Access
- 17 September 2024
- Published by Universitas Negeri Padang in CIVED
- Vol. 11 (3) , 783-790
Road Damage Analysis using Surface Distress Index (SDI) and Its Handling on Provincial Road Babat - Jombang (STA 7+000 - 12+500)
The Babat - Jombang road is often traveled by highly loaded vehicles because there are large industries along this section. In addition, the road is damaged by weather and poor subgrade conditions. Thus, resulting in road damage that can interfere with user comfort. Therefore, road damage analysis research was conducted on Babat - Jombang Road (STA 7+000 - 12+500). Road damage analysis in this study using the SDI method. The SDI (Surface Distress Index) method is a road performance scale obtained from visual observations of road damage that occurs in the field. The SDI method is a method that produces an SDI value obtained from the percentage of crack area, crack width, number of holes per 100 m, and the depth of the ruts. From this research, the types of damage on Babat - Jombang Road (STA 7+000 - 12+500) are the hole damage area of 0.11%, longitudinal cracks of 12.05%, transverse cracks of 0.17%, edge cracks of 0.29%, crocodile skin cracks of 79, 66%, shoulder joint cracking by 0.0015%, ruts by 1.48%, bleeding by 1.1%, ravelling by 2.61%, surface layer flaking by 0.13%, patches by 0.26%, upheavel by 0.51%, shoving by 1.6%. Road condition assessment using SDI method shows 87.27% in good condition and 12.73% in moderate condition. Handling carried out is leveling, sealing, hot aggregate sprinkle, and patching holes.
- 17 September 2024
- Published by Universitas Negeri Padang in CIVED
- Vol. 11 (3) , 783-790
Open AccessRoad Damage Analysis using Surface Distress Index (SDI) and Its Handling on Provincial Road Babat - Jombang (STA 7+000 - 12+500)
The Babat - Jombang road is often traveled by highly loaded vehicles because there are large industries along this section. In addition, the road is damaged by weather and poor subgrade conditions. Thus, resulting in road damage that can interfere with user comfort. Therefore, road damage analysis research was conducted on Babat - Jombang Road (STA 7+000 - 12+500). Road damage analysis in this study using the SDI method. The SDI (Surface Distress Index) method is a road performance scale obtained from visual observations of road damage that occurs in the field. The SDI method is a method that produces an SDI value obtained from the percentage of crack area, crack width, number of holes per 100 m, and the depth of the ruts. From this research, the types of damage on Babat - Jombang Road (STA 7+000 - 12+500) are the hole damage area of 0.11%, longitudinal cracks of 12.05%, transverse cracks of 0.17%, edge cracks of 0.29%, crocodile skin cracks of 79, 66%, shoulder joint cracking by 0.0015%, ruts by 1.48%, bleeding by 1.1%, ravelling by 2.61%, surface layer flaking by 0.13%, patches by 0.26%, upheavel by 0.51%, shoving by 1.6%. Road condition assessment using SDI method shows 87.27% in good condition and 12.73% in moderate condition. Handling carried out is leveling, sealing, hot aggregate sprinkle, and patching holes.
- Open Access
- 17 September 2024
- Published by Universitas Negeri Padang in CIVED
- Vol. 11 (3) , 767-782
Identification of Factors Causing Construction Contract Breaks and Recommendations for Improvement in West Pasaman Regency
The implementation of construction projects in the Regional Government of West Pasaman Regency almost every year there is always a termination of the contract which results in not achieving the government's goal of increasing the standard of living of the community because the targets set by the Government are delayed and hampered. This research was carried out which aims to identify the causes of contract termination in the implementation of construction service procurement in West Pasaman Regency, analyze and evaluate the causes of contract termination in construction implementation, and determine recommendations for improvement to prevent contract termination in the implementation of construction service procurement in Pasaman Regency West. This study uses descriptive qualitative analysis based on the results of interviews with CMO and TIO for work that has terminated its contract and analyzes administrative data on termination of contracts for construction work which has experienced termination of contract. The methods used in the discussion to find out the factors that cause construction contract termination are the Fault Tree Analysis (FTA) Method and the Obtain Cut Set (MOCUS) Method. From this study it can be concluded that the main factor causing the breakup of construction contracts is the owner's firmness with the performance of the provider, the provider being evaluated is unable to carry out the work, the contract termination should be carried out earlier, not waiting for the end of the year and not providing an extension of the implementation period past the fiscal year and the owner is negligent. in controlling the contract. While the supporting factors that cause the termination of the contract are the provider's fault, namely poor project management, the practice of borrowing company flags, not having capital, not heeding the instructions of the owner and field supervisor as well as other factors, namely disturbance factors from the community around the work location, weather, selection of providers and material supply. For recommendations for future improvements, it is recommended that the owner carry out control of the construction contract more optimally and the provider is more professional at work. This study analyzes the factors that cause construction contract terminations only from the owner's point of view, therefore further research is still needed from the point of view of job providers and supervisors to see the characteristics and possibilities of other different factors.
- 17 September 2024
- Published by Universitas Negeri Padang in CIVED
- Vol. 11 (3) , 767-782
Open AccessIdentification of Factors Causing Construction Contract Breaks and Recommendations for Improvement in West Pasaman Regency
The implementation of construction projects in the Regional Government of West Pasaman Regency almost every year there is always a termination of the contract which results in not achieving the government's goal of increasing the standard of living of the community because the targets set by the Government are delayed and hampered. This research was carried out which aims to identify the causes of contract termination in the implementation of construction service procurement in West Pasaman Regency, analyze and evaluate the causes of contract termination in construction implementation, and determine recommendations for improvement to prevent contract termination in the implementation of construction service procurement in Pasaman Regency West. This study uses descriptive qualitative analysis based on the results of interviews with CMO and TIO for work that has terminated its contract and analyzes administrative data on termination of contracts for construction work which has experienced termination of contract. The methods used in the discussion to find out the factors that cause construction contract termination are the Fault Tree Analysis (FTA) Method and the Obtain Cut Set (MOCUS) Method. From this study it can be concluded that the main factor causing the breakup of construction contracts is the owner's firmness with the performance of the provider, the provider being evaluated is unable to carry out the work, the contract termination should be carried out earlier, not waiting for the end of the year and not providing an extension of the implementation period past the fiscal year and the owner is negligent. in controlling the contract. While the supporting factors that cause the termination of the contract are the provider's fault, namely poor project management, the practice of borrowing company flags, not having capital, not heeding the instructions of the owner and field supervisor as well as other factors, namely disturbance factors from the community around the work location, weather, selection of providers and material supply. For recommendations for future improvements, it is recommended that the owner carry out control of the construction contract more optimally and the provider is more professional at work. This study analyzes the factors that cause construction contract terminations only from the owner's point of view, therefore further research is still needed from the point of view of job providers and supervisors to see the characteristics and possibilities of other different factors.
- Open Access
- 17 September 2024
- Published by Universitas Negeri Padang in CIVED
- Vol. 11 (3) , 1098-1106
Effect of Adding Polypropylene Plastic Waste on Compressive Strength and Flexural Strength Concrete
Indonesia is the second largest producer of plastic waste in the world after China with an annual contribution of 187.2 million tons of plastic waste. This study aims to analyze the effect of the addition of plastic seeds with polypropylene substitution on the compressive strength and flexural strength of concrete with the intention of reducing waste waste and utilizing it as a concrete mixing material and making concrete properties into green concrete. The method used is the experimental method by making several variations of concrete mixtures with plastic seeds of polypropylene type as a substitute for part of the sand. The mixing of plastic seeds is divided into several variations, namely, 3% polypropylene seeds and 6% polypropylene seeds. Analysis of the test results of the addition of polypropylene seeds compared to the concrete mixture without polypropylene seeds resulted in a compressive strength of 24.14 MPa for the addition of 3%, as well as a value of 23.25 MPa for the addition of 6% each at 28 days of concrete age. As for the flexural strength, an increase value of 0.16 MPa was obtained for the addition of 6% and the addition of 3% at the age of 28 days. This study shows that the results of the study have reached the planned quality target, namely the quality of fc'20 Mpa.
- 17 September 2024
- Published by Universitas Negeri Padang in CIVED
- Vol. 11 (3) , 1098-1106
Open AccessEffect of Adding Polypropylene Plastic Waste on Compressive Strength and Flexural Strength Concrete
Indonesia is the second largest producer of plastic waste in the world after China with an annual contribution of 187.2 million tons of plastic waste. This study aims to analyze the effect of the addition of plastic seeds with polypropylene substitution on the compressive strength and flexural strength of concrete with the intention of reducing waste waste and utilizing it as a concrete mixing material and making concrete properties into green concrete. The method used is the experimental method by making several variations of concrete mixtures with plastic seeds of polypropylene type as a substitute for part of the sand. The mixing of plastic seeds is divided into several variations, namely, 3% polypropylene seeds and 6% polypropylene seeds. Analysis of the test results of the addition of polypropylene seeds compared to the concrete mixture without polypropylene seeds resulted in a compressive strength of 24.14 MPa for the addition of 3%, as well as a value of 23.25 MPa for the addition of 6% each at 28 days of concrete age. As for the flexural strength, an increase value of 0.16 MPa was obtained for the addition of 6% and the addition of 3% at the age of 28 days. This study shows that the results of the study have reached the planned quality target, namely the quality of fc'20 Mpa.
- Open Access
- 17 September 2024
- Published by Universitas Negeri Padang in CIVED
- Vol. 11 (3) , 991-998
The Influence of Biocementation on the Compressive Strength of Fireless Bricks
Waste sludge from the Water Treatment Plant (IPA) is used as an additive in the manufacture of environmentally friendly bricks to reduce river pollution. In the process of making these bricks, clay is mixed with sewage sludge at 15% of the total weight of clay. In addition, to reduce the impact of air pollution, the bricks were not burned. This research emphasizes the importance of using environmentally friendly alternative materials in brick production. Bacillus Huizhouensis bacteria was applied to strengthen bricks with variations of bacteria concentration of 8%, as well as bacterial culture age variations of 8 hours, 10 hours, and 15 hours. After the bricks were matured for 14 days, the test results showed that bricks using 8% bacterial solution with 10 hours of culture increased by 70.65% to 1.57 MPa, compared to normal bricks of 0.92 MPa. So that bricks with 8% bacteria with a culture age of 10 hours with a period of 14 days have a higher value than normal bricks.
- 17 September 2024
- Published by Universitas Negeri Padang in CIVED
- Vol. 11 (3) , 991-998
Open AccessThe Influence of Biocementation on the Compressive Strength of Fireless Bricks
Waste sludge from the Water Treatment Plant (IPA) is used as an additive in the manufacture of environmentally friendly bricks to reduce river pollution. In the process of making these bricks, clay is mixed with sewage sludge at 15% of the total weight of clay. In addition, to reduce the impact of air pollution, the bricks were not burned. This research emphasizes the importance of using environmentally friendly alternative materials in brick production. Bacillus Huizhouensis bacteria was applied to strengthen bricks with variations of bacteria concentration of 8%, as well as bacterial culture age variations of 8 hours, 10 hours, and 15 hours. After the bricks were matured for 14 days, the test results showed that bricks using 8% bacterial solution with 10 hours of culture increased by 70.65% to 1.57 MPa, compared to normal bricks of 0.92 MPa. So that bricks with 8% bacteria with a culture age of 10 hours with a period of 14 days have a higher value than normal bricks.